    In a typical owner-architect agreement, who is responsible for payment of surveys, soil explorations, and laboratory fees?

    • Contractor
    • Project Manager
    • Architect
    • Owner
Please wait...
About This Quiz

Prepared by:

Arch. /EnP. RSGabitan

Professional Practice Quizzes & Trivia

Quiz Preview

  • 2. 

    Which of the following does NOT constitute the post-construction services of the architect?

    • Post-construction evaluation

    • Building/ground administration

    • Building/equipment maintenance

    • Real property evaluation

    Correct Answer
    A. Real property evaluation
  • 3. 

    Preparation of shop drawing is the sole function of the:

    • Architect

    • Project Manager

    • Full-time Supervisor

    • Contractor

    Correct Answer
    A. Contractor
  • 4. 

    Stipulation of the use of specific products or process without provision for substitution is a

    • Bill of Materials

    • Closed specifications

    • Manufacturers specifications

    • Open specifications

    Correct Answer
    A. Closed specifications
  • 5. 

    Which of the following describes a bid bulletin?

    • Instruction on bid preparation and contract award

    • Additional information issued prior to bidding date

    • Procedural/administrative aspects of contract

    • Type and trade names of materials

    Correct Answer
    A. Additional information issued prior to bidding date
  • 6. 

    The minimum fee per appearance of an architect when rendering services as an expert shall be

    • P200

    • P500

    • P750

    • P1000

    Correct Answer
    A. P500
  • 7. 

    The minimum basic fee of parking structure with a project construction cost of 50 million and less is

    • 6%

    • 7%

    • 8%

    • 10%

    Correct Answer
    A. 6%
  • 8. 

    The list of instructions stipulating the manner on how bids are to be prepared and conditions for the award of contract is:

    • Bid Bulletin

    • Bid Proposal

    • Instruction to Bidders

    • General Conditions

    Correct Answer
    A. Instruction to Bidders
  • 9. 

    Which of the following describes the lump sum or fixed fee method?

    • Related to size and type of project

    • Applies generally to government projects

    • Applicable only to pre-design services

    • Most commonly used in ASEAN

    Correct Answer
    A. Applies generally to government projects
  • 10. 

    Compensation for services should be increased to a total of how many percent of the basic fee for alterations of existing structures belonging to groups 7 to 5?

    • 50%

    • 100%

    • 150%

    • 200%

    Correct Answer
    A. 150%
  • 11. 

    What is the responsibility of the architect during the contract document phase of his services?

    • Prepares documents for contracts letting/construction forms/abstract of bids

    • Prepares design documents/construction drawings & specifications

    • Makes periodic site visits

    • Certifies work progress to owner

    Correct Answer
    A. Prepares design documents/construction drawings & specifications
  • 12. 

    Within how many days from the date a change is ordered shall any claim for adjustment involving questions of facts be asserted?

    • 5 days

    • 10 days

    • 15 days

    • 30 days

    Correct Answer
    A. 15 days
  • 13. 

    Comprehensive planning is one of the activities that fall under:

    • Construction services

    • Design services

    • Specialized Allied services

    • Post Construction services

    Correct Answer
    A. Specialized Allied services
  • 14. 

    Under design services, the min. basic fee of laboratories w/ project construction cost of P50 million and less is

    • 6%

    • 7%

    • 8%

    • 10%

    Correct Answer
    A. 8%
  • 15. 

    A statement from the architect confirming the amount of money due the contractor for work accomplished is a:

    • Certificate of Completion

    • Certificate of Payment

    • Certificate of Approval

    • Billing Statement

    Correct Answer
    A. Certificate of Payment
  • 16. 

    Additional information on contract documents issued to bidders before date of bidding is:

    • Supplementary Documents

    • Bid Bulletin

    • Instruction to Bidders

    • Addemdum

    Correct Answer
    A. Bid Bulletin
  • 17. 

    In repetitive construction of building, what percent of the basic minimum fee is charged on succeeding structures after the third structure?

    • 20%

    • 30%

    • 40%

    • 60%

    Correct Answer
    A. 40%
  • 18. 

    With a project construction cost of P50 Million & less, the min. basic fee of supermarkets is:

    • 6%

    • 7%

    • 8%

    • 12%

    Correct Answer
    A. 7%
  • 19. 

    With a project construction of P50 million and less, the min. basic fee of public markets is:

    • 6%

    • 7%

    • 8%

    • 12%

    Correct Answer
    A. 6%
  • 20. 

    Under Design Services, the minimum basic of fee of retail stores with project construction cost P 50 Million and less is

    • 6%

    • 7%

    • 8%

    • 10%

    Correct Answer
    A. 7%
  • 21. 

    The fee of the architect for designed-build services on a guaranteed maximum cost aside from his fee for regular design services is:

    • 5%

    • 7%

    • 10%

    • 12%

    Correct Answer
    A. 10%
  • 22. 

    The fee of the architect for Design-Build Services by administration aside from his fee for the regular design services is

    • 6%

    • 7%

    • 8%

    • 10%

    Correct Answer
    A. 7%
  • 23. 

    The min. basic fee of publishing plants w/ a project construction cost of 50 million & less is

    • 6%

    • 7%

    • 8%

    • 9%

    Correct Answer
    A. 7%

Quiz Review Timeline (Updated): Jul 29, 2013 +

Our quizzes are rigorously reviewed, monitored and continuously updated by our expert board to maintain accuracy, relevance, and timeliness.

  • Current Version
  • Jul 29, 2013
    Quiz Edited by
    ProProfs Editorial Team
  • Feb 27, 2009
    Quiz Created by
    Raegab
Back to Top Back to top
Advertisement
×

Wait!
Here's an interesting quiz for you.

We have other quizzes matching your interest.