The editorial team at ProProfs Quizzes consists of a select group of subject experts, trivia writers, and quiz masters who have authored over 10,000 quizzes taken by more than 100 million users. This team includes our in-house seasoned quiz moderators and subject matter experts. Our editorial experts, spread across the world, are rigorously trained using our comprehensive guidelines to ensure that you receive the highest quality quizzes.
Learn about Our Editorial Process
| By Brad Squires
B
Brad Squires
Community Contributor
Quizzes Created: 36 | Total Attempts: 20,843
Questions: 10 | Attempts: 558

SettingsSettingsSettings
Ppp-04 : Setting Up Assets And PM Schedules - Quiz

Questions and Answers
  • 1. 

    What tab are Assets added to for the generation of Work Orders from a Preventive Maintenance Schedule? 

    • A.

      Asset Tab

    • B.

      Details tab

    • C.

      Procedure Tab

    • D.

      Schedule Tab

    • E.

      All of the above

    Correct Answer
    A. Asset Tab
    Explanation
    Assets are added to the Asset Tab for the generation of Work Orders from a Preventive Maintenance Schedule. This tab is specifically designed for managing and organizing assets, allowing users to input relevant information and track the maintenance activities associated with each asset. By adding assets to this tab, users can easily generate work orders based on the preventive maintenance schedule, ensuring that maintenance tasks are carried out efficiently and effectively.

    Rate this question:

  • 2. 

    What field determines the order that Work Orders will generate? 

    • A.

      Next Procedure

    • B.

      Next Scheduled

    • C.

      Parent Location

    • D.

      Route Order

    Correct Answer
    D. Route Order
    Explanation
    The field that determines the order in which Work Orders will generate is the "Route Order" field. This field specifies the sequence in which the work orders should be generated based on the desired route or order of tasks.

    Rate this question:

  • 3. 

    If a Preventive Maintenance schedule is a Meter Based Schedule, the next area you will need to fill out after setting your PM to be Meter Based is:  

    • A.

      The date that the PM will generate

    • B.

      Next scheduled Meter interval

    • C.

      It will be blank

    • D.

      Both A and B

    Correct Answer
    B. Next scheduled Meter interval
    Explanation
    After setting the Preventive Maintenance (PM) schedule to be meter-based, the next area that needs to be filled out is the next scheduled meter interval. This is because a meter-based schedule relies on the usage of a meter to determine when maintenance should be performed. Therefore, it is important to specify the next scheduled meter interval to ensure that the maintenance is carried out at the appropriate time based on the meter readings.

    Rate this question:

  • 4. 

    All Assets, whether enabled or disabled, will generate Work Orders if they are added to a Preventive Maintenance Schedule. 

    • A.

      True

    • B.

      False

    Correct Answer
    B. False
    Explanation
    The statement is false because only enabled assets will generate work orders if they are added to a preventive maintenance schedule. Disabled assets will not generate work orders.

    Rate this question:

  • 5. 

    The Repair Center filter on the PM Assets Tab is used for: 

    • A.

      Filtering Assets by Asset Parent?

    • B.

      It is not recommended to use this filter

    • C.

      Filtering Assets by Repair Center specified on PM Asset record

    • D.

      Setting Asset Defaults

    Correct Answer
    C. Filtering Assets by Repair Center specified on PM Asset record
    Explanation
    The Repair Center filter on the PM Assets Tab is used to filter assets by the repair center specified on the PM Asset record. This means that users can easily view and manage assets that are associated with a particular repair center. It is important to note that using this filter is recommended for efficient asset management.

    Rate this question:

  • 6. 

    When adding an Asset to the Asset Tab on a PM, the Asset/Location Popup window will display many organizational attributes which will be used in the PM for Work Order generation - unless?

    • A.

      They are blank

    • B.

      The data is bad

    • C.

      The PM doesn’t feel like using them

    • D.

      The Use Asset Defaults was selected for the PM

    Correct Answer
    D. The Use Asset Defaults was selected for the PM
    Explanation
    If the "Use Asset Defaults" option is selected for the PM, then the organizational attributes displayed in the Asset/Location Popup window will not be used in the PM for Work Order generation. This means that the PM will not consider these attributes and will instead use the default settings or values associated with the asset.

    Rate this question:

  • 7. 

    The Next Procedure column is most useful when the Preventive Maintenance schedule has multiple Procedures.

    • A.

      True

    • B.

      False

    Correct Answer
    A. True
    Explanation
    The Next Procedure column is most useful when the Preventive Maintenance schedule has multiple Procedures because it allows for easy tracking and organization of the sequential steps that need to be followed. This column helps ensure that each procedure is completed in the correct order and that no steps are missed. It provides a clear roadmap for technicians to follow and helps to streamline the maintenance process. Without the Next Procedure column, it would be more difficult to keep track of the order in which procedures need to be performed, leading to potential errors or inefficiencies.

    Rate this question:

  • 8. 

    When using the Use Asset Defaults option on the Asset tab of a PM, which fields are available to check off to use during generation? (Select all that apply)

    • A.

      Repair Center

    • B.

      Department

    • C.

      Customer

    • D.

      Meter Readings

    • E.

      Account

    Correct Answer(s)
    A. Repair Center
    B. Department
    C. Customer
    E. Account
    Explanation
    When using the Use Asset Defaults option on the Asset tab of a PM, the fields available to check off to use during generation are Repair Center, Department, Customer, and Account. This means that the default values for these fields will be used when generating the PM, ensuring consistency and accuracy in the generated work orders. Meter Readings is not available to check off in this case, as it is not relevant to the generation of the PM.

    Rate this question:

  • 9. 

    When updating multiple Assets on a PM using the Update feature, what will happen to the fields that are left blank? 

    • A.

      The fields will auto-update randomly

    • B.

      Fields left blank are not affected

    • C.

      This is not recommended, as it is a risky move

    • D.

      None of the above

    Correct Answer
    B. Fields left blank are not affected
    Explanation
    When updating multiple Assets on a PM using the Update feature, if fields are left blank, they will not be affected. This means that the existing values in those fields will not be changed and will remain the same.

    Rate this question:

  • 10. 

    Within the Asset tab in a PM the “Enabled?” column will indicate if the schedule is currently enabled for an individual Asset.  What will appear in red under the Asset Name and ID if the Asset is disabled? (Select all that apply)

    • A.

      Asset is disabled

    • B.

      PM is not Enabled for this Asset

    • C.

      PM will not generate for this Asset

    • D.

      Skip over this asset

    • E.

      No schedule defined

    Correct Answer(s)
    B. PM is not Enabled for this Asset
    C. PM will not generate for this Asset
    Explanation
    If the Asset is disabled, both "PM is not Enabled for this Asset" and "PM will not generate for this Asset" will appear in red under the Asset Name and ID.

    Rate this question:

Quiz Review Timeline +

Our quizzes are rigorously reviewed, monitored and continuously updated by our expert board to maintain accuracy, relevance, and timeliness.

  • Current Version
  • Mar 17, 2023
    Quiz Edited by
    ProProfs Editorial Team
  • Sep 09, 2014
    Quiz Created by
    Brad Squires
Back to Top Back to top
Advertisement