The Ultimate Professional Practice Quiz

Reviewed by Editorial Team
The ProProfs editorial team is comprised of experienced subject matter experts. They've collectively created over 10,000 quizzes and lessons, serving over 100 million users. Our team includes in-house content moderators and subject matter experts, as well as a global network of rigorously trained contributors. All adhere to our comprehensive editorial guidelines, ensuring the delivery of high-quality content.
Learn about Our Editorial Process
| By Mladezignconcept
M
Mladezignconcept
Community Contributor
Quizzes Created: 1 | Total Attempts: 575
| Attempts: 575 | Questions: 10
Please wait...
Question 1 / 10
0 %
0/100
Score 0/100
1. 4.The Board Exam result are mandated to be release ______ days after the Exam with the project.

Explanation

The correct answer is a.30 days. The sentence states that the Board Exam results are mandated to be released a certain number of days after the exam with the project. The only option that matches this requirement is 30 days, as it is the only choice that represents the specified time frame.

Submit
Please wait...
About This Quiz
The Ultimate Professional Practice Quiz - Quiz

This quiz deals with the subject of professional practice in one’s occupation – which is defined as the actual act of using knowledge and competence in order to... see morefulfil the activities that are require of you within your profession.
see less

2. 6.How much is the MBF when Mr. Cruz's House cost Php 20M?

Explanation

The MBF (Minimum Building Fund) is a percentage of the total cost of the house that needs to be set aside for maintenance and repairs. In this case, the MBF is 10% of Php 20M, which is Php 2.0M. Therefore, the correct answer is b.Php 2.0M.

Submit
3. 1.The __________ is the submission of a dispute to an impartial board made up of persons acquainted with the project.

Explanation

Arbitration is the correct answer because it refers to the submission of a dispute to an impartial board. This board is composed of individuals who have knowledge and understanding of the project. Arbitration is a method of resolving disputes outside of the court system, where the board listens to both sides and makes a binding decision. It is often used as an alternative to litigation, providing a more efficient and cost-effective way to resolve conflicts.

Submit
4. 3.Temporary Facilities are paid for by the __________.

Explanation

Temporary facilities, such as portable toilets or temporary offices, are typically required on construction sites. These facilities are necessary for the smooth functioning of the project and are usually arranged and paid for by the contractor. The contractor is responsible for managing all aspects of the construction project, including coordinating the necessary resources and ensuring that the temporary facilities are in place for the duration of the project. Therefore, it makes sense that the contractor would be the one responsible for paying for these temporary facilities.

Submit
5. 10. Under PD 1185, automatically sprinkler system shall provided in buildings with heights over:

Explanation

Under PD 1185, buildings with heights over 15.0 meters are required to have an automatically sprinkler system. This regulation ensures that taller buildings have adequate fire protection measures in place to minimize the risk of fire incidents and protect the occupants and property. The sprinkler system is designed to automatically detect and suppress fires, providing early intervention and reducing the potential for fire spread and damage.

Submit
6. 9.Under PD 1096, habitable rooms provided with artificial ventilation of more than one-storey shall have a minimum ceiling height of the first storey at:

Explanation

Under PD 1096, habitable rooms provided with artificial ventilation of more than one-storey should have a minimum ceiling height of 2.70 meters.

Submit
7. 2.The ___________ automatically becomes the Architect himself in the construction site.

Explanation

The Architect's Representative automatically becomes the Architect himself in the construction site. This means that the Architect's Representative has the authority to make decisions and oversee the construction process on behalf of the Architect. They act as a liaison between the Architect and the construction team, ensuring that the project is executed according to the Architect's plans and specifications. The Architect's Representative is responsible for quality control, resolving any issues that may arise, and ensuring that the project meets the Architect's vision and standards.

Submit
8. 8.How much is the interest cost when the unpaid MBF is Php 1.0M?

Explanation

The interest cost when the unpaid MBF is Php 1.0M is Php 20,000. This can be calculated by multiplying the unpaid MBF (Php 1.0M) by the interest rate. If the interest rate is 2%, then the calculation would be 1,000,000 x 0.02 = 20,000. Therefore, the correct answer is c.Php 20,000.

Submit
9. 5.How much is the MBF (Minimun Basic Fee) when the Nuclear Facility cost Php 200 M?

Explanation

The MBF (Minimum Basic Fee) is calculated based on a certain percentage of the total cost of the Nuclear Facility. In this case, the MBF is 8% of the total cost. Therefore, to find the MBF, we multiply Php 200M by 8%, which gives us Php 16M. Therefore, the correct answer is b.Php 16M.

Submit
10. 7.How much is the MBF when Mr Cruz's house 2nd Unit cost Php 10M?

Explanation

The MBF (Minimum Borrowing Factor) is a percentage that represents the minimum amount of money that needs to be borrowed in order to purchase a property. In this case, the MBF is 6% of the cost of the house. Since the cost of Mr. Cruz's house 2nd Unit is Php 10M, the MBF would be Php 0.6M (6% of Php 10M). Therefore, the correct answer is c.Php 0.6M.

Submit
View My Results

Quiz Review Timeline (Updated): Sep 5, 2024 +

Our quizzes are rigorously reviewed, monitored and continuously updated by our expert board to maintain accuracy, relevance, and timeliness.

  • Current Version
  • Sep 05, 2024
    Quiz Edited by
    ProProfs Editorial Team
  • Feb 07, 2011
    Quiz Created by
    Mladezignconcept
Cancel
  • All
    All (10)
  • Unanswered
    Unanswered ()
  • Answered
    Answered ()
4.The Board Exam result are mandated to be release ______ days after...
6.How much is the MBF when Mr. Cruz's House cost Php 20M?
1.The __________ is the submission of a dispute to an impartial board...
3.Temporary Facilities are paid for by the __________.
10. Under PD 1185, automatically sprinkler system shall provided in...
9.Under PD 1096, habitable rooms provided with artificial ventilation...
2.The ___________ automatically becomes the Architect himself in the...
8.How much is the interest cost when the unpaid MBF is Php 1.0M?
5.How much is the MBF (Minimun Basic Fee) when the Nuclear Facility...
7.How much is the MBF when Mr Cruz's house 2nd Unit cost Php 10M?
Alert!

Advertisement