System Analysis And Design Trivia Questions

22 Questions | Total Attempts: 269

SettingsSettingsSettings
Please wait...
System Analysis And Design Trivia Questions

A computer system is one complex thing and concept to understand. System designers have to come up with a system that solves a particular problem. Take up the quiz below and see how good you are.


Questions and Answers
  • 1. 
    THE______________is a realistic approach to the development of large-scale software products because the software evolves as the process progresses.
    • A. 

      SPIRAL

    • B. 

      ITERATIVE

    • C. 

      WATERFALL

  • 2. 
    Which of the following IS not part of Spiral Model Task?
    • A. 

      Planning

    • B. 

      Risk Analysis

    • C. 

      Engineering

    • D. 

      Construction and Release

    • E. 

      Customer Evaluation

    • F. 

      Customer Interaction

  • 3. 
      Is a type of bar chart, developed by Henry Gantt in the 1910s and illustrates as a project schedule.
    • A. 

      PERT

    • B. 

      GANTT

    • C. 

      HENRY

    • D. 

      FLOWCHART

  • 4. 
    Is an event that receives special attention. It is often falsely put at the end of a stage to mark the completion of a work package or phase.
    • A. 

      BEGIN

    • B. 

      START

    • C. 

      MILESTONE

    • D. 

      TARGET

  • 5. 
      An event that occurs as a result of reaching a point in time.
    • A. 

      STATE

    • B. 

      TEMPORAL

    • C. 

      EXTERNAL

  • 6. 
    Is a type of static structure diagram that describes the structure of a system by showing the system’s classes, their attributes, operations (method) and the relationships among the classes
    • A. 

      DFD

    • B. 

      ERD

    • C. 

      CLASS DIAGRAM

    • D. 

      SEQUENCE DIAGRAM

  • 7. 
    Is a construct that is used to define a distinct type.
    • A. 

      ENTITY

    • B. 

      PROCESS

    • C. 

      CLASS

  • 8. 
    Is a specification that defines a property of an object, element or file
    • A. 

      ATTRIBUTE

    • B. 

      RELATIONSHIP

    • C. 

      FOREIGN KEY

  • 9. 
    Is a sequential design process, often used in software development processes, in which progress is seen as flowing steadily downwards.
    • A. 

      TOP DOWN APPROACH

    • B. 

      WATERFALL MODEL

    • C. 

      SPIRAL MODEL

    • D. 

      INCREMENTAL MODEL

  • 10. 
    A third type of event is a state event, events that occurs when something happens inside the system that triggers the need for processing
    • A. 

      TEMPORAL

    • B. 

      STATE

    • C. 

      EXTERNAL

  • 11. 
    It  is  a kind of Interaction Diagram that shows how its process operate with one another and in what order
    • A. 

      CLASS DIAGRAM

    • B. 

      ERD

    • C. 

      DFD

    • D. 

      SEQUENCE DIAGRAM

  • 12. 
    It is an event that occurs outside the system, usually initiated by an external agent or actor.
    • A. 

      EXTERNAL

    • B. 

      TEMPORAL

    • C. 

      STATE

  • 13. 
    Are graphical representations of workflows of stepwise activities and actions with support for choice, iteration and concurrency.
    • A. 

      SEQUENCE DIAGRAM

    • B. 

      ACTIVITY DIAGRAM

    • C. 

      USE CASE DIAGRAM

  • 14. 
     The combination is of long standing and has been widely suggested for large development efforts.
    • A. 

      WATERFALL

    • B. 

      SPIRAL

    • C. 

      ITERATIVE

    • D. 

      PROTOTYPE

  • 15. 
    What is the last stage of Incremental Model?
    • A. 

      FINALIZATION

    • B. 

      DEPLOYMENT

    • C. 

      PACKAGING

    • D. 

      IMPLEMENTATION

  • 16. 
    Is a graphic representation of a project’s schedule, showing the sequence of tasks, which tasks can be performed simultaneously, and the critical path of tasks that must be completed on time in order for the project to meet its completion deadline. Emphasize relationships between tasks.
    • A. 

      FLOWCHART

    • B. 

      PERT CHART

    • C. 

      GANTT CHART

  • 17. 
    The WBS represents a logical decomposition of the work to be performed and focuses on how the product, service, or result is naturally subdivided. It is an outline of what work is to be performed
    • A. 

      WBS

    • B. 

      WSS

    • C. 

      WDS

  • 18. 
    Which of the following is not part of the level in WBS?
    • A. 

      PROJECT

    • B. 

      CATEGORY

    • C. 

      SUBCATEGORY

    • D. 

      SUB-SUBCATEGORY

    • E. 

      MANAGEMENT

    • F. 

      WORK PACKAGE

  • 19. 
       WHAT TYPE OF MODEL IS THIS?
    • A. 

      SPIRAL

    • B. 

      WATERFALL

    • C. 

      INCREMENTAL

  • 20. 
    What type diagram is this?
    • A. 

      Sequence

    • B. 

      Class

    • C. 

      Use case

  • 21. 
    Is this a USE CASE diagram?
    • A. 

      True

    • B. 

      False