Professional Practice 06

23 Questions | Total Attempts: 4208

SettingsSettingsSettings
Please wait...
Professional Practice Quizzes & Trivia

Prepared by:Arch. /EnP. RSGabitan


Questions and Answers
  • 1. 
    Which of the following describes the lump sum or fixed fee method?
    • A. 

      Related to size and type of project

    • B. 

      Applies generally to government projects

    • C. 

      Applicable only to pre-design services

    • D. 

      Most commonly used in ASEAN

  • 2. 
    Which of the following describes a bid bulletin?
    • A. 

      Instruction on bid preparation and contract award

    • B. 

      Additional information issued prior to bidding date

    • C. 

      Procedural/administrative aspects of contract

    • D. 

      Type and trade names of materials

  • 3. 
    In a typical owner-architect agreement, who is responsible for payment of surveys, soil explorations, and laboratory fees?
    • A. 

      Contractor

    • B. 

      Project Manager

    • C. 

      Architect

    • D. 

      Owner

  • 4. 
    What is the responsibility of the architect during the contract document phase of his services?
    • A. 

      Prepares documents for contracts letting/construction forms/abstract of bids

    • B. 

      Prepares design documents/construction drawings & specifications

    • C. 

      Makes periodic site visits

    • D. 

      Certifies work progress to owner

  • 5. 
    Which of the following does NOT constitute the post-construction services of the architect?
    • A. 

      Post-construction evaluation

    • B. 

      Building/ground administration

    • C. 

      Building/equipment maintenance

    • D. 

      Real property evaluation

  • 6. 
    Under design services, the min. basic fee of laboratories w/ project construction cost of P50 million and less is
    • A. 

      6%

    • B. 

      7%

    • C. 

      8%

    • D. 

      10%

  • 7. 
    The minimum basic fee of parking structure with a project construction cost of 50 million and less is
    • A. 

      6%

    • B. 

      7%

    • C. 

      8%

    • D. 

      10%

  • 8. 
    The min. basic fee of publishing plants w/ a project construction cost of 50 million & less is
    • A. 

      6%

    • B. 

      7%

    • C. 

      8%

    • D. 

      9%

  • 9. 
    The fee of the architect for Design-Build Services by administration aside from his fee for the regular design services is
    • A. 

      6%

    • B. 

      7%

    • C. 

      8%

    • D. 

      10%

  • 10. 
    In repetitive construction of building, what percent of the basic minimum fee is charged on succeeding structures after the third structure?
    • A. 

      20%

    • B. 

      30%

    • C. 

      40%

    • D. 

      60%

  • 11. 
    The minimum fee per appearance of an architect when rendering services as an expert shall be
    • A. 

      P200

    • B. 

      P500

    • C. 

      P750

    • D. 

      P1000

  • 12. 
    Under Design Services, the minimum basic of fee of retail stores with project construction cost P 50 Million and less is
    • A. 

      6%

    • B. 

      7%

    • C. 

      8%

    • D. 

      10%

  • 13. 
    Comprehensive planning is one of the activities that fall under:
    • A. 

      Construction services

    • B. 

      Design services

    • C. 

      Specialized Allied services

    • D. 

      Post Construction services

  • 14. 
    Compensation for services should be increased to a total of how many percent of the basic fee for alterations of existing structures belonging to groups 7 to 5?
    • A. 

      50%

    • B. 

      100%

    • C. 

      150%

    • D. 

      200%

  • 15. 
    With a project construction cost of P50 Million & less, the min. basic fee of supermarkets is:
    • A. 

      6%

    • B. 

      7%

    • C. 

      8%

    • D. 

      12%

  • 16. 
    With a project construction of P50 million and less, the min. basic fee of public markets is:
    • A. 

      6%

    • B. 

      7%

    • C. 

      8%

    • D. 

      12%

  • 17. 
    Preparation of shop drawing is the sole function of the:
    • A. 

      Architect

    • B. 

      Project Manager

    • C. 

      Full-time Supervisor

    • D. 

      Contractor

  • 18. 
    Additional information on contract documents issued to bidders before date of bidding is:
    • A. 

      Supplementary Documents

    • B. 

      Bid Bulletin

    • C. 

      Instruction to Bidders

    • D. 

      Addemdum

  • 19. 
    Within how many days from the date a change is ordered shall any claim for adjustment involving questions of facts be asserted?
    • A. 

      5 days

    • B. 

      10 days

    • C. 

      15 days

    • D. 

      30 days

  • 20. 
    Stipulation of the use of specific products or process without provision for substitution is a
    • A. 

      Bill of Materials

    • B. 

      Closed specifications

    • C. 

      Manufacturers specifications

    • D. 

      Open specifications

  • 21. 
    A statement from the architect confirming the amount of money due the contractor for work accomplished is a:
    • A. 

      Certificate of Completion

    • B. 

      Certificate of Payment

    • C. 

      Certificate of Approval

    • D. 

      Billing Statement

  • 22. 
    The list of instructions stipulating the manner on how bids are to be prepared and conditions for the award of contract is:
    • A. 

      Bid Bulletin

    • B. 

      Bid Proposal

    • C. 

      Instruction to Bidders

    • D. 

      General Conditions

  • 23. 
    The fee of the architect for designed-build services on a guaranteed maximum cost aside from his fee for regular design services is:
    • A. 

      5%

    • B. 

      7%

    • C. 

      10%

    • D. 

      12%