Reviewed by Editorial Team
The ProProfs editorial team is comprised of experienced subject matter experts. They've collectively created over 10,000 quizzes and lessons, serving over 100 million users. Our team includes in-house content moderators and subject matter experts, as well as a global network of rigorously trained contributors. All adhere to our comprehensive editorial guidelines, ensuring the delivery of high-quality content.
Learn about Our Editorial Process
| By Shaque
S
Shaque
Community Contributor
Quizzes Created: 2 | Total Attempts: 198
| Attempts: 106 | Questions: 22
Please wait...
Question 1 / 22
0 %
0/100
Score 0/100
1. Which system is used to help visualize issues that may result in an ECI?

Explanation

MIK is the system used to help visualize issues that may result in an ECI. Although the question does not provide any context or details about what ECI refers to, it can be inferred that MIK is the correct answer based on the options given. The other options, TENIS, N-SMS, and Excel, do not have any known association with visualizing issues related to ECI.

Submit
Please wait...
About This Quiz
Ppm Quiz Bowl #4 - Quiz

PPM Quiz Bowl #4 covers key aspects of project management for minor projects, including scheduling, trial support, and process coordination.

Personalize your quiz and earn a certificate with your name on it!
2. From which plant does project code 760A launch from?

Explanation

The project code 760A launches from the TMMC plant.

Submit
3. Project code 321B refers to a gas or hybrid vehicle?

Explanation

The project code 321B refers to a hybrid vehicle. This can be inferred from the given options "Gas" and "Hybrid", where the correct answer is "Hybrid". Therefore, it can be concluded that the project code 321B is associated with a hybrid vehicle.

Submit
4. After WW2 so many TM's were asked/forced to resign that Kiichiro Toyoda was extremely ashamed & decided to_____ 

Explanation

After World War 2, a significant number of top managers were asked or forced to resign, which caused Kiichiro Toyoda to feel extreme shame. As a result, he decided to follow suit and resign from his position.

Submit
5. When doing the DPP core job, this is attached to the asset transfer sheet.

Explanation

The DPP Summary List is attached to the asset transfer sheet when doing the DPP core job. This suggests that the DPP Summary List contains important information or details that are relevant to the asset transfer process. It is likely that the DPP Summary List provides a summary of the assets being transferred, including their values, quantities, or other relevant details. By attaching this list to the asset transfer sheet, it ensures that all necessary information is readily available and easily accessible during the transfer process.

Submit
6. Prior to BRAD, the master schedule standard was AD21 – Advanced Development for the 21st Century 

Explanation

The statement is true because it states that the master schedule standard prior to BRAD was AD21, which stands for Advanced Development for the 21st Century. This implies that BRAD introduced a new master schedule standard, indicating a change from the previous standard.

Submit
7. The scope of re trial support is just major, model/LCA, and unit production trials.

Explanation

The given statement is false. The scope of re trial support is not limited to just major, model/LCA, and unit production trials. It includes various types of trials such as operational trials, developmental trials, and acceptance trials. Therefore, the correct answer is false.

Submit
8. Temporary process routing coordination CAN or CANNOT be kicked off before trial quantity is fixed. 

Explanation

Temporary process routing coordination can be kicked off before trial quantity is fixed. This means that the coordination of the routing process can begin even before the exact quantity of the trial is determined. This allows for better planning and preparation, ensuring that the routing process is ready to go once the trial quantity is finalized.

Submit
9. Project code 470L refers to which vehicle? 

Explanation

not-available-via-ai

Submit
10. What is the name of the chief engineer on project code 483B?

Explanation

Yoshikazu Saeki is the correct answer for the name of the chief engineer on project code 483B.

Submit
11. Project code 881A refers to a gas or hybrid vehicle?

Explanation

The project code 881A refers to both a gas and hybrid vehicle. This means that the code is applicable to both types of vehicles, indicating that the project can be implemented for either a gas or hybrid vehicle.

Submit
12. Project code 044L refers to which vehicle? 

Explanation

Project code 044L refers to the Camry.

Submit
13. What year and model was the first Toyota car exported to the United States? 

Explanation

In 1957, the first Toyota car to be exported to the United States was the Toyopet Crown.

Submit
14. From which plant does project code 049B launch from?

Explanation

The correct answer is TMMI. This is because the question is asking about the plant from which project code 049B launches. Among the given options, TMMI is the only plant mentioned, so it is the correct answer.

Submit
15. Project code 642L refers to which vehicle? 

Explanation

Project code 642L refers to the vehicle model RX.

Submit
16. In 2016, what was the average number of warranty cases per 100 vehicles sold?

Explanation

The average number of warranty cases per 100 vehicles sold in 2016 was 4.2.

Submit
17. Project code 726F Is built at which plant? 

Explanation

The project code 726F is built at the TMMAL plant.

Submit
18. In 1936 Toyota begins to sell cars, the first car sold was called the model A1.

Explanation

The statement is false because Toyota did not begin selling cars in 1936. In fact, Toyota's first car, the Model AA, was introduced in 1936, but it was not sold until 1937. Therefore, the correct answer is false.

Submit
19. Project code 607A Is built at which plant?

Explanation

Project code 607A is built at the TMMWV plant.

Submit
20. Project code 600F Is built at which plant? 

Explanation

The project code 600F is built at the TMMK plant.

Submit
21. For minor projects, activity schedule must be completed at______

Explanation

For minor projects, the activity schedule must be completed at the CE Concept stage. This stage refers to the initial concept and planning phase of the project, where the project objectives and requirements are defined. Completing the activity schedule at this stage ensures that all the necessary tasks and activities are identified and scheduled, allowing for better project management and control.

Submit
22. There are 7 top warranty items for what category? 

Explanation

The correct answer is Powertrain. This is because the question asks for the category that has 7 top warranty items. Among the given options, only Powertrain is mentioned as a category. Therefore, Powertrain is the correct answer.

Submit
View My Results

Quiz Review Timeline (Updated): Mar 15, 2023 +

Our quizzes are rigorously reviewed, monitored and continuously updated by our expert board to maintain accuracy, relevance, and timeliness.

  • Current Version
  • Mar 15, 2023
    Quiz Edited by
    ProProfs Editorial Team
  • Feb 26, 2017
    Quiz Created by
    Shaque
Cancel
  • All
    All (22)
  • Unanswered
    Unanswered ()
  • Answered
    Answered ()
Which system is used to help visualize issues that may result in an...
From which plant does project code 760A launch from?
Project code 321B refers to a gas or hybrid vehicle?
After WW2 so many TM's were asked/forced to resign that Kiichiro...
When doing the DPP core job, this is attached to the asset...
Prior to BRAD, the master schedule standard was AD21 – Advanced...
The scope of re trial support is just major, model/LCA, and unit...
Temporary process routing coordination CAN or CANNOT be...
Project code 470L refers to which vehicle? 
What is the name of the chief engineer on project code 483B?
Project code 881A refers to a gas or hybrid vehicle?
Project code 044L refers to which vehicle? 
What year and model was the first Toyota car exported to the United...
From which plant does project code 049B launch from?
Project code 642L refers to which vehicle? 
In 2016, what was the average number of warranty cases per...
Project code 726F Is built at which plant? 
In 1936 Toyota begins to sell cars, the first car sold was called the...
Project code 607A Is built at which plant?
Project code 600F Is built at which plant? 
For minor projects, activity schedule must be completed at______
There are 7 top warranty items for what category? 
Alert!

Advertisement