1.
Training detachments (TDs) are administratively assigned to which MAJCOM?
Correct Answer
D. Air Education And Training Command (AETC)`
Explanation
Training detachments (TDs) are administratively assigned to the Air Education And Training Command (AETC). AETC is responsible for the training and education of Air Force personnel. As such, it is logical that TDs, which are units specifically focused on training, would fall under the jurisdiction of AETC. The other options, Air Combat Command (ACC), Air Training Command (ATC), and Air Reserve Command (AFRC), do not have the same emphasis on training and education, making AETC the most appropriate choice.
2.
The block training method is normally used to teach maintenance training flight(MTF) training course?
Correct Answer
C. Mx orientation
Explanation
The mx orientation course is typically taught using the block training method. This method allows for a concentrated and focused approach to teaching the necessary skills and knowledge required for maintenance training flight. By organizing the course into blocks, students can fully immerse themselves in the subject matter, allowing for better retention and understanding of the material. The mx orientation course specifically covers important topics related to maintenance, making it an ideal fit for the block training method.
3.
How often must the Maintenance Operations Officer/Maintenance Superintendant review and sign the special certificatio roster (SCR)?
Correct Answer
B. Semi-Annually
Explanation
The Maintenance Operations Officer/Maintenance Superintendent must review and sign the special certification roster (SCR) twice a year, which is known as semi-annually. This means that the SCR needs to be reviewed and signed every six months. This ensures that the officer or superintendent stays updated on the special certifications and maintains the necessary records for maintenance operations.
4.
In order to given the authority to downgrade a "Red-X" an individual must be approved by the montenance group commander (MXG/CC) and hold the minimum grade of
Correct Answer
B. MSgt
Explanation
To be authorized to downgrade a "Red-X," an individual must be approved by the maintenance group commander (MXG/CC) and hold a minimum grade of MSgt.
5.
TBA provides Air Force personnel with global real time
Correct Answer
D. Visiability of technical qualifications, certifications, and training statuses of personnel
Explanation
TBA (presumably an acronym for a specific system or platform) offers Air Force personnel the ability to see the technical qualifications, certifications, and training statuses of individuals. This means that personnel can easily view and track the skills and training of themselves and their colleagues. This visibility is important for managing and coordinating personnel and ensuring that the necessary qualifications are met for various tasks and roles within the Air Force.
6.
In the TBA, what type of notification does the "System Message" board provide in addition to software releases, projected downtimes, and training update info?
Correct Answer
C. Application Problems
Explanation
The "System Message" board provides notifications about application problems in addition to software releases, projected downtimes, and training update info. This means that users can receive updates and alerts regarding any issues or glitches with the application, allowing them to stay informed and potentially take appropriate actions to address these problems.
7.
What training phase has three four sub-phases: multiphase, MAJCOM mandatory,freeflow,and maintenance qualification training?
Correct Answer
B. II
Explanation
The correct answer is II. The training phase that has three sub-phases: multiphase, MAJCOM mandatory, freeflow, and maintenance qualification training is Phase II. This phase is divided into these sub-phases to ensure a comprehensive and structured training process. The multiphase allows trainees to gain a broad understanding of the subject matter, the MAJCOM mandatory phase focuses on specific requirements set by the Major Command, the freeflow phase allows trainees to apply their knowledge in real-world scenarios, and the maintenance qualification training phase ensures that trainees are fully qualified to perform their designated tasks.
8.
What continuation training consists of academic and practical hands-on courses that complement initial skills trianing recieved through AETC mission ready airmen (MRA) and the training detatchment(TD) courses?
Correct Answer
A. Maintenance qualification
Explanation
Continuation training consists of academic and practical hands-on courses that complement initial skills training received through AETC mission ready airmen (MRA) and the training detachment (TD) courses. Maintenance qualification refers to the training required to obtain and maintain the necessary qualifications and skills for performing maintenance tasks. This type of training ensures that airmen are knowledgeable and proficient in their specific maintenance roles and responsibilities. Therefore, maintenance qualification is the correct answer as it aligns with the purpose of continuation training in enhancing and maintaining the skills of maintenance personnel.
9.
How often does the maintenance training flight (MTF) provide a status of training (SOT) briefing to the maintenance group commander?
Correct Answer
A. Monthly
Explanation
The maintenance training flight (MTF) provides a status of training (SOT) briefing to the maintenance group commander on a monthly basis. This means that every month, the MTF updates the maintenance group commander on the current status of the training being conducted. This regular briefing allows the commander to stay informed and make informed decisions regarding the training program and any necessary adjustments or improvements.
10.
An individual comes due for a trining recertification while TDY, on leave, or incompacitated. provided it has not been more than 60 days since the original due date, how many days are allowed after returning before decertification is required?
Correct Answer
B. 30
Explanation
If an individual is unable to complete their training recertification due to being TDY (Temporary Duty), on leave, or incapacitated, they are allowed 30 days after returning before decertification is required. This means that they have a grace period of 30 days to complete their recertification once they are back from their TDY, leave, or incapacitation.
11.
Who is responsible for conducting an interview with both the trainee and his/her supervisor before a trainee starts career development course?
Correct Answer
C. Unit training manager
Explanation
The unit training manager is responsible for conducting an interview with both the trainee and his/her supervisor before a trainee starts a career development course. This role is typically responsible for overseeing and coordinating training programs within a unit, ensuring that all personnel receive the necessary training to perform their duties effectively. Conducting interviews with both the trainee and the supervisor allows the unit training manager to gather information about the trainee's current skills and knowledge, as well as any specific training needs or goals. This information can then be used to tailor the career development course to meet the trainee's individual needs.
12.
Manpower authorizations are
Correct Answer
A. Funded
Explanation
Manpower authorizations refer to the allocation of personnel resources within an organization. When they are "funded," it means that the necessary financial resources have been allocated to support the authorized positions. This implies that the organization has the necessary budget to cover the costs associated with employing the authorized personnel. On the other hand, if the authorizations are "unfunded," it means that there is no allocated budget to support these positions, making it difficult or impossible to hire personnel to fill these roles. Therefore, the correct answer is "funded."
13.
A meeting to discuss manning issues in the maintenance group (MXG) is normally held?
Correct Answer
B. Monthly
Explanation
A meeting to discuss manning issues in the maintenance group (MXG) is normally held monthly. This suggests that the MXG regularly convenes to address and resolve any staffing concerns within the group. Holding these meetings on a monthly basis allows for consistent communication and collaboration among the members, ensuring that any manpower issues are addressed in a timely manner.
14.
The maximum continuous duty time you can schedule your workers for without getting maintenance group commander (MXG/CC) approval is
Correct Answer
A. 12 hours
Explanation
The maximum continuous duty time that workers can be scheduled for without getting maintenance group commander (MXG/CC) approval is 12 hours. This means that workers can work for a maximum of 12 hours in a row without needing additional approval from the MXG/CC.
15.
Maintenance group commanders are the final approval authority for exceeding a 12-hour shift up to
Correct Answer
C. 16 hours
Explanation
Maintenance group commanders have the ultimate authority to approve exceeding a 12-hour shift up to 16 hours. This means that if there is a need for extended work hours in the maintenance group, the commander has the power to grant permission for the shift to be extended up to 16 hours. This allows for flexibility in scheduling and ensures that the necessary maintenance work can be completed within a reasonable timeframe.
16.
Which agency is normally responsible for monitoring the overall maintenance supply interface and resolving supply order problems?
Correct Answer
A. Maintenance supply liaison
Explanation
The maintenance supply liaison is typically responsible for monitoring the overall maintenance supply interface and resolving supply order problems. They act as a bridge between maintenance operations and the supply chain, ensuring that the necessary supplies are available and addressing any issues that may arise in the supply process. This role involves coordinating with various stakeholders, such as suppliers and maintenance personnel, to ensure smooth and efficient supply operations.
17.
Maintenance supply liaison personnel report directly to the commander of the
Correct Answer
B. Logistics readiness squadron (LRS)
Explanation
Maintenance supply liaison personnel report directly to the commander of the logistics readiness squadron (LRS). The LRS is responsible for providing logistics support to the maintenance squadron and other units within the organization. They coordinate and manage supply chain operations, including procurement, storage, and distribution of equipment and supplies. The maintenance supply liaison personnel work closely with the LRS commander to ensure that maintenance units have the necessary resources and materials to effectively carry out their missions.
18.
Which of the following is not normally a maintenance supply liaison duty?
Correct Answer
D. Collecting and turning in expendable,excess, and surplus precious metal bearing assets
Explanation
The correct answer is "collecting and turning in expendable, excess, and surplus precious metal bearing assets." This is not normally a maintenance supply liaison duty because it involves the collection and disposal of assets, which is typically handled by a separate department or personnel. Maintenance supply liaisons are responsible for tasks such as monitoring back-ordered requisitions, advising supervisors on supply management documents, and soliciting and consolidating inputs for reference lists.
19.
The assets in a high priority mission support kit (HPMSK) should be transferred into the host bases standard base supply system account after how many days?
Correct Answer
B. 30
Explanation
After 30 days, the assets in a high priority mission support kit (HPMSK) should be transferred into the host bases standard base supply system account.
20.
Which expendability, recoverability, and reparability codes (ERRC) must be assigned to an asset before it can be placed in bench stock?
Correct Answer
D. XB3
Explanation
The correct answer is XB3. The expendability, recoverability, and reparability codes (ERRC) are used to determine the level of maintenance required for an asset. XB3 indicates that the asset is expendable, meaning it is not repaired or overhauled but instead discarded and replaced when it becomes unserviceable. This code suggests that the asset can be easily replaced and does not require extensive repair or maintenance.
21.
The goal for bench stock assets is to establish levels to provide how many days of supply?
Correct Answer
A. 30
Explanation
The goal for bench stock assets is to establish levels that provide 30 days of supply. This means that the organization wants to have enough stock on hand to cover their needs for a period of 30 days. By having this amount of inventory, they can ensure that they have enough resources to continue operations without running out of supplies. This helps to prevent disruptions in production or service delivery.
22.
Provided it is still serviceable, which type of shelf life item are you allowed to inspect and re-mark with a new expiration date?
Correct Answer
B. II
Explanation
You are allowed to inspect and re-mark with a new expiration date type II shelf life items, provided they are still serviceable.
23.
Who in the maintenance group (MXG) is responsible for ensuring the capability exists to meet local manufacture requirments?
Correct Answer
D. Maintenance Squadron (MXS)operations officer/Maintenance Superintendant (MX SUPT)
Explanation
The correct answer is the Maintenance Squadron (MXS) operations officer/Maintenance Superintendent (MX SUPT). This individual is responsible for overseeing the operations and maintenance activities within the Maintenance Squadron, including ensuring that the capability exists to meet local manufacture requirements. They work closely with the MXG commander, MXG superintendent, and MXG deputy commander to coordinate and execute maintenance operations effectively.
24.
What agensy acts as a central repository of engineering drawing and other engineering data?
Correct Answer
B.
engineering Data Service Center
Explanation
The Engineering Data Service Center acts as a central repository for engineering drawing and other engineering data. This means that it is responsible for storing and organizing all engineering-related information and making it easily accessible to those who need it. The center ensures that all engineering data is properly managed and maintained, allowing engineers and other professionals to access and utilize the information effectively.
25.
Which of the following is not an obvious sign of pollution?
Correct Answer
D. Cloudy water
Explanation
Cloudy water is not an obvious sign of pollution because it can be caused by various factors other than pollution, such as sediment or minerals in the water. While pollution can certainly cause water to become cloudy, it is not the only explanation for this phenomenon. On the other hand, oil sheen on standing water, stressed vegetation, and stains on the ground are all more directly linked to pollution and can be clear indicators of its presence.
26.
Who is responsible for developing a hazard communication (HAZCOM) training plan to notify personnel of all known hazards they may be exposed to in a particular work-center?
Correct Answer
B. Section Supervisor
Explanation
The Section Supervisor is responsible for developing a hazard communication (HAZCOM) training plan to notify personnel of all known hazards they may be exposed to in a particular work-center. This individual is in charge of overseeing the day-to-day operations and safety of the work-center, making them the most suitable person to develop and implement the necessary training plan to ensure that all personnel are aware of the hazards and how to mitigate them.
27.
Which tag should you use to document that a part has been properly drained and/or purged?
Correct Answer
A. AFTO Form 20, Caution Tag
28.
Who must appoint an individual to be an equipment account custodian?
Correct Answer
B. Squadron Commander
Explanation
The Squadron Commander must appoint an individual to be an equipment account custodian. This individual is responsible for managing and maintaining the equipment assigned to the squadron. The Squadron Commander has the authority to select someone who is qualified and trustworthy to handle this important role.
29.
What specific block of supply training must an individual receive before assuming duties as a due-in-from-maintenance (DIFM) monitor?
Correct Answer
C. IIB
Explanation
Before assuming duties as a due-in-from-maintenance (DIFM) monitor, an individual must receive specific block IIB of supply training.
30.
What form is used to document all reports on surveys (ROS)?
Correct Answer
D. DD Form 200, Financial Liability, Investigation of Property Loss
Explanation
The correct answer is DD Form 200, Financial Liability, Investigation of Property Loss. This form is used to document all reports on surveys (ROS). It is specifically designed for investigating property loss and determining financial liability. The form provides a detailed record of the investigation, including information such as the date and location of the loss, a description of the property, the circumstances surrounding the loss, and the findings of the investigation. It is used by the military to ensure accountability and proper handling of property loss incidents.
31.
Which Logistics Readiness Squadron (LRS) office accounts for special purpose recoverable authorized maintenance (SPRAM) assets managed on in-use detail records?
Correct Answer
B. Equipment Liason Office (ELO)
Explanation
The Equipment Liason Office (ELO) is responsible for managing special purpose recoverable authorized maintenance (SPRAM) assets on in-use detail records. This means that the ELO is in charge of keeping track of these assets and ensuring that they are properly accounted for and maintained. The other options, Flight Service Center (FSC), Command Equipment Management Office (CEMO), and Defense Reutilization and Marketing Office (DRMO), do not have the specific responsibility of managing SPRAM assets on in-use detail records.
32.
Unless delegated, who is responsible for reviewing all requests for special purpose recoverable authorized maintenance (SPRAM) authorization submitted by SPRAM records?
Correct Answer
C. Mission Support Group (MSG)commander
Explanation
The Mission Support Group (MSG) commander is responsible for reviewing all requests for special purpose recoverable authorized maintenance (SPRAM) authorization submitted by SPRAM records. This indicates that the MSG commander has the authority and accountability to assess and approve or deny SPRAM authorization requests. The other options, such as the Logistics Readiness Squadron (LRS) commander and Maintenance Group (MXG) commanders, may have related responsibilities but do not have the specific responsibility for reviewing SPRAM authorization requests.
33.
Which precious Metals Indicator Code (PMIC) indicates that an item of supply contains a combination of two or more precious metals?
Correct Answer
B. C
Explanation
PMIC code C indicates that an item of supply contains a combination of two or more precious metals. This means that if an item is labeled with PMIC code C, it is made up of multiple precious metals, rather than just one.
34.
Which supply tracking document provides information on all document numbers processed during the day?
Correct Answer
B. D04, Daily Document Register
Explanation
The correct answer is D04, Daily Document Register. This document provides information on all document numbers processed during the day. It tracks the supply and keeps a record of all the documents that have been processed, allowing for easy tracking and monitoring of the supply chain. The other options listed are not specifically designed for tracking document numbers processed during the day.
35.
Which supply tracking document is produced daily and list all back-ordered parts with an urgency of need (UND) code of A?
Correct Answer
A. D18, Priority Monitor Report
Explanation
The D18, Priority Monitor Report is the correct answer because it is a supply tracking document that is produced daily and lists all back-ordered parts with an urgency of need (UND) code of A.
36.
Which supply tracking document provides a management product for monitoring issue and bench stock supply support?
Correct Answer
C. M-24, Organization Effectiveness Report
Explanation
The Organization Effectiveness Report (M-24) is a supply tracking document that provides a management product for monitoring issue and bench stock supply support. This report allows management to track and monitor the effectiveness of the organization's supply support, ensuring that issue and bench stock supplies are being properly monitored and managed.
37.
Who must authorize temporary storage of in-transit classified material in cargo security cages and alarmed rooms
Correct Answer
B. Host of instillation commander
Explanation
The host of installation commander is responsible for authorizing the temporary storage of in-transit classified material in cargo security cages and alarmed rooms. This individual has the authority and knowledge to ensure that the necessary security measures are in place to protect the classified material during transit.
38.
When the aircraft owner or user does not stay with an aircraft which has secret or confidential equipment installed, she/he must arrange for security checks to be accomplished every.
Correct Answer
C. 3 hours
Explanation
When the aircraft owner or user is not present with an aircraft that has secret or confidential equipment installed, security checks need to be conducted every 3 hours. This ensures that the equipment and the aircraft are kept secure and protected from any unauthorized access or tampering. Regular security checks help in maintaining the confidentiality and integrity of the confidential equipment and ensuring the safety of the aircraft.
39.
The final authority for reviewing a units list of supply assets requiring functional check, calibration, or operational flight programing?
Correct Answer
C. Logistics Readiness Squadron (LRS) Chief inspector.
Explanation
The Logistics Readiness Squadron (LRS) Chief inspector is the final authority for reviewing a unit's list of supply assets requiring functional check, calibration, or operational flight programming. They are responsible for ensuring that these assets are properly maintained and in working order. The Flight Commander/Chief, Maintenance Group Commander, and MX Operations Officer/Maintenance Superintendent may have other roles and responsibilities within the unit, but the LRS Chief inspector specifically oversees the review of supply assets.
40.
Who is responsible for determining the appropriate supply delivery priority for a parts request?
Correct Answer
A. Customer
Explanation
The customer is responsible for determining the appropriate supply delivery priority for a parts request. This means that the customer is the one who decides which parts are needed urgently and should be delivered first. They have the knowledge of their own needs and priorities, and therefore can determine the appropriate delivery priority for their parts request.
41.
Which Urgency justification codes (UJCs) are ued to show a supply request for bits and pieces to repair a line replaceable unit (LRU) or shop replaceable unit (SRU) spare?
Correct Answer
B. AR or BR
Explanation
The UJCs AR or BR are used to show a supply request for bits and pieces to repair a line replaceable unit (LRU) or shop replaceable unit (SRU) spare.
42.
Before a supply point can be established and located in a maintenance work area, who must Maintenance coordinate with?
Correct Answer
D. LRS material management element
Explanation
Maintenance must coordinate with the LRS material management element before a supply point can be established and located in a maintenance work area. The LRS material management element is responsible for managing and providing the necessary materials and supplies for maintenance operations. They have the knowledge and expertise to ensure that the right materials are available at the right time and place. By coordinating with them, maintenance can ensure that the supply point is properly established and stocked with the necessary items for efficient operations.
43.
Once established, how often must a supply point accounts be reconciled by the workcenter supply point monitor?
Correct Answer
B. Semiannually
Explanation
The supply point accounts need to be reconciled by the workcenter supply point monitor twice a year, which is known as semiannually. This allows for a regular review and verification of the supply point accounts to ensure accuracy and identify any discrepancies or errors. By conducting this reconciliation every six months, the workcenter supply point monitor can maintain an up-to-date and reliable record of the supply point's inventory and transactions.
44.
When a mision capable (MICAP) part issues and is placed in the tail number bin (TNB), supply personnel notify the
Correct Answer
C. Maintenance Operations Center (MOC)
Explanation
When a mission capable (MICAP) part issues and is placed in the tail number bin (TNB), supply personnel notify the Maintenance Operations Center (MOC). The MOC is responsible for coordinating and managing all maintenance operations for the aircraft. They are the central hub for communication between supply personnel, aircraft section chiefs, and the aircraft maintenance unit (AMU) plans, scheduling, and documentation (PS&D) dedicated team. The MOC will ensure that the necessary actions are taken to address the MICAP part and coordinate with the relevant parties to ensure timely repair or replacement.
45.
When the goal is to get a refund or a new item in exchange, what type of deficiency report is submitted?
Correct Answer
B. Supply Deficiency Report
Explanation
When the goal is to get a refund or a new item in exchange, a Supply Deficiency Report is submitted. This type of report is used to document and report issues related to the supply of a product, such as missing or damaged items, incorrect quantities, or other supply-related deficiencies. By submitting a Supply Deficiency Report, the customer can notify the relevant authorities or department about the issue and request a refund or a replacement item.
46.
Who has the responsibility for overall deficiency report program management for the submitting organization?
Correct Answer
D. Originating point
Explanation
The originating point has the responsibility for overall deficiency report program management for the submitting organization. This means that they are in charge of overseeing and managing the entire program, including the identification and reporting of deficiencies. They are responsible for ensuring that the program runs smoothly and effectively, and for taking any necessary actions to address and resolve deficiencies.
47.
Who acts as the deficiency Report focal point between the support point and submitting organization?
Correct Answer
B. Action Point
Explanation
The correct answer is "Action Point". The Action Point acts as the deficiency report focal point between the support point and the submitting organization. This means that the Action Point is responsible for coordinating and communicating the deficiency report information between these two parties. They ensure that the support point receives the necessary information and that the submitting organization's concerns are addressed appropriately.
48.
Once a category I deficiency is discovered, a deficiency Report (DR) must be submitted to the screening point within
Correct Answer
C. 24 hours
Explanation
A category I deficiency refers to a serious issue or problem that needs immediate attention. In order to address this deficiency, a deficiency report (DR) must be submitted to the screening point. The correct answer is 24 hours, which means that the DR must be submitted within 24 hours of discovering the deficiency. This ensures that the issue is promptly reported and can be addressed in a timely manner to prevent any further complications or risks.
49.
Which is not normally a Maintenance Group (MXG) technical order distribution office (TODO) duty?
Correct Answer
A. Establish technical order distribution account (TODA)sub-accounts as required.
Explanation
The MXG technical order distribution office (TODO) is responsible for various duties related to the distribution and availability of technical orders (TO). These duties include assisting units in establishing additional TODO accounts, advising the MXG/CC on TO availability, and resolving TO availability problems. However, the establishment of technical order distribution account (TODA) sub-accounts is not a typical duty of the MXG TODO.
50.
What Maintenance Operations Flight section is responsible for periodically reviewing maintenance information systems (MIS) products to ensure proper documentation and management of time compliance technical order (TCTOs) by owning and managing agencies?
Correct Answer
D. Plans, Scheduling, and Documentation
Explanation
The Plans, Scheduling, and Documentation section is responsible for periodically reviewing maintenance information systems (MIS) products to ensure proper documentation and management of time compliance technical order (TCTOs) by owning and managing agencies. This section is in charge of creating and maintaining schedules for maintenance operations, as well as ensuring that all necessary documentation is complete and accurate. They play a crucial role in coordinating and organizing maintenance activities within the organization.