This quiz assesses knowledge on preventive maintenance reporting and responsibilities, focusing on approval processes, documentation, and maintenance timelines. It is essential for professionals in engineering and facility management to ensure operational efficiency and compliance.
True
False
Rate this question:
A nonconformance report should be generated
It should be identified with a "Do Not Use" tag until it is repaired
We should do nothing and let someone else discover the problem
Both A and B
Rate this question:
Completing all unshaded areas on the EQ Assessment Checklist and signing the form
Ensuring that any/all work instructions being used are referenced.
Ensuring that any in-house fabricated equipment has an active drawing associated with it
Ensuring that any necessary PM or calibration work instructions are written or revised, as needed
Ensuring that the equipment is not used for production while under construction
Delivering completed, signed form to Metrologist
All of the above
Rate this question:
Document activities in the PM database
Complete any required paperwork and attach it to the closed work order
Submit closed work order reports to Quality
All of the above
Rate this question:
D000989 Reporting Preventive Maintenance Work Orders in IQMS
D000986 Performing and Reporting Unscheduled Maintenance in IQMS
D000996 Submitting New Equipment into IQMS
Rate this question:
D000293 Product Validation Checklist
D000252 EQ Assessment Checklist
D000333 In-Service Training Checklist
Rate this question:
True
False
Rate this question:
The first of the month
The end of each month
Every 6 months
Whenever I get to it
Rate this question:
D000989 Reporting Preventive Maintenance Work Orders in IQMS
D000996 Submitting New Equipment into IQMS
D000986 Performing and Reporting Unscheduled Maintenance in IQMS
Rate this question:
It can be scheduled at any time by contacting the Metrologist
It will be scheduled once D000252 EQ Checklist is completed in full
It must be scheduled before the equipment is active
Rate this question:
Go to Asset Management tab, then open Maintenance, Repair, and Overhaul Work Orders icon and enter the equipment (EQ) or work order number (as long as the corresponding column is highlighted) in the search field
Check the “WO Open?” column and select the work order with the Y in that field
Right click the gray area in the bottom left field of the General tab, then select “Jump to MRO Equipment”
The work instruction will be listed in the “Documents” tab and can be opened if it is highlighted in green. If it is red, it will need to be opened through the document control (i.e. GAS) program. If there is no work instruction listed, contact a quality engineer
All of the above
Rate this question:
Quality
Operations
Engineering
Rate this question:
It should be documented on the closed work order form and entered into the database immediately
The equipment should be removed from the schedule
The equipment should be labeled "DO NOT USE" until it is repaired
Rate this question: