In case of official Master Schedule revision - ECI DIR C/O schedule...
After off-tool target date (parts due date) is determined, designer...
Select the install location for a DIO part.
ILA parts contain the digits "YY" (e.g.: 67918-YY050).
Major ECI C/O date considers plant PC order date.
PPM is the group responsible to create draft top items list for...
What methodology should each group be using to find true root cause...
_______________ is an assembly instruction issued by Design to...
There is no ECI Cut-off date coordination for QCS, because it is not...
Which of the following is based on a measure of historical lead times...
The main purpose of drawing coordination is to determine drawing...
A Major ECI issued after ECI Cut-off date & after plant order date...
KVC vanning timing should be considered during ECI/DIR C/O schedule...
Who leads Star 4 reflection, "Initial Field Quality...
"Yokoten to future projects" is one of the main purposes for...
PPO parts are in SMS.
Late ECI issuance (after C/O date) is possible, but requires...
The purpose of Drawing F/U is to ensure that agreed drawing issue...
When a Division Leads a reflection activity, they are not required to...
Select the install location for a PPO part.
It ______ Design responsibility to coordinate agreed on TIS...
PPM is responsible to ensure that projects reflections are yokotened...
PPM is responsible to update revised drawing issue date in...
OE parts are potentially scrapped during PPO installation.
What is the correct definition of Static Evaluation?
Which group is responsible for sending out coordination results...
If Designer cannot meet the original/agreed drawing issuance plan...
PPM co-chairs the Drawing Follow Up meeting together with _________.
Which of the following is the final supplier drawing approved by...
Which group is a division of TMS specifically responsible for actual...
When is the expected completion timing for Star 3?
What is the scope of reflection activity?
Which of the following is not an input into the Drawing Coordination...
Which of the following items are not needed to begin ECI DIR schedule...
When is DIR-ECI Cut-off targeted issue timing?
Which division is responsible for creating and issuing the weekly...
What is the final output of the full ILA selection process?
What level should the reflection leaders be?
DIR/ECI cut off schedule coordination is led by Z with support...
The ECI Cut-off schedule does not need to be issued by Z on a Tech...
If supplier drawing request date is _________ than designers issuance...
Who is the window group responsible for follow-up with suppliers?
The "Strategy" activity (including PPO/ILA Project Kick off...
If a drawing coordination meeting is required, the designer should...
Drawings are coordinated to meet _____________ Target.
Drawing Issuance report includes the list of drawings to be issued in...
PPM is the leader for Star 1 & 2 reflections.
What is the official paper request to Design from Sales and/or...
Drawing coordination date information, such as an agreed date, is...
The purpose of DIR-ECI Cut-off schedule coordination is to align the...
Which reflection step will be typically reported out at NM3 for major...
What method is used to drive the schedule for report completion?
Which of the following topics are within the scope of Star 1...
Which column in DCSI shows design's intended plan date to release...
What is the output in for ILA Key process Step 8, "RE +...
What is the general rule for what we consider "ECI-cut-off...
How many weeks before the 1st planned drawing issuance date, should...