Professional Practice 06

23 Questions | Attempts: 4308
Share
Please wait...
Question 1 / 23
0 %
0/100
Score 0/100
1. In a typical owner-architect agreement, who is responsible for payment of surveys, soil explorations, and laboratory fees?
Submit
Please wait...
About This Quiz
Professional Practice Quizzes & Trivia

Prepared by:

Arch. /EnP. RSGabitan

Tell us your name to personalize your report, certificate & get on the leaderboard!
2. Which of the following does NOT constitute the post-construction services of the architect?
Submit
3. Preparation of shop drawing is the sole function of the:
Submit
4. Stipulation of the use of specific products or process without provision for substitution is a
Submit
5. Which of the following describes a bid bulletin?
Submit
6. The minimum fee per appearance of an architect when rendering services as an expert shall be
Submit
7. The minimum basic fee of parking structure with a project construction cost of 50 million and less is
Submit
8. The list of instructions stipulating the manner on how bids are to be prepared and conditions for the award of contract is:
Submit
9. Which of the following describes the lump sum or fixed fee method?
Submit
10. Compensation for services should be increased to a total of how many percent of the basic fee for alterations of existing structures belonging to groups 7 to 5?
Submit
11. What is the responsibility of the architect during the contract document phase of his services?
Submit
12. Within how many days from the date a change is ordered shall any claim for adjustment involving questions of facts be asserted?
Submit
13. Comprehensive planning is one of the activities that fall under:
Submit
14. Under design services, the min. basic fee of laboratories w/ project construction cost of P50 million and less is
Submit
15. A statement from the architect confirming the amount of money due the contractor for work accomplished is a:
Submit
16. Additional information on contract documents issued to bidders before date of bidding is:
Submit
17. In repetitive construction of building, what percent of the basic minimum fee is charged on succeeding structures after the third structure?
Submit
18. With a project construction cost of P50 Million & less, the min. basic fee of supermarkets is:
Submit
19. With a project construction of P50 million and less, the min. basic fee of public markets is:
Submit
20. Under Design Services, the minimum basic of fee of retail stores with project construction cost P 50 Million and less is
Submit
21. The fee of the architect for designed-build services on a guaranteed maximum cost aside from his fee for regular design services is:
Submit
22. The fee of the architect for Design-Build Services by administration aside from his fee for the regular design services is
Submit
23. The min. basic fee of publishing plants w/ a project construction cost of 50 million & less is
Submit
View My Results

Quiz Review Timeline (Updated): Jul 29, 2013 +

Our quizzes are rigorously reviewed, monitored and continuously updated by our expert board to maintain accuracy, relevance, and timeliness.

  • Current Version
  • Jul 29, 2013
    Quiz Edited by
    ProProfs Editorial Team
  • Feb 27, 2009
    Quiz Created by
    Raegab
Cancel
  • All
    All (23)
  • Unanswered
    Unanswered ()
  • Answered
    Answered ()
In a typical owner-architect agreement, who is responsible for payment...
Which of the following does NOT constitute the post-construction...
Preparation of shop drawing is the sole function of the:
Stipulation of the use of specific products or process without...
Which of the following describes a bid bulletin?
The minimum fee per appearance of an architect when rendering services...
The minimum basic fee of parking structure with a project construction...
The list of instructions stipulating the manner on how bids are to be...
Which of the following describes the lump sum or fixed fee method?
Compensation for services should be increased to a total of how many ...
What is the responsibility of the architect during the contract...
Within how many days from the date a change is ordered shall any claim...
Comprehensive planning is one of the activities that fall under:
Under design services, the min. basic fee of laboratories w/ project...
A statement from the architect confirming the amount of money due the...
Additional information on contract documents issued to bidders before...
In repetitive construction of building, what percent of the basic ...
With a project construction cost of P50 Million & less, the min....
With a project construction of P50 million and less, the min. basic...
Under Design Services, the minimum basic of fee of retail stores with...
The fee of the architect for designed-build services on a guaranteed ...
The fee of the architect for Design-Build Services by administration...
The min. basic fee of publishing plants w/ a project construction cost...
Alert!

Advertisement