2S051 Vol 2 Ure Questions

Reviewed by Editorial Team
The ProProfs editorial team is comprised of experienced subject matter experts. They've collectively created over 10,000 quizzes and lessons, serving over 100 million users. Our team includes in-house content moderators and subject matter experts, as well as a global network of rigorously trained contributors. All adhere to our comprehensive editorial guidelines, ensuring the delivery of high-quality content.
Learn about Our Editorial Process
| By C5SGTCDC
C
C5SGTCDC
Community Contributor
Quizzes Created: 4 | Total Attempts: 1,421
| Attempts: 365
SettingsSettings
Please wait...
  • 1/92 Questions

    What letter is entered where on the AF Form 2005 for part number requests?

    • X in position 7.
    • R in position 7.
    • B in position 8.
    • P in position 8.
Please wait...
2S051 Vol 2 Ure Questions - Quiz
About This Quiz

The 2S051 VOL 2 URE QUESTIONS quiz assesses knowledge in Materiel Management within the Air Force, focusing on transaction codes, demand data, and management notices. It is designed to ensure readiness and efficiency in military logistics operations.


Quiz Preview

  • 2. 

    What number must be annotated on all documentation for small arms?

    • Container.

    • Model.

    • Serial.

    • Load.

    Correct Answer
    A. Serial.
    Explanation
    The number that must be annotated on all documentation for small arms is the serial number. This is essential for identification and tracking purposes, as each small arm has a unique serial number assigned to it. It helps in maintaining records, tracing the history of the weapon, and ensuring accountability. The serial number is a crucial piece of information that allows for proper documentation and management of small arms.

    Rate this question:

  • 3. 

    Which code on an issue request is used by the Materiel Management System to select the correct internal program to process an input transaction?

    • Transaction identification code (TRIC).

    • Transaction exception code (TEX).

    • Issue exception code (IEX).

    • System designator.

    Correct Answer
    A. Transaction identification code (TRIC).
    Explanation
    The Materiel Management System uses the Transaction Identification Code (TRIC) to select the correct internal program to process an input transaction. The TRIC serves as a unique identifier for different types of transactions, allowing the system to determine the appropriate program or process to handle the specific transaction. This ensures that the input transaction is processed correctly and efficiently within the Materiel Management System.

    Rate this question:

  • 4. 

    What transaction is used to process the updated status and location for a due-in from maintenance (DIFM) record?

    • TRIC DOC.

    • TRIC DFM.

    • TRIC ISU.

    • TRIC SPR.

    Correct Answer
    A. TRIC DFM.
    Explanation
    The correct answer is TRIC DFM. This transaction is used to process the updated status and location for a due-in from maintenance (DIFM) record. DIFM records are used to track items that are currently in maintenance and are due to be returned to inventory. The TRIC DFM allows users to update the status and location information for these items, ensuring accurate tracking and inventory management.

    Rate this question:

  • 5. 

    What is sent to the materiel management computer system when a mission capable (MICAP) requisition is transmitted to the source of supply with immediately available assets?

    • Follow-up.

    • Cancellation.

    • Positive Status.

    • Negative Status.

    Correct Answer
    A. Positive Status.
    Explanation
    When a mission capable (MICAP) requisition is transmitted to the source of supply with immediately available assets, a positive status is sent to the materiel management computer system. This means that the source of supply confirms that they have the requested assets in stock and are able to fulfill the requisition immediately. This positive status update allows the materiel management computer system to proceed with processing the requisition and arranging for the delivery of the assets to the requesting unit or individual.

    Rate this question:

  • 6. 

    What is used on a turn-in request for DIFM items indicating what actions were taken by maintenance and LRS/Materiel Management activity?

    • Demand code.

    • Action taken code.

    • Issue exception code.

    • MICAP delete code.

    Correct Answer
    A. Action taken code.
    Explanation
    The action taken code is used on a turn-in request for DIFM items to indicate what actions were taken by maintenance and LRS/Materiel Management activity. This code helps track and document the specific actions and steps that were taken in regards to the DIFM items, providing a clear record of the maintenance and management activities performed.

    Rate this question:

  • 7. 

    Failure to process turnaround (TRN) data in a correct and timely manner results in reduced base stock levels and incomplete reports from which buy, repair, and distribution decisions are made by

    • HQ AFMC.

    • Cataloging and Standardization Office (CASO).

    • Government Services Administration (GSA).

    • Defense Logistics Agency (DLA).

    Correct Answer
    A. HQ AFMC.
    Explanation
    Failure to process turnaround (TRN) data in a correct and timely manner can have negative consequences on base stock levels and reports. This is because TRN data is crucial for making decisions related to buying, repairing, and distributing resources. If the TRN data is not processed correctly and on time, it can lead to reduced base stock levels and incomplete reports. In this scenario, HQ AFMC is the entity responsible for making these decisions based on the reports. Therefore, if TRN data is not processed correctly and timely, HQ AFMC will be affected.

    Rate this question:

  • 8. 

    Which activity and organization code is used when loading a supply point detail document number?

    • B, 005.

    • B, 100.

    • S, 005.

    • S, 100.

    Correct Answer
    A. S, 005.
    Explanation
    When loading a supply point detail document number, the activity and organization code used is S, 005.

    Rate this question:

  • 9. 

    When the Materiel Management System detects an error in a transaction sent by CAMS the image is

    • Deleted from CAMS.

    • Returned to CAMS.

    • Forwarded to SIFS.

    • Returned to SIFS.

    Correct Answer
    A. Returned to CAMS.
    Explanation
    The Materiel Management System detects an error in a transaction sent by CAMS, it means that there was a mistake or issue with the transaction. In such cases, it is common practice to return the transaction back to the original sender for correction or further action. Therefore, the correct answer is "returned to CAMS."

    Rate this question:

  • 10. 

    What information needs to be aggressively monitored and updated on a mission capability (MICAP) requirement?

    • Status.

    • Follow-up.

    • Cause code.

    • Delete code.

    Correct Answer
    A. Status.
    Explanation
    The status of a mission capability (MICAP) requirement needs to be aggressively monitored and updated. This is because the status provides information about the progress and current state of the requirement. By monitoring the status, it becomes easier to track the fulfillment of the requirement and take necessary actions if any issues or delays arise. Regular updates ensure that all stakeholders are informed about the latest developments and can make informed decisions based on the current status of the requirement.

    Rate this question:

  • 11. 

    What is the purpose of performing a due-in from maintenance (DIFM) reconciliation between the Logistics Readiness Squadron (LRS) and the maintenance activities?

    • Ensure maintenance activities physically have all the DIFM items.

    • Ensure a replacement request is submitted to Logistics Readiness Squadron (LRS).

    • To load a multiple DIFM flag indicator to the item record.

    • To inventory all expendable items in stock.

    Correct Answer
    A. Ensure maintenance activities physically have all the DIFM items.
    Explanation
    Performing a due-in from maintenance (DIFM) reconciliation between the Logistics Readiness Squadron (LRS) and the maintenance activities is done to ensure that the maintenance activities actually possess all the DIFM items. This process helps in verifying that the items are physically available and can be used for maintenance purposes. It ensures that the maintenance activities have the necessary resources to carry out their tasks effectively.

    Rate this question:

  • 12. 

    The decision to transfer Mobility readiness spares package (MRSP) rests with the host and the

    • Losing Accountable Officer.

    • Losing MAJCOM.

    • Gaining MAJCOM.

    • Gaining Accountable Officer.

    Correct Answer
    A. Gaining MAJCOM.
    Explanation
    The decision to transfer Mobility readiness spares package (MRSP) rests with the gaining MAJCOM. The MRSP is a package of spare parts and equipment that is pre-positioned at various locations to support rapid deployment and sustainment of mobility forces. Since the MRSP is intended to support the operations of the gaining MAJCOM, it makes sense that the decision to transfer the package would be made by the gaining MAJCOM, as they would have the best knowledge of their specific needs and requirements. The losing MAJCOM and accountable officers may be involved in the transfer process, but the ultimate decision lies with the gaining MAJCOM.

    Rate this question:

  • 13. 

    What one position alpha code is used to indicate how the Materiel Management System accumulates demand data for stock leveling and due in from maintenance (DIFM) control?

    • Demand code.

    • Transaction codes.

    • Force Activity Designator.

    • Urgency justification code.

    Correct Answer
    A. Demand code.
    Explanation
    The correct answer is demand code. The demand code is used to indicate how the Materiel Management System accumulates demand data for stock leveling and due in from maintenance (DIFM) control. It helps in determining the quantity and timing of stock replenishment based on the demand for a particular item. Transaction codes are used to identify specific types of transactions in the system. Force Activity Designator is used to identify the force activity responsible for a particular item. Urgency justification code is used to prioritize requests based on their urgency.

    Rate this question:

  • 14. 

    Which management notice reflects the total base asset position of an item?

    • I004.

    • I005.

    • I007.

    • I023.

    Correct Answer
    A. I023.
    Explanation
    Management notice I023 reflects the total base asset position of an item.

    Rate this question:

  • 15. 

    What transaction can be processed on an existing requisition that will initiate mission capability (MICAP) reporting?

    • Upgrade.

    • Downgrade.

    • Follow-up.

    • Cancellation.

    Correct Answer
    A. Upgrade.
    Explanation
    An upgrade transaction on an existing requisition can initiate mission capability (MICAP) reporting. This means that if there is a need to improve or enhance the capabilities of the requisition, an upgrade transaction can be processed to trigger the MICAP reporting process. This could involve upgrading the specifications, features, or performance of the requested items or services to ensure that they meet the required mission capabilities.

    Rate this question:

  • 16. 

    Shelf life assets are tracked in the Mobility Inventory Control and Accountability System (MICAS) web by

    • National stock number.

    • Serial number.

    • Contract/lot number.

    • Part number.

    Correct Answer
    A. Contract/lot number.
    Explanation
    Shelf life assets, which have a limited lifespan, are tracked in the Mobility Inventory Control and Accountability System (MICAS) web by their contract/lot number. This number allows for easy identification and management of these assets, ensuring that they are used before their expiration date. National stock numbers, serial numbers, and part numbers are not specifically designed for tracking shelf life assets and may not provide the necessary information for proper management.

    Rate this question:

  • 17. 

    What is scanned when returning mobility items through Mobility Inventory and Accountability System (MICAS) web?

    • GPC card.

    • Issue document.

    • Warehouse badge.

    • Military ID card or CAC.

    Correct Answer
    A. Military ID card or CAC.
    Explanation
    When returning mobility items through the Mobility Inventory and Accountability System (MICAS) web, the scanned item is the Military ID card or CAC. This is likely because the system requires verification of the individual returning the items, and the Military ID card or CAC serves as a form of identification for this purpose. The GPC card, issue document, and warehouse badge are not mentioned as items that need to be scanned during the return process, suggesting that they are not relevant in this context.

    Rate this question:

  • 18. 

    An I007 management notice will be produced when a

    • Part number request can be converted to a single stock number under program control.

    • Part number request cannot be converted to a stock number under program control.

    • Stock number request can be converted to multiple part numbers.

    • Stock number request cannot be converted to a part number.

    Correct Answer
    A. Part number request cannot be converted to a stock number under program control.
    Explanation
    An I007 management notice will be produced when a part number request cannot be converted to a stock number under program control. This means that if a user requests a specific part number, but the system is unable to find a corresponding stock number for that part, it will generate an I007 management notice. This notice serves as a notification to the user that their requested part number cannot be fulfilled due to program control limitations.

    Rate this question:

  • 19. 

    Who is responsible for physical material handling, receipt, storage, and processing of war reserve material (WRM) shipment request?

    • Bases.

    • Source of supply (SOS).

    • MAJCOM.

    • AFMC.

    Correct Answer
    A. Bases.
    Explanation
    Bases are responsible for the physical material handling, receipt, storage, and processing of war reserve material (WRM) shipment requests. They are the primary locations where these activities take place, ensuring that the materials are properly handled, stored, and processed according to established procedures and guidelines. The bases play a crucial role in the logistics and management of WRM, ensuring that the materials are readily available and in good condition when needed.

    Rate this question:

  • 20. 

    What process is used to have shelf life controls and other inspection functions for RSP assets?

    • TAV.

    • SIFS.

    • COSIS.

    • DIREPS.

    Correct Answer
    A. COSIS.
    Explanation
    COSIS is the process used to have shelf life controls and other inspection functions for RSP assets. This implies that COSIS is a system or method specifically designed for monitoring the shelf life of assets and conducting inspections. TAV, SIFS, and DIREPS are not mentioned in the context of shelf life controls or inspection functions, so they are not the correct answers.

    Rate this question:

  • 21. 

    Who must ensure that additional controls are exercised over all weapons movements, marshaling, and deployments at the deployed location?

    • Resource advisor.

    • Maintenance supervisor.

    • Security forces.

    • Accountable Officer (AO) or commander.

    Correct Answer
    A. Accountable Officer (AO) or commander.
    Explanation
    The Accountable Officer (AO) or commander must ensure that additional controls are exercised over all weapons movements, marshaling, and deployments at the deployed location. This responsibility falls on them as they have the authority and accountability to oversee and manage the weapons and their movements. They are responsible for ensuring that proper protocols and procedures are followed to maintain the security and safety of the weapons at all times. The AO or commander is ultimately responsible for the proper handling and control of the weapons in their command.

    Rate this question:

  • 22. 

    What benefit can occur by challenging possibly inflated urgency-of-need designators (UNDs) and urgency justification codes (UJCs) on an issue request?

    • Increase the number of Uniform Materiel Movement and Issue Priority System (UMMIPS) occurrences.

    • Reduce the number of UMMIPS violations.

    • Increase the cost of priority requirements.

    • Reduce the number of supply transactions.

    Correct Answer
    A. Reduce the number of UMMIPS violations.
    Explanation
    By challenging possibly inflated urgency-of-need designators (UNDs) and urgency justification codes (UJCs) on an issue request, it can help reduce the number of UMMIPS violations. UMMIPS violations occur when there is a mismatch between the urgency of the request and the actual need for the item. Challenging inflated UNDs and UJCs ensures that the requests are justified and prioritized correctly, reducing the likelihood of unnecessary and incorrect prioritization. This can help prevent UMMIPS violations and ensure that resources are allocated properly based on genuine urgency and need.

    Rate this question:

  • 23. 

    Which base wide organization utilizes the core automated maintenance system (CAMS) to interface with Materiel Management System?

    • Base Supply.

    • Maintenance.

    • Civil Engineering.

    • Vehicle Maintenance.

    Correct Answer
    A. Maintenance.
    Explanation
    The correct answer is Maintenance. The question is asking which base wide organization uses the core automated maintenance system (CAMS) to interface with the Materiel Management System. Out of the given options, Maintenance is the most logical choice as it directly relates to the maintenance of equipment and would require a system like CAMS to manage and interface with the Materiel Management System. Base Supply, Civil Engineering, and Vehicle Maintenance are not directly related to the use of CAMS for interfacing with the Materiel Management System.

    Rate this question:

  • 24. 

    What activity code identifies an issue request as a core automated maintenance system (CAMS) document?

    • X.

    • R.

    • J.

    • C.

    Correct Answer
    A. J.
    Explanation
    The activity code "J" identifies an issue request as a core automated maintenance system (CAMS) document. This code is specifically assigned to CAMS documents, indicating that the issue request is related to the automated maintenance system.

    Rate this question:

  • 25. 

    What status is transmitted from the depot when assets are not available for a mission capable (MICAP) requisition?

    • Backorder.

    • Follow-up.

    • Cancellation.

    • Positive Status.

    Correct Answer
    A. Backorder.
    Explanation
    When assets are not available for a Mission Capable (MICAP) requisition, the status that is transmitted from the depot is "Backorder". This means that the requested assets are currently out of stock or unavailable, and the depot is unable to fulfill the requisition at the moment. The backorder status indicates that the request will be placed on hold until the assets become available again, and the depot will fulfill the requisition as soon as possible.

    Rate this question:

  • 26. 

    Which Basic Expeditionary Airfield Resource (BEAR) system includes facilities, equipment, and supplies necessary to establish and support aircraft flight-related operations and maintenance activities for an initial aircraft squadron deployed at a bare base location?  

    • Housekeeping support.

    • Industrial operations.

    • Initial flight line.

    • Follow-on flight line.

    Correct Answer
    A. Initial flight line.
    Explanation
    The correct answer is "Initial flight line." The initial flight line is a Basic Expeditionary Airfield Resource (BEAR) system that includes facilities, equipment, and supplies needed to establish and support aircraft flight-related operations and maintenance activities for an initial aircraft squadron deployed at a bare base location. This system provides the necessary infrastructure and resources to support the initial deployment and operations of aircraft at a new location.

    Rate this question:

  • 27. 

    What personal computer (PC) program is used to manage mobility bags (MOBAGS)?

    • Contingency Operation/Mobility Planning and Execution System (COMPES).

    • Mobility Inventory Control and Accountability System (MICAS) web.

    • Weapon System Management Information System (WSMIS).

    • PC–Aircraft Sustainability Model (PC–ASM).

    Correct Answer
    A. Mobility Inventory Control and Accountability System (MICAS) web.
    Explanation
    The correct answer is Mobility Inventory Control and Accountability System (MICAS) web. MICAS web is a personal computer program that is used to manage mobility bags (MOBAGS). It is a system that allows for the control and accountability of mobility bags, ensuring that they are properly managed and accounted for. This program is specifically designed for this purpose and is the most appropriate choice among the given options.

    Rate this question:

  • 28. 

    Which management notice will be produced because of issue processing and reflects issue, kill, or backorder quantity status?

    • I004.

    • I005.

    • I007.

    • I023.

    Correct Answer
    A. I004.
    Explanation
    The correct answer is I004. This management notice will be produced because of issue processing and reflects issue, kill, or backorder quantity status.

    Rate this question:

  • 29. 

    Which report is transmitted to the applicable source of supply to report the initiation, termination, or change to a mission capability (MICAP) condition?

    • MICAP status report (E40).

    • MICAP report (B9*).

    • MICAP report (NOR).

    • MICAP report (D9*).

    Correct Answer
    A. MICAP report (B9*).
    Explanation
    The correct answer is MICAP report (B9*). This report is transmitted to the applicable source of supply to report the initiation, termination, or change to a mission capability (MICAP) condition. The B9* code indicates that it is specifically a MICAP report.

    Rate this question:

  • 30. 

    Which listing is used to perform the due-in from maintenance (DIFM) reconciliation?

    • D19.

    • D20.

    • D23.

    • Q04.

    Correct Answer
    A. D23.
    Explanation
    The listing used to perform the due-in from maintenance (DIFM) reconciliation is D23.

    Rate this question:

  • 31. 

    Which action taken code indicates an item is condemned?

    • F

    • 1

    • 9

    • A

    Correct Answer
    A. 9
    Explanation
    The action taken code "9" indicates that an item is condemned.

    Rate this question:

  • 32. 

    The repair cycle process concept involving the practice of sending certain XD2 assets directly to the depot for repair, without first attempting to repair them at base level, reduces the number of maintenance levels from

    • 3 to 2.

    • 3 to 1.

    • 2 to 1.

    • 1 to 0.

    Correct Answer
    A. 3 to 2.
    Explanation
    The repair cycle process concept involves sending certain XD2 assets directly to the depot for repair instead of attempting to repair them at the base level. This reduces the number of maintenance levels from 3 to 2. This means that instead of going through three levels of maintenance, the assets only go through two levels, which can save time and resources.

    Rate this question:

  • 33. 

    Which listing reflects awaiting parts (AWP) due-out detail records with their applicable due-in and status detail records?

    • D19.

    • D20.

    • D23.

    • Q04.

    Correct Answer
    A. D19.
    Explanation
    D19 reflects awaiting parts (AWP) due-out detail records with their applicable due-in and status detail records.

    Rate this question:

  • 34. 

    What transaction identification code (TRIC) is processed to transfer between mobility readiness spares package (MRSP) and War Reserve Materiel (WRM) detail records?

    • DOR.

    • ISU.

    • 1EB.

    • 1KT.

    Correct Answer
    A. 1KT.
    Explanation
    The transaction identification code (TRIC) 1KT is processed to transfer between mobility readiness spares package (MRSP) and War Reserve Materiel (WRM) detail records.

    Rate this question:

  • 35. 

    What is assigned to all items inside mobility bags for tracking purposes through Mobility Inventory Control and Accountability System (MICAS) web?

    • NSN.

    • Document number.

    • KIT ID/serial number.

    • NSN/manufacturer number.

    Correct Answer
    A. KIT ID/serial number.
    Explanation
    All items inside mobility bags are assigned a KIT ID/serial number for tracking purposes through the Mobility Inventory Control and Accountability System (MICAS) web. This unique identifier allows for easy identification and tracking of the items within the bags. It helps in maintaining inventory control and accountability by associating each item with a specific KIT ID/serial number.

    Rate this question:

  • 36. 

    Who needs to be contacted when an I023 management notice shows Interchangeable Substitute Group (ISG) items are available?

    • Customer.

    • Item manager.

    • Customer support.

    • Warehouse supervisor.

    Correct Answer
    A. Customer.
    Explanation
    When an I023 management notice shows Interchangeable Substitute Group (ISG) items are available, the customer needs to be contacted. This is because the ISG items are alternative products that can be substituted for the original item requested by the customer. Therefore, it is important to inform the customer about the availability of these substitute items and discuss whether they would like to proceed with the substitution or make any changes to their order.

    Rate this question:

  • 37. 

    Where will processed returns in a serviceable condition be forwarded to after receiving a "notice to stock" document?

    • SOS.

    • DLADS.

    • Return to customer.

    • Appropriate storage facility.

    Correct Answer
    A. Appropriate storage facility.
    Explanation
    After receiving a "notice to stock" document, processed returns in a serviceable condition will be forwarded to an appropriate storage facility. This means that the returns will be stored in a designated location that is suitable for their preservation and future use. The storage facility will ensure that the returns are kept in a secure and organized manner, ready to be accessed and utilized as needed.

    Rate this question:

  • 38. 

    What document shows authorization for war reserve material (WRM) items based entirely on formal wartime tasking?

    • AF form 2005

    • DD form 1348–1A.

    • Mission capability (MICAP) report.

    • War and mobilization plan (WMP).

    Correct Answer
    A. War and mobilization plan (WMP).
    Explanation
    The War and Mobilization Plan (WMP) is the document that shows authorization for War Reserve Material (WRM) items based entirely on formal wartime tasking. This plan outlines the specific requirements and allocations of WRM items during times of war or mobilization. It serves as a guide for the military in determining the necessary resources and materials needed to support operations during a conflict. The WMP ensures that the WRM items are properly authorized and allocated based on the formal tasking received.

    Rate this question:

  • 39. 

    What section stores small arms for mobility use?

    • Storage.

    • Supply Point.

    • Security forces.

    • Individual protective equipment.

    Correct Answer
    A. Individual protective equipment.
    Explanation
    The correct answer is Individual protective equipment. This section is responsible for storing small arms that are used for mobility purposes. It is crucial to have proper storage for individual protective equipment to ensure the safety and readiness of security forces.

    Rate this question:

  • 40. 

    What transaction exception code is used to reprocess the issue request when the customer requests a backorder?

    • 1.

    • 2.

    • M.

    • P.

    Correct Answer
    A. M.
    Explanation
    The transaction exception code "M" is used to reprocess the issue request when the customer requests a backorder.

    Rate this question:

  • 41. 

    What code found on the mission capability (MICAP) report (DIC B9*) identifies the reason for termination of the MICAP condition?

    • Reason why.

    • Report.

    • Delete.

    • Cause.

    Correct Answer
    A. Delete.
    Explanation
    The code "Delete" found on the mission capability (MICAP) report identifies the reason for termination of the MICAP condition. This suggests that when the code "Delete" is used, it signifies that the MICAP condition has been removed or deleted from the report, indicating that the issue or problem that required the MICAP condition no longer exists.

    Rate this question:

  • 42. 

    What will the computer scan for in its internal records after an item was repaired and turned in serviceable?

    • Due-outs.

    • Due-ins.

    • Follow ups.

    • Cancellation.

    Correct Answer
    A. Due-outs.
    Explanation
    After an item has been repaired and turned in serviceable, the computer will scan its internal records for due-outs. This means that it will check for any pending requests or outstanding commitments for the item, such as items that have been reserved or requested by other users. This is important to ensure that the item is not already allocated to someone else and can be made available for use again.

    Rate this question:

  • 43. 

    Which action taken code indicates an item is not authorized base level repair?

    • F

    • 1

    • 8

    • A

    Correct Answer
    A. 1
    Explanation
    The action taken code "1" indicates that an item is not authorized for base level repair.

    Rate this question:

  • 44. 

    Which type mobility bag (MOBAG) contains cold weather equipment?

    • A

    • B

    • C

    • D

    Correct Answer
    A. B
  • 45. 

    What action code is used when transferring multiple quantities from a mobility readiness spares package (MRSP) or War Reserve Materiel (WRM) detail record?

    • A

    • B

    • M

    • S

    Correct Answer
    A. M
    Explanation
    The action code "M" is used when transferring multiple quantities from a mobility readiness spares package (MRSP) or War Reserve Materiel (WRM) detail record. This suggests that the "M" action code is specifically designated for this type of transfer, indicating that it is the appropriate choice when moving multiple quantities from MRSP or WRM records.

    Rate this question:

  • 46. 

    To account for all transactions during degraded operations, the proper paperwork must be filled out and maintained until input into the

    • Contingency Processing System.

    • Materiel Management System.

    • PC-ASM.

    • INMARSAT.

    Correct Answer
    A. Materiel Management System.
    Explanation
    To account for all transactions during degraded operations, the proper paperwork must be filled out and maintained until input into the Materiel Management System. The Materiel Management System is a software application used by organizations to manage their inventory and logistics operations. It allows for the tracking and recording of all transactions related to the movement and storage of materials. By inputting the paperwork into the system, the organization can ensure that all transactions are properly documented and accounted for, even during degraded operations.

    Rate this question:

  • 47. 

    Which update is prepared and processed by repair cycle support (RCS) to update demand data on the item record and repair cycle data on the repair cycle record?

    • Calibration.

    • Turnaround.

    • Repair cycle.

    • Cannibalization.

    Correct Answer
    A. Turnaround.
    Explanation
    The correct answer is "Turnaround." In the repair cycle support (RCS) process, the turnaround update is used to update demand data on the item record and repair cycle data on the repair cycle record. This update helps to track and manage the repair cycle and ensure that the necessary repairs are carried out efficiently. Calibration, repair cycle, and cannibalization updates do not specifically address the updating of demand data and repair cycle data in the same way as the turnaround update.

    Rate this question:

  • 48. 

    Who maintains ownership of supply point assets until they are used?

    • LRS.

    • SOS.

    • Maintenance.

    • Equipment element.

    Correct Answer
    A. LRS.
    Explanation
    LRS (Logistic Readiness Squadron) maintains ownership of supply point assets until they are used. This means that the squadron is responsible for the management and control of these assets until they are utilized for their intended purposes. They ensure that the assets are properly maintained and accounted for, ensuring their availability and functionality when needed.

    Rate this question:

  • 49. 

    In the master file, what format are readiness spares package (RSP) data authorization input records received from MAJCOM?

    • FKD.

    • XSF.

    • XVF.

    • 1EB.

    Correct Answer
    A. XVF.
    Explanation
    The readiness spares package (RSP) data authorization input records are received from MAJCOM in the XVF format.

    Rate this question:

Quiz Review Timeline (Updated): Mar 20, 2023 +

Our quizzes are rigorously reviewed, monitored and continuously updated by our expert board to maintain accuracy, relevance, and timeliness.

  • Current Version
  • Mar 20, 2023
    Quiz Edited by
    ProProfs Editorial Team
  • Oct 06, 2016
    Quiz Created by
    C5SGTCDC
Advertisement
×

Wait!
Here's an interesting quiz for you.

We have other quizzes matching your interest.