This quiz assesses knowledge on the structure and identification of Technical Order (TO) numbers in a military context, focusing on general categories, basic missions, major systems, and job guides. It is designed to enhance understanding of TO number sectionalization and indexing.
True
False
Rate this question:
Functional action
Immediate action
Specialized action
Urgent action
Preliminary action
Routine action
Rate this question:
Organizational and field mx activities
Off base mx activites
Depot-level mx activities
Other station mx activites
Rate this question:
Interim
F.A.S.T.
Hand writen
Rate this question:
True
False
Rate this question:
Equipment manufacturers/the to system by your to account manager
Secretary of af/ the to system by you to account manager
Maintainers/ through your commander
Equipment manufacturers/ Through your commander
Rate this question:
These manuals pertain to parts that my not be on other a/c
These manuals pertain to equipment other that a/c
These manuals pertain to equipment that can be taken off the jet
These manuals pertain to equipment that other than what you are working on
Rate this question:
0-1-02
0-2-01
0-0-00
00-00-1
Rate this question:
Damage to the a/c
Death or injury
Hazard through prolonged usage
A/C blowing up!!!
Rate this question:
Organizational and field mx activities
Depot-level mx activities
Off base mx activites
Other station mx activites
Rate this question:
True
False
Rate this question:
Major system or basic mission
Function of A/C
Section of a sectionalized TO
General category
Rate this question:
TO indexes
Alphabetical listings
Cross-reference tables
LOAPs
Rate this question:
10 to 20 days
During the next IRAN or overhaul
30 to 180 days
20 to 180 days
20 to 30 days
Rate this question:
A supplemental manual
The sequence number of specific TO data
Section of a sectionalized TO
TO indexes
Rate this question:
0-2-1
00-2-0
0-4-2
0-2-4
00-4-2
Rate this question:
True
False
Rate this question:
Operational
Phase
Open
Periodic
Rate this question:
When a TCTO needs to be complied with imediatly
When an A/C cannot launch with out it
When the mod must be done my a contractor or specified af activity
When the commander feels a TCTO takes priority
Rate this question:
10 to 20 days
During the next IRAN or overhaul
30 to 180 days
20 to 180 days
20 to 30 days
Rate this question:
0-1-1-1
0-1-1-3
0-2-1
00-2-0
00-20-1
Rate this question:
LOAP
TO Index
JG
Category TO
Alphabetical listing
Cross-reference tables
Rate this question:
Urgent
F.A.S.T.
Hand writen
Routine
Interim
Rate this question:
General category,basic mission, and major system
A/C model, modified mission, production series
Section of a sectionalized TO, and function of the TO
The type of TO
Rate this question:
0-1-1-1
0-1-1-2
0-1-1-3
0-1-11-1
0-1-33-1
Aircraft
Missiles
C-E
Special weapons
Other equipment
JG
Work package
Supplemental
Cots
Rate this question:
Quiz Review Timeline (Updated): Mar 19, 2023 +
Our quizzes are rigorously reviewed, monitored and continuously updated by our expert board to maintain accuracy, relevance, and timeliness.
Wait!
Here's an interesting quiz for you.