Topics covered:
Introduction to QM
Master Data in QM (Inspection Plan, Quality Management View in Material Master, Inspection Types, MICs, Sampling Scheme, Inspection Lot)
Inspection Lot
Inspection Plan
Sampling Scheme
MIC
Rate this question:
Receiving cannot be done as the Inspection setup must be present for the material
Receiving can be done even if the inspection setup is missing for the material
MICs and Sampling scheme should be assigned in the Inspection Plan, only then a material can be received
Receiving can only be done if the inspection setup is present and the Inspection plan is created
Rate this question:
Plant and Material
Inspection Lot and MICs
Inspection Lot, MICs and Sampling Scheme
None of the above
Rate this question:
Material Type
Inspection Type
Plant
All of the above
Rate this question:
True
False
Rate this question:
Depends on the type of the material
Depends on the quantity received
Randomly
None of the above
Rate this question:
There is no limit to it. User can define as many types of MICs he/she wants
Two types
Four Types
Only one type of MIC exists
Rate this question:
One
Two
As many as we want
Not more than 100
Rate this question:
Complete Copy Model
Reference Characteristics
Released
Can no longer be used
Rate this question: