More sample NCIDQ Questions. Good Luck!
Determining the list of the project's sub-contractors
Establishing the architectural parameters of the project
Administering a P.O.E. study
Formatting a design presentation
Design programming
Creating a ceiling plenum space
The purchase/shipment/installation process
Wire management
Formulate design presentation patterns
Establish space planning relationship priorities
Create pairing patterns for power and data distribution
Establish fresh air and view requirements for habitable rooms
A strictly controlled process for creating floor plans
A technique that involves both the two- and three-dimensional aspects of design
A trial and error technique used at the beginning of the space planning process
A technique that does not employ the use of scale
Base plan, tracing paper, a pencil, templates and triangles
Base plan, tracing paper, a scale, and a pencil
Tracing paper, templates, pencil, and a base plan
Tracing paper, pencil, scale, triangles, and a parallel edge
A building's exterior configuration and its structural system
A building's decorative materials and details
A building's existing lighting system
A building's historic style
Be able to discuss building technology with architects and engineers
Have detailed knowledge of all building technology issues
Have detailed knowledge of mechanical engineering issues
Be responsible for job site safety
Is rarely a significant factor in the space planning process
Control lighting design decisions
Can have major influence on space planning solutions
Are directly responsible for finish material selections
The building's agent should inform you of all the relevant codes
During the initial planning phase of design development
After the initial schematics have been developed
Codes should be the consulting architect's responsibility
Construction drawings
Presentation drawings
Design development
Preliminary design
Lists of contractors, sub-contractors and suppliers
Schematics, construction drawings and final cost estimates
Drawings, color boards, samples, and furniture selection
All of the above
The Radium Flux Test
The Chamber Test
Methenamine Pill Test
ASTM E-84 Steiner Tunnel Test
An aspect of the design development phase
Never shown to the clients as they are confusing
Detailed finalized plans for approval by the client before work begins
Used by contractors to give initial cost estimates to the client
Untreated, the fabric will ignite with the characteristics of cotton
The combination of the two will ignite at a lower temperature
The two different fibers will ignite at different temperatures
Polyester increases the ignition temperature, therefore improving the rating
Pinch pleats
Roll pleats
Roll shades
French pleats
Construction drawings
Presentation drawings
Design development
Preliminary design
Bidding
Supervision
Scheduling
Specifications
36" and 38" respectively
32" and 48" respectively
32" and 36" respectively
30" and 36"
Wait!
Here's an interesting quiz for you.