Interesting Quiz On Professional Practice

Approved & Edited by ProProfs Editorial Team
The editorial team at ProProfs Quizzes consists of a select group of subject experts, trivia writers, and quiz masters who have authored over 10,000 quizzes taken by more than 100 million users. This team includes our in-house seasoned quiz moderators and subject matter experts. Our editorial experts, spread across the world, are rigorously trained using our comprehensive guidelines to ensure that you receive the highest quality quizzes.
Learn about Our Editorial Process
| By Glenford23
G
Glenford23
Community Contributor
Quizzes Created: 9 | Total Attempts: 30,641
Questions: 37 | Attempts: 844

SettingsSettingsSettings
Interesting Quiz On Professional Practice - Quiz

The term “professional practice” refers to the use of one’s knowledge in a particular profession, including professional activities related to their given field and the actual performance of the duties they are required to fulfil.


Questions and Answers
  • 1. 

    The 3-D wheel of a building project consists of all but one of these

    • A.

      Decision to build by the owner

    • B.

      Design concept by the architect

    • C.

      Provision of materials by suppliers

    • D.

      Delivery system by the contractor

    Correct Answer
    C. Provision of materials by suppliers
    Explanation
    The 3-D wheel of a building project consists of the decision to build by the owner, the design concept by the architect, and the delivery system by the contractor. The provision of materials by suppliers is not included in the 3-D wheel.

    Rate this question:

  • 2. 

    UAP document 200 is also known as

    • A.

      Technical writing

    • B.

      Contractor - Owner Agreement

    • C.

      Code of Ethical Conduct

    • D.

      Design Build Services

    Correct Answer
    C. Code of Ethical Conduct
    Explanation
    UAP document 200 is commonly referred to as the "Code of Ethical Conduct." This document outlines the ethical standards and principles that professionals in the field of architecture must adhere to. It provides guidelines for professional behavior, integrity, and responsibility in order to maintain the highest standards of ethical conduct within the industry.

    Rate this question:

  • 3. 

    The first architectural association organized in the Philippines

    • A.

      Philippine Institute of Architects

    • B.

      Philippine Architects Society

    • C.

      United Architects of the Philippines

    • D.

      Philippine Architects Association

    Correct Answer
    B. pHilippine Architects Society
    Explanation
    The correct answer is the Philippine Architects Society. The Philippine Architects Society was the first architectural association organized in the Philippines. It is a professional organization composed of architects in the country. It aims to promote and uphold the standards of the architectural profession in the Philippines and to foster camaraderie and cooperation among its members.

    Rate this question:

  • 4. 

    ___________ services is the range of all services offered by the environmental planner from data base gathering to environmental impact statements up to the formulation of the Master Development Plan

    • A.

      Comprehensive Planning

    • B.

      Environmental Analysis

    • C.

      Urban Planning

    • D.

      Master Planning

    Correct Answer
    A. Comprehensive Planning
    Explanation
    Comprehensive planning refers to the range of services offered by the environmental planner, which includes tasks such as data gathering, preparing environmental impact statements, and formulating the Master Development Plan. This involves a holistic approach to planning that takes into account various factors and considerations to ensure the effective and sustainable development of an area.

    Rate this question:

  • 5. 

    Manner of payment for construction management services whereby the owner pays a fixed fee. The fee will be unaffected by variations between the estimate and the bids or by change orders during the construction phase unless the owner initiates an increase in scope.

    • A.

      Fixed Price Incentive

    • B.

      Cost Plus Fixed Fee

    • C.

      Construction Manager Fixed Fee

    • D.

      Firm Fixed Fee

    Correct Answer
    D. Firm Fixed Fee
    Explanation
    A firm fixed fee is a manner of payment for construction management services where the owner pays a fixed fee. This fee remains unchanged regardless of any variations between the estimate and the bids or any change orders during the construction phase, unless the owner specifically requests an increase in scope. This means that the construction manager is responsible for managing the project within the agreed-upon fee, providing an incentive for them to control costs and minimize any potential overruns.

    Rate this question:

  • 6. 

    Basic rate for physical planning for building sites for the first 50 hectares or less

    • A.

      P 10, 000 per hectare

    • B.

      P 15, 000 per hectare

    • C.

      P 20, 000 per hectare

    • D.

      P 5, 000 per hectare

    Correct Answer
    D. P 5, 000 per hectare
    Explanation
    The correct answer is P 5,000 per hectare. This means that the basic rate for physical planning for building sites for the first 50 hectares or less is P 5,000 per hectare.

    Rate this question:

  • 7. 

    Architectural Programming is one of the Architect' s services that falls under:

    • A.

      Specialized Allied Services

    • B.

      Pre-design Services

    • C.

      Design Services

    • D.

      Design-Build Services

    Correct Answer
    B. Pre-design Services
    Explanation
    Architectural Programming is a service provided by architects that involves gathering and analyzing information about a project's requirements, goals, and constraints. This information is then used to develop a comprehensive program that outlines the project's functional and spatial needs. Pre-design services, which occur before the actual design phase, encompass activities such as site analysis, feasibility studies, and programming. Therefore, Architectural Programming is considered a part of pre-design services rather than specialized allied services, design services, or design-build services.

    Rate this question:

  • 8. 

    One of the methods of compensating the services of the architect, which is applicable only to non-creative work such as accounting, supervision and data gathering.

    • A.

      Professional fee plus expenses

    • B.

      Per diem plus reimbursable expenses

    • C.

      Multiple of direct personnel expenses

    • D.

      Percentage of construction cost

    Correct Answer
    C. Multiple of direct personnel expenses
    Explanation
    This method of compensating the services of the architect is applicable only to non-creative work such as accounting, supervision, and data gathering. It involves calculating the fee based on a multiple of the direct personnel expenses incurred by the architect. This means that the architect's fee will be a certain percentage of the total personnel expenses related to the project, which can include salaries, benefits, and other costs associated with the architect's team. This method is commonly used when the architect's role is mainly administrative or managerial rather than creative.

    Rate this question:

  • 9. 

    In GNTT charts, a diamond is used for denoting______. This is an activity that does not consume time.

    • A.

      Dummy

    • B.

      Milestone

    • C.

      Event

    • D.

      Node

    Correct Answer
    B. Milestone
    Explanation
    In GNTT charts, a diamond is used for denoting a milestone. A milestone represents a significant event or achievement in a project, marking a specific point in time. Unlike activities, milestones do not consume time and are used to track progress and make key decisions. They serve as important indicators of project progress and help in monitoring and controlling project timelines.

    Rate this question:

  • 10. 

    The Professional Regular Commission' s powers include all except which of these:

    • A.

      Prescribe academic requisites

    • B.

      Supervise practicing foreigners

    • C.

      Act on violation of rules

    • D.

      Regulate use of business names

    Correct Answer
    D. Regulate use of business names
    Explanation
    The Professional Regular Commission has the power to prescribe academic requisites, supervise practicing foreigners, and act on violations of rules. However, it does not have the power to regulate the use of business names. This means that the commission does not have the authority to control or oversee the naming of businesses.

    Rate this question:

  • 11. 

    Any person who shall entice or coerce an architect to perform/undertake any service under the general practice of architecture shall upon conviction to sentenced to a fine of not less than _____or suffer imprisonment for a period of not exceeding _____ year(s).

    • A.

      250,000/2

    • B.

      200,000/5

    • C.

      200,000/2

    • D.

      500,000/1

    Correct Answer
    C. 200,000/2
    Explanation
    The correct answer is 200,000/2. This means that any person who entices or coerces an architect to perform architectural services can be convicted and sentenced to a fine of 200,000 pesos or imprisonment for a maximum of 2 years.

    Rate this question:

  • 12. 

    A firm, company, corporation, or association may be registered or licensed as such for practice. Registered and licensed architects shall composed of at least ____ % of the owners, shareholders, members, incorporators, directors, executives, offices.

    • A.

      50

    • B.

      60

    • C.

      75

    • D.

      80

    Correct Answer
    C. 75
    Explanation
    According to the given information, registered and licensed architects must be composed of at least 75% of the owners, shareholders, members, incorporators, directors, executives, and officers in a firm, company, corporation, or association.

    Rate this question:

  • 13. 

    Architectural Programming is one of the Architect' s services that falls under:

    • A.

      Specialized Allied Services

    • B.

      Pre-design Services

    • C.

      Design Services

    • D.

      Design-Build Services

    Correct Answer
    B. Pre-design Services
    Explanation
    Architectural Programming is a service provided by architects that involves gathering and analyzing information about a project's requirements and objectives. This information is used to develop a comprehensive program that outlines the project's functional and spatial needs. Pre-design services encompass all the activities that take place before the actual design process begins, such as site analysis, feasibility studies, and programming. Therefore, Architectural Programming falls under the category of Pre-design Services.

    Rate this question:

  • 14. 

    Economic Feasibility Studies is one of the Architect' s services that falls under:

    • A.

      Specialized Allied Services

    • B.

      Pre-design Services

    • C.

      Design Services

    • D.

      Design-Build Services

    Correct Answer
    B. Pre-design Services
    Explanation
    Pre-design services refer to the initial phase of the architectural process, where the architect gathers all the necessary information and conducts feasibility studies to determine the viability of a project. Economic feasibility studies, as mentioned in the question, are a crucial part of this phase as they assess the financial aspects of the project. Therefore, economic feasibility studies fall under pre-design services.

    Rate this question:

  • 15. 

    Project Financing is one of the Architect' s services that falls under:

    • A.

      Specialized Allied Services

    • B.

      Pre-design Services

    • C.

      Design Services

    • D.

      Design-Build Services

    Correct Answer
    B. Pre-design Services
    Explanation
    Project Financing is not directly related to the actual design of a project. It involves securing the necessary funds and financial resources for a project to be undertaken. Pre-design services, on the other hand, are activities that occur before the actual design process begins. These services typically include site analysis, feasibility studies, programming, and cost estimation. Therefore, it is logical to categorize Project Financing under Pre-design Services rather than under any of the other options provided.

    Rate this question:

  • 16. 

    Site Selection and Analysis is one of the Architect' s services that falls under:

    • A.

      Specialized Allied Services

    • B.

      Pre-design Services

    • C.

      Design Services

    • D.

      Design-Build Services

    Correct Answer
    B. Pre-design Services
    Explanation
    Site Selection and Analysis is a service provided by architects before the actual design process begins. It involves evaluating potential sites for a project and analyzing factors such as location, accessibility, zoning regulations, and environmental impact. This information is crucial in the early stages of a project as it helps inform the design process and ensures that the chosen site is suitable for the intended purpose. Therefore, Site Selection and Analysis is considered a part of Pre-design Services, which involve activities that take place before the actual design work starts.

    Rate this question:

  • 17. 

    Space/Management Studies is one of the Architect' s services that falls under:

    • A.

      Specialized Allied Services

    • B.

      Pre-design Services

    • C.

      Design Services

    • D.

      Design-Build Services

    Correct Answer
    B. Pre-design Services
    Explanation
    The correct answer is Pre-design Services. This is because Space/Management Studies, which involves analyzing and planning the use of space within a building, is typically conducted before the actual design phase of a project. Pre-design services encompass activities that occur prior to the creation of detailed design plans, such as site analysis, feasibility studies, programming, and conceptual design development. Therefore, Space/Management Studies would be considered a part of the pre-design services offered by an architect.

    Rate this question:

  • 18. 

    Promotional Services is one of the Architect' s services that falls under:

    • A.

      Specialized Allied Services

    • B.

      Pre-design Services

    • C.

      Design Services

    • D.

      Design-Build Services

    Correct Answer
    B. Pre-design Services
    Explanation
    Promotional services, as the name suggests, are services that are provided before the actual design process begins. These services are aimed at promoting the architect's work and attracting potential clients. Therefore, it makes sense for promotional services to fall under pre-design services, as they are activities that occur before the design phase of a project.

    Rate this question:

  • 19. 

    Interior Design is one of the Architect' s services that falls under:

    • A.

      Specialized Allied Services

    • B.

      Pre-design Services

    • C.

      Design Services

    • D.

      Design-Build Services

    Correct Answer
    A. Specialized Allied Services
    Explanation
    Interior Design is considered as one of the specialized allied services provided by an architect. Specialized allied services refer to the additional services that an architect offers alongside their main design services. These services are related to the design and construction industry but are not part of the core design process. Interior Design involves the planning, designing, and coordination of the interior spaces of a building, including the selection of materials, colors, furniture, and fixtures. As it is a specialized service that complements the overall architectural design, it falls under the category of specialized allied services.

    Rate this question:

  • 20. 

    Acoustic, Communication and Electronic Engineering is one of the Architect' s services that falls under:

    • A.

      Specialized Allied Services

    • B.

      Pre-design Services

    • C.

      Design Services

    • D.

      Design-Build Services

    Correct Answer
    A. Specialized Allied Services
    Explanation
    Acoustic, Communication and Electronic Engineering is categorized as one of the Architect's services under Specialized Allied Services. This means that the architect offers specialized expertise in these areas to support the overall design and construction process. These services are likely to involve the design and implementation of sound systems, communication networks, and electronic systems within the architectural project. By offering these specialized services, the architect can ensure that the building's acoustic, communication, and electronic needs are met effectively.

    Rate this question:

  • 21. 

    Landscape Design is one of the Architect' s services that falls under:

    • A.

      Specialized Allied Services

    • B.

      Pre-design Services

    • C.

      Design Services

    • D.

      Design-Build Services

    Correct Answer
    A. Specialized Allied Services
    Explanation
    Landscape design is a specialized service provided by architects that focuses on the planning and design of outdoor spaces. It involves creating functional and aesthetically pleasing layouts for gardens, parks, and other outdoor areas. Specialized allied services refer to services that are related to the main architectural services but are not part of the core design process. Since landscape design is a separate service that architects offer in addition to their main design services, it falls under specialized allied services.

    Rate this question:

  • 22. 

    Physical Planning is one of the Architect' s services that falls under:

    • A.

      Specialized Allied Services

    • B.

      Pre-design Services

    • C.

      Design Services

    • D.

      Design-Build Services

    Correct Answer
    A. Specialized Allied Services
    Explanation
    Physical planning is the process of determining the best use of land and resources in order to achieve specific goals and objectives. It involves analyzing the site, considering various factors such as zoning regulations, environmental impact, and community needs, and developing a comprehensive plan for the physical development of the area. This service is considered as part of specialized allied services because it requires specific expertise and knowledge in urban planning and land use. Architects who offer physical planning services work closely with clients to ensure that their development projects align with the overall vision and goals of the community.

    Rate this question:

  • 23. 

    Comprehensive Planning is one of the Architect' s services that falls under:

    • A.

      Specialized Allied Services

    • B.

      Pre-design Services

    • C.

      Design Services

    • D.

      Design-Build Services

    Correct Answer
    A. Specialized Allied Services
    Explanation
    Comprehensive Planning is a service provided by architects that involves creating a detailed and thorough plan for a project. This plan includes aspects such as site analysis, feasibility studies, programming, and master planning. Specialized Allied Services refer to services that are related to but separate from the core design and construction process. Since Comprehensive Planning is a specialized service that is not directly involved in the actual design or construction, it falls under the category of Specialized Allied Services.

    Rate this question:

  • 24. 

    A study to determine the viability of a project such as its cost of development versus its potential return to the Owner. A detailed cost-benefit analysis can guide the client and the architect in selecting a more viable alternative plan.

    • A.

      Site Selection and Analysis

    • B.

      Space/Management Studies

    • C.

      Economic Feasibility Studies

    • D.

      Project Financing

    Correct Answer
    C. Economic Feasibility Studies
    Explanation
    Economic feasibility studies are important in determining the viability of a project by evaluating its cost of development compared to its potential return. These studies provide a detailed cost-benefit analysis that helps the client and the architect in selecting a more viable alternative plan. By analyzing the economic feasibility, the stakeholders can make informed decisions about whether to proceed with the project or explore other options. It helps in assessing the financial implications and potential profitability of the project, ensuring that resources are allocated efficiently and effectively.

    Rate this question:

  • 25. 

    Architects assist in the determination of requirements of lending agencies, income-expense relationship and relative demand for different building types in actual financing negotiations.

    • A.

      Site Selection and Analysis

    • B.

      Space/Management Studies

    • C.

      Economic Feasibility Studies

    • D.

      Project Financing

    Correct Answer
    D. Project Financing
    Explanation
    Architects play a crucial role in project financing by assisting in the determination of requirements of lending agencies, income-expense relationship, and relative demand for different building types. They provide valuable insights and analysis during actual financing negotiations, helping to ensure that the project is financially feasible and meets the requirements of the lending agencies. By considering factors such as site selection, space management, and economic feasibility, architects contribute to the successful financing of the project.

    Rate this question:

  • 26. 

    Investigating, identifying and documenting the needs of the client for use in the design of the project.

    • A.

      Site Selection and Analysis

    • B.

      Architectural Programming

    • C.

      Economic Feasibility Studies

    • D.

      Project Financing

    Correct Answer
    B. Architectural Programming
    Explanation
    Architectural programming involves investigating, identifying, and documenting the needs of the client for use in the design of the project. This process helps the architect understand the client's goals, requirements, and preferences, and translates them into a design brief. By conducting interviews, surveys, and research, the architect gathers information about the project's functional, aesthetic, and technical requirements. This information is then used to develop a design concept that meets the client's needs and expectations. Therefore, architectural programming is the most appropriate answer as it specifically addresses the process of understanding and documenting the client's needs for the design project.

    Rate this question:

  • 27. 

    Analysis of the space requirements of the project based on organizational structure and functional set-up. One method is to use human behavior and transactional analysis to pinpoint linkages and interactions of spaces. The services cover space use and space character analysis, work station and space module design and a space program to serve as basis for architectural design.

    • A.

      Space/Management Studies

    • B.

      Architectural Programming

    • C.

      Economic Feasibility Studies

    • D.

      Project Financing

    Correct Answer
    A. Space/Management Studies
    Explanation
    The given answer, Space/Management Studies, is the most appropriate choice based on the information provided. The passage mentions analyzing space requirements, human behavior, and transactional analysis to understand the linkages and interactions of spaces. This indicates that the focus of the project is on studying and managing space utilization and organization within an organization. The other options listed, such as Architectural Programming, Economic Feasibility Studies, and Project Financing, do not directly relate to the specific aspects mentioned in the passage.

    Rate this question:

  • 28. 

    A detailed analysis of the site to develop its potential through the proper utilization of land.

    • A.

      Site Selection and Analysis

    • B.

      Space/Management Studies

    • C.

      Site Utilization and Land-Use Studies

    • D.

      Project Financing

    Correct Answer
    C. Site Utilization and Land-Use Studies
    Explanation
    Site Utilization and Land-Use Studies involve conducting a detailed analysis of a site to determine its potential and how it can be best utilized. This includes evaluating factors such as the size and shape of the land, its location, accessibility, and any existing infrastructure. By conducting these studies, one can identify the most efficient and effective ways to develop the site, taking into consideration factors such as zoning regulations, environmental impact, and the needs of the project. This helps in maximizing the use of the land and ensuring that it is utilized in a sustainable and economically viable manner.

    Rate this question:

  • 29. 

    In some cases, the project would require promotional activities in order to generate financial support and acceptance from governing agencies or from the general public. The Architect, with his own staff, can accomplish many of these activities including preparation of promotional designs, drawings, brochures and the like. As the agent of the Owner, the Architect can produce and coordinate the additional activities necessary to complete the services.

    • A.

      Promotional Services

    • B.

      Space/Management Studies

    • C.

      Site Utilization and Land-Use Studies

    • D.

      Project Financing

    Correct Answer
    A. Promotional Services
    Explanation
    The correct answer is Promotional Services. The passage states that the architect can accomplish promotional activities such as preparation of promotional designs, drawings, brochures, and more. This implies that the architect can provide promotional services to generate financial support and acceptance for the project.

    Rate this question:

  • 30. 

    Full-Time Supervision is one of the Architect' s services that falls under:

    • A.

      Specialized Allied Services

    • B.

      Pre-design Services

    • C.

      Design Services

    • D.

      Construction Services

    Correct Answer
    D. Construction Services
    Explanation
    Full-Time Supervision is a service provided by an Architect during the construction phase of a project. This service involves the Architect being present on-site to oversee the construction process, ensuring that it is carried out according to the design plans and specifications. This falls under Construction Services because it directly relates to the actual construction of the project and ensures that it is executed correctly and in accordance with the design intent.

    Rate this question:

  • 31. 

    Construction Management is one of the Architect' s services that falls under:

    • A.

      Specialized Allied Services

    • B.

      Pre-design Services

    • C.

      Design Services

    • D.

      Construction Services

    Correct Answer
    D. Construction Services
    Explanation
    Construction Management is a service provided by architects that falls under Construction Services. This service involves overseeing and managing the construction process, ensuring that it is executed according to the design plans and specifications. Architects who offer construction management services act as a liaison between the client and the construction team, coordinating and supervising the various activities on the construction site. They are responsible for ensuring that the project is completed on time, within budget, and to the client's satisfaction.

    Rate this question:

  • 32. 

    Building Administration is one of the Architect' s services that falls under:

    • A.

      Specialized Allied Services

    • B.

      Pre-design Services

    • C.

      Post-Construction Services

    • D.

      Construction Services

    Correct Answer
    C. Post-Construction Services
    Explanation
    Building Administration is a service provided by an architect after the construction of a building is completed. This service involves managing and overseeing the operations and maintenance of the building. It includes tasks such as ensuring the building is in compliance with regulations, coordinating repairs and maintenance, and addressing any issues that may arise. Therefore, Building Administration falls under Post-Construction Services.

    Rate this question:

  • 33. 

    Building and Equipment Maintenance is one of the Architect' s services that falls under:

    • A.

      Post-Construction Services

    • B.

      Pre-design Services

    • C.

      Design Services

    • D.

      Construction Services

    Correct Answer
    A. Post-Construction Services
    Explanation
    Building and Equipment Maintenance is a service that is typically required after the construction of a building is complete. It involves the regular upkeep and repair of the building and its equipment to ensure that it remains in good condition and functions properly. Therefore, it falls under the category of Post-Construction Services, which are the services provided after the construction phase is finished.

    Rate this question:

  • 34. 

    Part-Time Supervision is one of the Architect' s services that falls under:

    • A.

      Post-Construction Services

    • B.

      Pre-design Services

    • C.

      Design Services

    • D.

      Construction Services

    Correct Answer
    C. Design Services
    Explanation
    Part-Time Supervision is a service provided by an architect that involves overseeing the construction process on a part-time basis. This service is typically offered during the design phase of a project to ensure that the construction is being carried out according to the plans and specifications. Therefore, it falls under Design Services, as it is directly related to the design and implementation of the project.

    Rate this question:

  • 35. 

    Preliminary Design is one of the Architect' s services that falls under:

    • A.

      Post-Construction Services

    • B.

      Pre-design Services

    • C.

      Design Services

    • D.

      Construction Services

    Correct Answer
    C. Design Services
    Explanation
    Preliminary Design is a service provided by an architect that involves the initial planning and conceptualization of a project. This stage focuses on gathering information, analyzing requirements, and creating a preliminary design proposal. Since it is part of the initial design process, it falls under the category of Design Services.

    Rate this question:

  • 36. 

    Specifications and Other Contract Documents is one of the Architect' s services that falls under:

    • A.

      Post-Construction Services

    • B.

      Pre-design Services

    • C.

      Design Services

    • D.

      Construction Services

    Correct Answer
    C. Design Services
    Explanation
    Specifications and Other Contract Documents are typically prepared by the architect during the design phase of a project. These documents outline the technical requirements, materials, and construction methods for the project. Therefore, it falls under the category of Design Services, as it is a crucial part of the architect's role in developing the design and ensuring that it is accurately communicated to the construction team.

    Rate this question:

  • 37. 

    Work Drawings is one of the Architect' s services that falls under:

    • A.

      Post-Construction Services

    • B.

      Pre-design Services

    • C.

      Design Services

    • D.

      Construction Services

    Correct Answer
    C. Design Services
    Explanation
    Work Drawings are an integral part of the design process in architecture. They are detailed technical drawings that provide instructions for the construction of a building. These drawings include plans, elevations, sections, and details that communicate the design intent to contractors and builders. Therefore, Work Drawings fall under Design Services as they are essential for translating the design concept into a tangible structure during the construction phase.

    Rate this question:

Quiz Review Timeline +

Our quizzes are rigorously reviewed, monitored and continuously updated by our expert board to maintain accuracy, relevance, and timeliness.

  • Current Version
  • Aug 14, 2024
    Quiz Edited by
    ProProfs Editorial Team
  • Dec 27, 2010
    Quiz Created by
    Glenford23
Back to Top Back to top
Advertisement
×

Wait!
Here's an interesting quiz for you.

We have other quizzes matching your interest.