Reviewed by Editorial Team
The ProProfs editorial team is comprised of experienced subject matter experts. They've collectively created over 10,000 quizzes and lessons, serving over 100 million users. Our team includes in-house content moderators and subject matter experts, as well as a global network of rigorously trained contributors. All adhere to our comprehensive editorial guidelines, ensuring the delivery of high-quality content.
Learn about Our Editorial Process
| By Abhijai
A
Abhijai
Community Contributor
Quizzes Created: 2 | Total Attempts: 219
| Attempts: 129 | Questions: 15
Please wait...
Question 1 / 15
0 %
0/100
Score 0/100
1. In the cost report, which fit of the quick release for steering should be need to mentioned

Explanation

The cost report should mention the fit of the quick release for steering as "Loose Fit." This means that the quick release has some clearance and is not tightly fitted.

Submit
Please wait...
About This Quiz
Vignesh Uma Quiz -5 - Quiz

The Vignesh Uma Quiz -5 tests knowledge on business plan presentations, team coordination during competitive events, and related penalties and regulations, focusing on practical scenarios and problem-solving in team settings.

Personalize your quiz and earn a certificate with your name on it!
2. The tech inspection responsible person in a team is a member other than the registered captain and two deputies. He was unable to perform tech inspection as asked by inspector ?What action will be taken?

Explanation

If the tech inspection responsible person is unable to perform the tech inspection as asked by the inspector, the team will have to leave the area and the tech inspection will end. This is because the tech inspection is a crucial part of the process and if it cannot be conducted properly, the team cannot proceed further. The captain or the two deputies cannot conduct the tech inspection immediately as they are not the designated responsible person for it. Swapping the member with another teammate is not mentioned as an option, and the action taken does not depend on the inspector's irritation. Therefore, the correct answer is that the team has to leave the area and the tech inspection will end.

Submit
3. A team finished in the LAST postion in the BPP finals. What could be their minimum score amongst the following ?

Explanation

The team finished in the last position in the BPP finals, which means they performed worse than all the other teams. Therefore, their score must be lower than any other team's score. Among the given options, the minimum score would be 0, as it is the lowest possible score.

Submit
4. Let the ground clearance of a car be 50mm,where its lowest point is the inside point between the front hoop and main hoop.Then which of the following can be the height of the upper side impact member?

Explanation

The ground clearance of a car refers to the distance between the lowest point of the car and the ground. In this question, it is stated that the lowest point is the inside point between the front hoop and main hoop. Therefore, the height of the upper side impact member should be less than the ground clearance, as it is located above the lowest point. Among the given options, the only height that satisfies this condition is 335mm.

Submit
5. Which statement is incorrect-

Explanation

not-available-via-ai

Submit
6. Suppose 3 team member presented  Business Plan Presentation  for Team A,after the presentation during the question and answer session,team got stuck in one question asked by the judges and team member of the same team not part of initial business plan presentation team came running to the podium ,and answered the question correctly ,what will happen in such cases ??

Explanation

If a team member who was not part of the initial business plan presentation team comes running to the podium and answers a question correctly during the question and answer session, their answer will not be accepted.

Submit
7. What is the format and minimum file size to submit the structural equivalency 3D model for FSG?

Explanation

not-available-via-ai

Submit
8. A team successfully cleared the FSG registration quiz and there were 26 teams on the waitlist then.They couldn't afford the entry fees and deregistered from the event . However 20 hours later they got the funds and decided to go for the event.What will be their registration status?

Explanation

Since the team had already deregistered from the event, they will not be able to directly register again. Therefore, they will be placed back on the waitlist, but this time as the 27th team.

Submit
9. A team using RON98 fuel's measured fuel volume consumption was 5.6L . Team B uses E85, Team A wanted to compare their fuel volume with Team B. So Team A's fuel consumption when made comparable to TEAM B is , 

Explanation

Team A's fuel consumption when made comparable to Team B can be calculated by multiplying Team A's fuel consumption (5.6L) by the energy content ratio of RON98 fuel to E85 fuel. Since E85 has a lower energy content than RON98, the fuel consumption needs to be adjusted to account for this difference. Therefore, the correct answer is 7.84L.

Submit
10. During Endurance, a driver was driving recklessly and missed two slalom gates,then he was black flagged by the marshall which he ignored and completed endurance? What will be the total penalty only because of the above mentioned circumstances?

Explanation

The driver in question missed two slalom gates and ignored a black flag from the marshal, indicating reckless driving. These actions would result in a penalty. The answer of 80 seconds suggests that this is the total penalty for the mentioned circumstances.

Submit
11. Which of the following is not true regarding monocoque attachment points ?

Explanation

The statement that hand calculations regarding monocoque attachment points are not accepted anywhere is not true. Hand calculations are commonly used in engineering to analyze and design structures, including attachment points. Therefore, this statement is false.

Submit
12. A team uses SAE 4340 steel which is stronger than SAE 4130(assume), to make steel tubes for their front and main hoops.If they show physical testing,will they face difficulty in TI if the wall thickness is 1.4mm

Explanation

The team will face difficulty in TI (Technical Inspection) if they use SAE 4340 steel with a wall thickness of 1.4mm for their steel tubes. This is because the strength of the steel alone is not the only factor considered in TI. The wall thickness also plays a crucial role in determining the structural integrity and safety of the tubes. A wall thickness of 1.4mm may not meet the required standards and regulations for TI, regardless of the strength of the steel used. Therefore, the team will face difficulty in passing TI with these specifications.

Submit
13. Which of the following is true about P1 ?Assume data to be obatained from Monocoque laminate testing 

Explanation

The correct answer is "both b and c." This means that both options b and c are true about P1. Option b states that the perimeter shear strength of the monocoque laminate in the front bulkhead support structure can be less than 4kN at P1 for a section with a diameter of 25 mm. Option c states that P1 is used to determine skin shear strength. Therefore, both statements b and c are true about P1.

Submit
14. A team used composite material for manufacturing of body panels,the composite consisted  of 20 % carbon fiber ,20 % Kevlar and 60 % glass fiber ,they reported a cost of $200 for the panel ,but it was found that it had 30 % carbon fiber ,what  $penalty will be imposed?Assume total amount of fiber laid to be 13 m^2 and cost of carbon fiber is $30 per m^2,Kevlar is $40 m^2 and glass fiber be $50  m^2.  

Explanation

The penalty for using a higher percentage of carbon fiber than reported is that the cost of the panel will be considered as $650. This is because the cost of carbon fiber is $30 per m^2, and since the total amount of fiber laid is 13 m^2, the additional 10% of carbon fiber will result in an extra cost of $30 per m^2. Therefore, the total cost of the panel will be $200 + ($30 * 10% * 13) = $650.

Submit
15. A team submitted SES on the last day of submission day,and after that they get officials request for 3 corrections in the document,the team submit the corrected document just before starting of 13th  days ,if the penalty for each 24 hours is 5 points after 168 hours ,what will be total penalty on the team ?

Explanation

The team submitted the corrected document just before the starting of the 13th day, which means they submitted it within the 168-hour time frame. Therefore, they did not exceed the 168 hours, and no penalty points will be deducted. Hence, the total penalty on the team is none of the above.

Submit
View My Results

Quiz Review Timeline (Updated): Mar 19, 2023 +

Our quizzes are rigorously reviewed, monitored and continuously updated by our expert board to maintain accuracy, relevance, and timeliness.

  • Current Version
  • Mar 19, 2023
    Quiz Edited by
    ProProfs Editorial Team
  • Jan 13, 2017
    Quiz Created by
    Abhijai
Cancel
  • All
    All (15)
  • Unanswered
    Unanswered ()
  • Answered
    Answered ()
In the cost report, which fit of the quick release for steering should...
The tech inspection responsible person in a team is a member other...
A team finished in the LAST postion in the BPP finals. What could be...
Let the ground clearance of a car be 50mm,where its lowest point is...
Which statement is incorrect-
Suppose 3 team member presented  Business Plan Presentation...
What is the format and minimum file size to submit the structural...
A team successfully cleared the FSG registration quiz and there were...
A team using RON98 fuel's measured fuel volume consumption was 5.6L ....
During Endurance, a driver was driving recklessly and missed two...
Which of the following is not true regarding monocoque attachment...
A team uses SAE 4340 steel which is stronger than SAE 4130(assume), to...
Which of the following is true about P1 ?Assume data to be obatained...
A team used composite material for manufacturing of body panels,the...
A team submitted SES on the last day of submission day,and after that...
Alert!

Advertisement