SAP S/4HANA Sourcing And Procurement Exam Prep Test

Reviewed by Editorial Team
The ProProfs editorial team is comprised of experienced subject matter experts. They've collectively created over 10,000 quizzes and lessons, serving over 100 million users. Our team includes in-house content moderators and subject matter experts, as well as a global network of rigorously trained contributors. All adhere to our comprehensive editorial guidelines, ensuring the delivery of high-quality content.
Learn about Our Editorial Process
| By Catherine Halcomb
Catherine Halcomb
Community Contributor
Quizzes Created: 1443 | Total Attempts: 6,713,877
| Attempts: 8,247 | Questions: 80
Please wait...
Question 1 / 80
0 %
0/100
Score 0/100
1. A supplier delivers material to your warehouse; however, you are only obliged to pay the supplier once you have withdrawn the stock. Which procurement process would you implement for this purpose? Please choose the correct answer.

Explanation

The correct answer is D. Consignment. Consignment is a procurement process where the supplier delivers material to the buyer's warehouse, but the buyer is only obliged to pay the supplier once they have withdrawn the stock. In this process, the supplier retains ownership of the stock until it is sold or used by the buyer. This allows the buyer to have the material on hand without having to pay for it upfront.

Submit
Please wait...
About This Quiz
SAP S/4HANA Sourcing And Procurement Exam Prep Test - Quiz

This is an eighty-questions-long preparation test for the SAP S/4HANA certification about sourcing and procurement. Are you looking towards obtaining this certification? You must clear the final exam... see morefirst, and for that, you need a solid practice session. This test will provide you with all the required knowledge.
see less

2. Your company will procure finished goods from a supplier. The supplier will manufacture the product using components shipped from your company. Which process would you use for this scenario? Please choose the correct answer.

Explanation

In this scenario, the company will be procuring finished goods from a supplier who will manufacture the product using components shipped from the company. This process is known as subcontracting, where a company outsources a part of its manufacturing process to a third-party supplier. The supplier takes responsibility for manufacturing the product using the components provided by the company. This allows the company to focus on other aspects of its business while still ensuring the production of the required goods. Therefore, the correct answer is C. Subcontracting.

Submit
3. How can you differentiate stock quantities within a plant in inventory management? Please choose the correct answer.

Explanation

In inventory management, stock quantities can be differentiated within a plant by using storage locations. Storage locations are specific areas within a plant where materials are stored. By assigning different storage locations to different stock quantities, it becomes easier to track and manage inventory within the plant. This allows for better organization and control over stock levels, ensuring that the right materials are available when needed. Bin locations refer to specific spots within a storage location, storage area refers to a larger area where multiple storage locations may be present, and shipping points are locations where goods are shipped from, which are not directly related to differentiating stock quantities within a plant.

Submit
4. You intend to procure low-value material over a period of time up to a specific amount. What type of purchasing document is best suited for this purpose? Please choose the correct answer.

Explanation

A blanket purchase order is the best suited purchasing document for procuring low-value material over a period of time up to a specific amount. It allows the buyer to establish a long-term agreement with a supplier to purchase goods or services as needed, without specifying the quantity or delivery schedule upfront. This provides flexibility and convenience in procuring materials over an extended period, while still ensuring that the total amount of procurement does not exceed a predetermined limit.

Submit
5. You are entering a supplier invoice for a purchase order that has been delivered. What information can you use as a reference to post the invoice? There are 3 correct answers to this question.

Explanation

When entering a supplier invoice for a delivered purchase order, you can use the delivery note number as a reference to post the invoice. This number confirms that the goods have been received. Additionally, you can also use the purchase order number as a reference, which identifies the specific order that the invoice relates to. Lastly, the bill of lading number can be used as a reference, as it is a document that provides details about the shipment of goods.

Submit
6. Which of the following are possible personalization's of the SAP Fiori launchpad? There are 2 correct answers to this question.

Explanation

The SAP Fiori launchpad allows for personalization in terms of selecting the design theme, which allows users to customize the visual appearance of the launchpad. Additionally, users can also personalize the language and region settings, enabling them to view the launchpad in their preferred language and adapt it to their specific region.

Submit
7. You are receiving deliveries for a valuated material. Which documents are created when you post a goods receipt? There are 2 correct answers to this question.

Explanation

When you post a goods receipt for a valuated material, two documents are created. The first document is the accounting document, which records the financial impact of the goods receipt. This document is important for tracking the cost of the material and updating the inventory value. The second document is the material document, which provides information about the goods received, such as the material number, quantity, and storage location. This document is used for inventory management and tracking the movement of materials within the organization.

Submit
8. What do you need to do if you want MRP live to create planned orders for externally procured materials? Please choose the correct answer.

Explanation

To have MRP live create planned orders for externally procured materials, you need to implement the BAdl PPH_MRP_SOURCING_BADI => SOS_DET_ADJUST. This BAdl allows for adjustments to the sourcing details, which includes the creation of planned orders for externally procured materials. Changing the procurement type of the material, setting the appropriate plant-specific material status, or setting the MRP indicator in the source list of the material to "Not relevant for planning" would not directly enable MRP live to create planned orders for externally procured materials.

Submit
9. Which lot-sizing procedures are suitable for reorder point planning? There are 3 correct answers to this question.

Explanation

The three lot-sizing procedures that are suitable for reorder point planning are replenish to maximum stock level, lot-for-lot order quantity, and fixed order quantity. Replenishing to the maximum stock level ensures that the inventory is always maintained at its maximum level, minimizing the risk of stockouts. Lot-for-lot order quantity involves ordering exactly the quantity needed to fulfill the demand, reducing excess inventory. Fixed order quantity involves ordering a predetermined quantity each time, which can help in achieving economies of scale. These procedures are specifically designed for reorder point planning and can effectively manage inventory levels.

Submit
10. In your company, the invoice verification clerks are working with the Release Blocked Invoices app. For which kind of blocked invoices can they use the automatic release function? Please choose the correct answer.

Explanation

The invoice verification clerks can use the automatic release function for invoices that are blocked due to variances. This means that if there are any discrepancies or differences between the invoice and the purchase order or goods receipt, the invoice will be blocked. The automatic release function allows the system to automatically release these blocked invoices once the variances have been resolved. This helps to streamline the invoice verification process and ensure that invoices are processed efficiently.

Submit
11. In your project, you need to make sure that consignment purchase orders utilize a different number range than other purchase orders. What must you do? Please choose the correct answer.

Explanation

To ensure that consignment purchase orders have a different number range than other purchase orders, the correct approach is to customize a new document type and assign the item category for consignment only to this type. By creating a new document type, you can define specific settings and assign the item category exclusively for consignment orders, allowing for a separate numbering system. This customization ensures that consignment purchase orders are distinct from other types of purchase orders in terms of numbering.

Submit
12. In which sequence does the system search for a valid source of supply when you manually create a purchase requisition with automatic source determination? Please choose the correct answer.

Explanation

The system searches for a valid source of supply in the following sequence when manually creating a purchase requisition with automatic source determination: Quota arrangement, Source list, Outline agreement item, and Info record.

Submit
13. In a multinational corporation there could be several company codes with several purchasing organizations. How can you minimize the effort for price condition maintenance within such a group? Please choose the correct answer.

Explanation

By using a reference purchasing organization, you can minimize the effort for price condition maintenance within a multinational corporation with multiple company codes and purchasing organizations. This means that instead of maintaining price conditions separately for each purchasing organization, you can use a reference purchasing organization to set up and maintain the price conditions. This allows for centralized management and reduces the effort required for maintaining prices across the organization.

Submit
14. Which of the following business partner roles are required to execute a procurement process? There are 2 correct answers to this question.

Explanation

To execute a procurement process, two business partner roles are required. The first role is the FI Vendor on company code level. This role is necessary to handle financial transactions and payments related to the procurement process. The second role is the Supplier on purchasing organization level. This role is responsible for providing the goods or services required for the procurement process. Both roles are essential for the smooth execution of the procurement process, ensuring proper financial management and the availability of necessary supplies or services.

Submit
15. Which of the following activities is a prerequisite to enable partner roles determination in purchasing documents?

Explanation

Assigning a partner schema to relevant purchasing document types is a prerequisite to enable partner roles determination in purchasing documents. This means that before partner roles can be determined in purchasing documents, a partner schema needs to be assigned to the relevant purchasing document types. The partner schema defines the partner functions and their determination rules for specific document types. By assigning the partner schema to the purchasing document types, the system knows which partner functions are relevant and can determine the partner roles accordingly.

Submit
16. You are entering a supplier invoice with reference to a purchase order. After verifying that the balance is zero, you decide to post the invoice. The system detects quantity differences that exceed the upper tolerance limit specified in Customizing. How does the system react? Please choose the correct answer.

Explanation

When the system detects quantity differences that exceed the upper tolerance limit specified in Customizing, it issues a message. However, despite the message, you are still able to post the invoice. However, the system automatically blocks the invoice for payment. This means that the invoice will not be processed for payment until the quantity differences are resolved or further action is taken.

Submit
17. Which organizational assignments mandatory for external procurement? Please choose the correct answer.

Explanation

The correct answer is D. Plant - Purchasing Organization. This is because the procurement process involves purchasing goods or services for a specific plant within an organization. The purchasing organization is responsible for managing the procurement activities for that plant. Therefore, the assignment of a plant to a purchasing organization is mandatory for external procurement to ensure that the correct plant is associated with the appropriate purchasing organization.

Submit
18. You have several valid purchasing info records for one specific material available in your system. Which info record will the system assign when you manually create a purchase requisition? Please choose the correct answer.

Explanation

When manually creating a purchase requisition, the system will display all the valid purchasing info records for the specific material in a list. The user will then need to manually select one from the list.

Submit
19. Which of the following occurs when you park a supplier invoice related to a purchase order? There are 2 correct answers to this question.

Explanation

When you park a supplier invoice related to a purchase order, two things occur. First, an MM invoice document is created. This document serves as a record of the invoice and contains all relevant information such as the vendor, invoice amount, and payment terms. Second, the purchase order history is updated. This update reflects the fact that an invoice has been received and parked for further processing. This allows for better tracking and management of the purchase order and invoice process.

Submit
20. What release procedure can you use to process an approval of a purchase requisition in SAP Materials Management? Please choose the correct answer.

Explanation

In SAP Materials Management, the release procedure used to process an approval of a purchase requisition can be done without classification. This means that classification is not required for the release process.

Submit
21. You are creating a purchase order for procurement of a material. Which of the following fields should you use to control the procurement process? Please choose the correct answer.

Explanation

The item category is used to control the procurement process when creating a purchase order for procurement of a material. It determines how the material will be procured, such as whether it will be purchased externally or produced internally. The item category also determines the account assignment category, which is used to determine the general ledger account to which the costs of the material will be charged. Therefore, selecting the correct item category is crucial in controlling the procurement process.

Submit
22. You want to manually post an initial entry of stock for a material in SAPS/4HAN A. You should be able to enter both a quantity and an amount. How do you proceed? There are 2 correct answers to this question.

Explanation

not-available-via-ai

Submit
23. Your MRP planning run detects a shortage of 2000 pieces of a certain material for which a quota arrangement is active. Each of your two vendors can supply only 1000 pieces at once. What must you maintain to get a procurement proposal for 1000 pieces for each supplier? There are 2 correct answers to this question.

Explanation

To get a procurement proposal for 1000 pieces for each supplier, you need to set a maximum lot size in the quota item and activate the lxindicator checkbox. This ensures that the system will not propose a quantity greater than the maximum lot size for each supplier. Additionally, you need to set a maximum quota quantity in the quota item to restrict the total quantity that can be allocated to the suppliers. This ensures that each supplier can only be allocated a maximum of 1000 pieces.

Submit
24. What controls which item categories you are allowed to use when creating new items in a purchasing document? Please choose the correct answer.

Explanation

The document type controls which item categories you are allowed to use when creating new items in a purchasing document. The document type determines the specific characteristics and settings for a particular type of purchasing document, such as a purchase order or a purchase requisition. Each document type is associated with a predefined set of item categories that can be used within that document type. Therefore, the document type plays a crucial role in determining the available item categories for creating new items in a purchasing document.

Submit
25. Which of the following are prerequisites for flexible workflows for purchase order approval? There are 3 correct answers to this question.

Explanation

To have flexible workflows for purchase order approval, the recipients for the flexible workflow need to be defined in the Manage Workflows for Purchase Orders SAP Fiori app (Option A). Additionally, the flexible workflow for purchase orders needs to be activated in customizing (Option B). Lastly, the preconditions for the flexible workflow must be set up in the Manage Workflows for Purchase Orders SAP Fiori app (Option E). These three actions are prerequisites for enabling flexible workflows for purchase order approval.

Submit
26. Which of the following actions can an end user perform with filtered report results in an SAP Fiori app? There are 3 correct answers to this question.

Explanation

End users can perform the following actions with filtered report results in an SAP Fiori app:

A. Send via e-mail: This allows the user to send the filtered report results to others via e-mail.
B. Save as a new tile on the SAP Fiori launchpad: This enables the user to save the filtered report results as a new tile on the SAP Fiori launchpad for easy access in the future.
D. Share on SAP Jam: This option allows the user to share the filtered report results on SAP Jam, a collaboration platform, with other users.

Submit
27. Goods from a supplier arrive at your warehouse. However, you do NOT want these goods to be part of your inventory yet. What is the procedure for recording the conditional goods receipt (GR)? Please choose the correct answer.

Explanation

The correct procedure for recording conditional goods receipt (GR) is to post a goods receipt to non-valuated GR blocked stock. This means that the goods will be received into a separate stock location that is not included in the inventory valuation until the conditions for accepting the delivery are met. This allows for better control and tracking of the goods before they are officially part of the inventory.

Submit
28. You would like to create purchasing info records for consumable materials without material master records. How must you proceed? Please choose the correct answer.

Explanation

not-available-via-ai

Submit
29. You have several company codes and plants in your project. You are setting the plant as valuation are a. How can you minimize the effort involved in account determination? Please choose the correct answer.

Explanation

To minimize the effort involved in account determination, you can group plants assigned to the same chart of accounts by using the valuation grouping code. This allows for easier management and organization of plants within the project, as plants with similar valuation requirements can be grouped together. By grouping plants based on the chart of accounts, you can streamline the process of determining the appropriate accounts for valuation.

Submit
30. Which of the following elements influence the G/L account determination? There are 2 correct answers to this question.

Explanation

The G/L account determination is influenced by the valuation area and the chart of accounts. The valuation area determines the accounting principle and the currency in which the valuation of assets and liabilities is carried out. The chart of accounts, on the other hand, defines the structure and organization of G/L accounts, providing a framework for recording financial transactions. Both the valuation area and the chart of accounts play a crucial role in determining the appropriate G/L account for a particular transaction.

Submit
31. Which of the following CANNOT be created by MRP Live? Please choose the correct answer.

Explanation

MRP Live is a material requirements planning (MRP) system that helps in managing and planning the production and procurement of materials. It generates planned orders, purchase requisitions, and schedule lines based on the demand and supply data. However, it does not generate an MRP list. The MRP list is a report that provides an overview of the planned orders, purchase requisitions, and schedule lines generated by the MRP system. Therefore, the correct answer is B. MRP list.

Submit
32. You want to automatically create a scheduling agreement delivery schedule. How can this be accomplished? Please choose the correct answer.

Explanation

Through material requirements planning (MRP), it is possible to automatically create a scheduling agreement delivery schedule. MRP is a system that helps in planning and managing the production and procurement of materials based on demand. By using MRP, the system can calculate the required quantities and delivery dates for the scheduling agreement, thus automatically creating the delivery schedule. This ensures that the materials are delivered in a timely manner according to the agreed-upon schedule.

Submit
33. How does SAP Fiori achieve the role-based design principle? There are 2 correct answers to this question.

Explanation

SAP Fiori achieves the role-based design principle by providing end users with all the necessary information and functions they require for their daily work, without overwhelming them with unnecessary features. This ensures that users have a streamlined and efficient experience tailored to their specific roles. Additionally, Fiori decomposes complex transactions into multiple discrete apps that are specifically designed to suit the needs of each user role, further enhancing usability and productivity.

Submit
34. Confirmed quantities and dates must be recorded in the purchase order item. Your purchasing department expects suppliers to send purchase order confirmations and shipping notifications. What do you need to configure in Customizing? Please choose the correct answer.

Explanation

In order to configure the system to record confirmed quantities and dates in the purchase order item, a confirmation control key with a sequence of two confirmation types needs to be set up in Customizing. This allows for the suppliers to send both purchase order confirmations and shipping notifications, ensuring that all relevant information is recorded and tracked.

Submit
35. What are some options when working with scheduling agreements? There are 3 correct answers to this question.

Explanation

The correct answers for this question are A, B, and D. A scheduling agreement item is always plant-specific, meaning that it is specific to a particular location or facility. A scheduling agreement can be used for a consignment process, where the supplier retains ownership of the goods until they are consumed or sold by the customer. A material master record is optional in a scheduling agreement item, allowing for flexibility in managing and tracking materials within the agreement.

Submit
36. Your purchasing organization has entered into a contractual agreement with a supplier to purchase 10000 units of a particular material. You have stored this agreement as a quantity contract. How can you prevent a release order in excess of the target quantity? Please choose the correct answer.

Explanation

In this scenario, the correct answer is B. If the order quantity exceeds the target quantity, a warning message is issued. You can set this as an error message in Customizing to prevent release. This means that if the quantity in the release order exceeds the agreed target quantity, a warning message will be displayed to inform the user. Additionally, this warning message can be customized to be treated as an error message, preventing the release of the order if the quantity exceeds the target. This ensures that the purchasing organization does not exceed the agreed-upon quantity in the contractual agreement with the supplier.

Submit
37. Supplier A should automatically be proposed as primary source for a specific material. What options do you have? There are 2 correct answers to this question.

Explanation

Option A suggests using the Regular Supplier indicator in the info record, which is a record that contains information about a specific material and its suppliers. This indicator ensures that Supplier A is automatically proposed as the primary source for the material.

Option C suggests using the source list and marking the vendor (Supplier A) as fixed. The source list is a list of approved vendors for a particular material. By marking Supplier A as fixed, it ensures that Supplier A is automatically proposed as the primary source for the material.

Both options A and C provide ways to automatically propose Supplier A as the primary source for the material, making them both correct answers.

Submit
38. You want to implement split valuation functionality. What must you do? There are 2 correct answers to this question.

Explanation

To implement split valuation functionality, two actions must be taken. First, additional material master accounting data needs to be created, which allows for the differentiation of valuation for different stock types. Second, customization of valuation categories and valuation types is required to define the criteria for splitting the valuation. These two actions together enable the system to assign different valuation types to different stock types and accurately determine the value of inventory.

Submit
39. A certain field in the material master must be maintained as a mandatory entry during initial creation. Which of the following factors influence the field selection? There are 3 correct answers to this question.

Explanation

The field selection in the material master is influenced by the material type, procurement type, and transaction code. The material type determines the specific characteristics and behavior of the material, which can impact the required fields. The procurement type determines the procurement process for the material, which can also affect the mandatory fields. The transaction code refers to the specific transaction or task being performed, and different transactions may have different field requirements. These factors collectively determine which fields must be filled in as mandatory during the initial creation of the material master.

Submit
40. In your company, invoice verification clerks post a cash discount amount using the posting net method. How do they trigger the posting method? Please choose the correct answer.

Explanation

Invoice verification clerks trigger the posting method by using an appropriate document type. The document type selected determines how the cash discount amount will be posted.

Submit
41. During reorder point planning, which time elements does the forward scheduling procedure take into account when calculating the availability date? There are 3 correct answers to this question.

Explanation

During reorder point planning, the forward scheduling procedure takes into account the planned delivery time, purchasing department processing time, and goods receipt processing time when calculating the availability date. These time elements are crucial in determining when the goods will be available for use or sale. The planned delivery time represents the time it takes for the goods to be delivered from the supplier. The purchasing department processing time includes the time required for the procurement process, such as placing the order and handling any necessary paperwork. The goods receipt processing time is the time needed to receive and inspect the goods upon arrival.

Submit
42. Which of the following elements can be generated by material requirements planning (MRP)? There are 3 correct answers to this question.

Explanation

Material requirements planning (MRP) is a system used to manage and control the production and inventory of materials needed for manufacturing. It helps in determining the quantities and timing of materials required for production. The elements that can be generated by MRP include planned orders, purchase orders, purchase requisitions, and delivery schedule lines. These elements are essential for ensuring that the right materials are available at the right time and in the right quantities to meet production requirements.

Submit
43. What are some available SAP Smart Business key performance indicators (KPIs) for contracts? There are 4 correct answers to this question.

Explanation

The available SAP Smart Business key performance indicators (KPIs) for contracts include unused contracts, contract leakage, and value contract consumption. These KPIs help track and measure the effectiveness and efficiency of contract management processes. Unused contracts indicate the number of contracts that have not been utilized, while contract leakage measures the extent of contract violations or breaches. Value contract consumption measures the amount of value or resources consumed against the contract. These KPIs provide valuable insights into contract utilization, compliance, and resource allocation.

Submit
44. You procure some materials exclusively by consignment. You want material requirements planning (MRP) to create consignment purchase requisitions assigned to a vendor, instead of normal purchase requisitions for these materials. What must you do for each of these materials? There are 2 correct answers to this question.

Explanation

For each of the materials, you must set a special procurement key/type for consignment in the material master record. This will ensure that MRP creates consignment purchase requisitions assigned to a vendor instead of normal purchase requisitions. Additionally, you need to create at least one source of supply for consignment to specify the vendor from whom the materials will be procured on consignment.

Submit
45. How can you personalize the Procurement Overview app? There are 3 correct answers to this question.

Explanation

You can personalize the Procurement Overview app by filtering the content of the cards, changing the position of the cards, and hiding an existing card. This allows you to customize the information displayed on the cards, rearrange their order, and remove unnecessary cards to suit your preferences and needs.

Submit
46. You want to set up an account determination that groups several material types on the same accounts. What must you do? Please choose the correct answer.

Explanation

To set up an account determination that groups several material types on the same accounts, you need to assign the same account category reference to the material types. This means that all the material types will be categorized under the same account category reference, allowing them to be grouped together and assigned to the same accounts for accounting purposes. This ensures consistent and streamlined account determination for the material types.

Submit
47. You have to post scrap expenses to a special account. Based on which characteristics can you influence the behaviour of the account determination? There are 2 correct answers to this question.

Explanation

The behavior of the account determination can be influenced based on the characteristics of the plant and the movement type. The plant is a key factor in determining the account to which expenses are posted, as different plants may have different expense accounts. The movement type is also important, as it determines the nature of the transaction and can impact the account determination.

Submit
48. What are some functions supported by the Create Supplier Invoice SAP Fiori app? There are 3 correct answers to this question.

Explanation

The Create Supplier Invoice SAP Fiori app supports the functions of creating an invoice for multiple purchase order references, displaying the purchase order history, and entering unplanned delivery costs. These functions allow users to efficiently manage and track invoices, purchase orders, and delivery costs within the SAP system.

Submit
49. Which information regarding contracts can you get directly from analytical SAP Fiori apps? There are 2 correct answers to this question.

Explanation

Analytical SAP Fiori apps provide direct access to information about unused contracts and expiring contracts. These apps allow users to analyze and track the status and duration of contracts, enabling them to identify contracts that are not being utilized and contracts that are nearing their expiration dates. This information can be valuable for organizations in managing their contract portfolio and ensuring optimal utilization of their contractual agreements.

Submit
50. You want to collectively convert assigned purchase requisitions into purchase orders. What functions can you use? There are 3 correct answers to this question.

Explanation

not-available-via-ai

Submit
51. An incoming invoice shows a variance when compared to the expected quantity or amount. How can you create this invoice? There are 2 correct answers to this question.

Explanation

The correct answers for this question are C and D. Option C states that entering the actual invoice values and posting will create an invoice with the actual values and possibly block it for payment. Option D states that entering the actual invoice values, using the reduction function, and posting will create a credit memo in addition to the actual invoice. Both options provide methods for creating the invoice with the correct values and potentially addressing any variances that may exist.

Submit
52. What are some key features of the goods-receipt-based (GR-based) invoice verification? There are 3 correct answers to this question.

Explanation

The key features of the goods-receipt-based (GR-based) invoice verification are that each invoice item is assigned to a goods receipt item, the indicator for GR-based invoice verification is set in the purchase order item as a prerequisite, and a goods receipt must be posted prior to the invoice. This means that the system ensures that each invoice item is linked to a corresponding goods receipt item, the purchase order item is flagged for GR-based invoice verification, and the goods receipt is recorded before the invoice can be processed.

Submit
53. What happens when you post a valuated goods receipt for a purchase order item with a material master record and account assignment K (Cost Center) in SAP Materials Management? Please choose the correct answer.

Explanation

When you post a valuated goods receipt for a purchase order item with a material master record and account assignment K (Cost Center) in SAP Materials Management, the correct answer is B. The system debits the consumption account specified in the purchase order. This means that the system will record the cost of the material as an expense in the specified consumption account, reflecting the consumption of the material for the cost center. This helps in tracking the cost of materials used for specific cost centers. The other options are not applicable in this scenario.

Submit
54. In the standard system, a controllable system message is shown when a user creates a purchase order with a delivery date in the past. What must you configure to allow such purchase orders to only be issued by authorized users? Please choose the correct answer.

Explanation



This would ensure that non-authorized users cannot issue the purchase orders without resolving the error first, while authorized users would either use a different message version that is not an error or would not have the error message set up at all, allowing them to issue the order.
Submit
55. You test the various options that SAP S/4HANA offers for stock transfers between two different plants within the same company code. Which special features do stock transport orders have? There are 2 correct answers to this question.

Explanation

The material on the road is managed in the stock in transit of the receiving plant.

This is correct. In SAP S/4HANA, when stock is transferred between plants using a stock transport order, the stock is managed as "stock in transit" at the receiving plant until it is received. This allows the receiving plant to track goods that have been dispatched by the supplying plant but have not yet arrived.



If necessary, you can post the goods receipt to blocked stock in the receiving plant.

This is correct. SAP S/4HANA allows the receiving plant to post goods directly to blocked stock upon receipt. This can be necessary if the goods need to be inspected or if there is some uncertainty about their quality or compliance with specifications, requiring that they be isolated from available inventory until cleared.

Submit
56. Which of the following tasks does the system perform during reorder point planning? There are 3 correct answers to this question.

Explanation

During reorder point planning, the system performs the following tasks:
A. It recalculates the replenishment lead time for materials with automatic reorder point planning. This ensures that the system has the most up-to-date lead time information for each material.
B. It carries out a net requirement calculation for every material included in the planning run. This calculation determines the difference between the required quantity and the available quantity for each material.
C. It carries out a lot-size calculation for every material with net requirements. This calculation determines the optimal lot size for each material based on factors such as order costs and carrying costs.

Submit
57. What does the material type influence in the material master in SAP Materials Management? There are 2 correct answers to this question.

Explanation

The material type in the material master in SAP Materials Management influences the procurement type and the quantity and value update. The procurement type determines how the material is procured, whether it is purchased externally or produced internally. The quantity and value update determines how the system updates the inventory quantities and values when transactions occur with the material.

Submit
58. Which of the following parameters should you consider when calculating there order point for a material? There are 3 correct answers to this question.

Explanation

When calculating the order point for a material, there are several parameters that should be considered. The lot-sizing procedure is important because it determines the quantity to be ordered each time. Safety stock is also crucial as it acts as a buffer to protect against unexpected demand fluctuations or delays in replenishment. Replenishment lead time is another important factor as it represents the time it takes for a new order to be delivered. Considering these parameters ensures that the order point is accurately calculated to maintain sufficient inventory levels and avoid stockouts.

Submit
59. With which field do you control the creation of a scheduling agreement with release documentation? Please choose the correct answer.

Explanation

The correct answer is D. Release Creation Profile. The release creation profile is used to control the creation of a scheduling agreement with release documentation. It determines the release strategy, release creation time, and release creation period for the scheduling agreement. By selecting the appropriate release creation profile, the user can ensure that the scheduling agreement is created and released according to the desired criteria and requirements.

Submit
60. What information can the analytical Purchasing Group Activity SAP Fiori app provide? There are 2 correct answers to this question.

Explanation

The analytical Purchasing Group Activity SAP Fiori app can provide information on the net purchased value per purchasing group and month for the current year, as well as the number of contracts created by a purchasing group since the beginning of the current year. This app allows users to analyze and track purchasing activities, including financial data and contract creation, to gain insights into purchasing group performance and trends.

Submit
61. Your project uses product costing and production planning functionality. Which valuation area must be used? Please choose the correct answer.

Explanation



In SAP, when your project involves product costing and production planning functionality, the valuation area must be set at the plant level. This setup is essential because it allows for detailed and specific valuation of inventory and cost of goods manufactured within each plant. The plant level valuation enables accurate tracking and management of costs related to production activities, material valuations, and overall inventory management within each specific plant. This granularity is crucial for effective production planning and product costing.
Submit
62. Which of the following are features of the Delivery Completed indicator in a purchase order (PO) item? There are 2 correct answers to this question.

Explanation

The first correct answer states that if the Delivery Completed indicator is set, the purchase order item is no longer relevant for material requirements planning. This means that the system will not consider this item when calculating future material requirements.

The second correct answer states that the indicator is always set automatically if the quantity received is within the under delivery tolerance. This means that if the received quantity is less than the ordered quantity but within the allowed tolerance, the indicator will be automatically set to indicate that the delivery is completed.

These features of the Delivery Completed indicator help to streamline the purchasing process and ensure accurate material planning.

Submit
63. You convert a purchase requisition to a purchase order. What can you assign to the purchase requisition to be used as a source of supply in SAP Materials Management? There are 2 correct answers to this question.

Explanation

In SAP Materials Management, when converting a purchase requisition to a purchase order, you can assign a contract as a source of supply. A contract is a legally binding agreement between a company and a vendor that outlines the terms and conditions of the procurement. Additionally, an info record can also be assigned as a source of supply. An info record contains information about a vendor's pricing, delivery conditions, and other relevant details, which can be used as a reference during procurement.

Submit
64. When the procurement process is without a material master in SAP Materials Management, which configuration element do you assign to the valuation class? Please choose the correct answer.

Explanation

In SAP Materials Management, when the procurement process is without a material master, the configuration element that is assigned to the valuation class is the material group. The material group is a classification of materials based on certain characteristics, such as their properties or usage. By assigning the valuation class to the material group, it allows for proper valuation and categorization of materials during the procurement process.

Submit
65. Where do posting with automatic account determination occur in SAP Materials Management? Please choose the correct answer.

Explanation





In SAP Materials Management, postings with automatic account determination occur in inventory management. This is where goods movements such as goods receipts, goods issues, and stock transfers are automatically recorded in the accounts specified in the configuration. The system determines the correct general ledger accounts based on the configuration settings associated with the material type, plant, and movement type involved in the transaction. This automatic account determination ensures that all inventory transactions are accurately reflected in financial accounting without manual intervention.
Submit
66. When using a classic release procedure, for which of the following documents must you use classification? There are 2 correct answers to this question.

Explanation

Purchase Requisitions - When setting up release procedures for purchase requisitions, the classification system is used to apply different release strategies based on various attributes like the value of the requisition, the material type, or the department requesting the purchase. This allows for a controlled, hierarchical approval process based on predefined criteria.

Purchase Orders - Similar to purchase requisitions, purchase orders can be managed using a classification-based release strategy. In this setup, characteristics such as order value, material group, or vendor can define the release conditions, ensuring that purchase orders undergo a requisite approval process before they can be executed.

Submit
67. You are posting a goods receipt without a corresponding purchase order (PO) in the system. Which of the following are prerequisites for automatic generation of the PO at the time of goods receipt? There are 2 correct answers to this question.

Explanation

The prerequisites for automatic generation of the PO at the time of goods receipt are that the delivered material is a valuated stock material and that automatic purchase order generation is activated for the movement type in Customizing.

Submit
68. You regularly purchase non-stock materials. What must you set up to allow the system to automatically propose specific accounts? Please choose the correct answer.

Explanation

To allow the system to automatically propose specific accounts for non-stock materials, you need to assign transaction keys to the account assignment categories. This means that each account assignment category will be associated with a specific transaction key, which will determine the account to be used for posting the transaction. This ensures that the correct accounts are automatically proposed based on the account assignment category assigned to the non-stock material.

Submit
69. What are some key features of the SAP Smart Business key performance indicators (KPIs) tiles used for purchasing analytics? There are 2 correct answers to this question.

Explanation

not-available-via-ai

Submit
70. Your purchasing department wants to monitor overdue purchase orders. What are the prerequisites for issuing delivery reminders for a purchase order? There are 3 correct answers to this question.

Explanation

The prerequisites for issuing delivery reminders for a purchase order are to maintain reminder periods in the purchase order item, maintain purchasing value keys in the purchase order item, and set message determination in Customizing and maintain message records. These steps ensure that the system has the necessary information to generate delivery reminders for overdue purchase orders.

Submit
71. You send newly created purchase orders to a supplier via email, whereas quantity or price changes are to be transmitted by fax. What prerequisites must be met? There are 3 correct answers to this question.

Explanation

The prerequisites that must be met are as follows:
B. The Exclusive indicator must be flagged in the access sequence. This ensures that when a purchase order is sent via fax, any changes to the quantity or price are not also sent via email.
C. The New Message Determination Process for Change Messages indicator must be flagged in Customizing. This allows for a separate message determination process for change messages, ensuring that any changes to the quantity or price are transmitted via fax.
D. The Price and Quantity fields must be relevant for printout changes. This means that any changes to these fields will trigger a printout, which will be sent via fax.

Submit
72. Which of the following prerequisites must be met for the system to check the shelf life of materials at goods receipt? There are 3 correct answers to this question.

Explanation

The system checks the shelf life of materials at goods receipt if the following prerequisites are met:
1) The material is managed in batches in the plant. This means that the material is assigned a batch number, which includes information about its production and expiration date.
2) The shelf life expiration date check is activated for the plant in Customizing. This means that the system is configured to perform a check on the expiration date of the material at goods receipt.
3) The shelf life expiration date check is activated for the movement type in Customizing. This means that the system is configured to perform a check on the expiration date of the material for the specific movement type used during goods receipt.

Submit
73. At which of the following organizational levels must you maintain a business partner master record for a supplier? There are 3 correct answers to this question.

Explanation



In systems like SAP, supplier master records are maintained at the Company Code for financial transactions, Purchasing Organization for procurement activities, and Client for overarching data applicable across the enterprise. Plant and Purchasing Group levels don't hold master records but rather transactional or operational data related to procurement.
Submit
74. At what level do you maintain the purchasing group in the material master? Please choose the correct answer.

Explanation



In the context of an SAP system, the purchasing group is maintained at the level of the purchasing organization. The purchasing group is responsible for procurement activities and is often linked to a specific purchasing organization, which in turn is associated with one or more plants but operates at a level that can span multiple company codes or plants within the SAP structure.
Submit
75. How does the system derive the company code when you post a goods movement in a plant? Please choose the correct answer.

Explanation



In SAP ERP, a plant can exist multiple times in a client, but it is associated with only one company code. The company code is a key organizational unit in SAP that represents a legal entity for which financial statements are created. Therefore, goods movements within a plant are assigned to the company code associated with that specific plant.
Submit
76. Which of the following are features of the Delivery Completed indicator in a purchase order (PO) item? There are 2 correct answers to this question.

Explanation

The Delivery Completed indicator in a purchase order (PO) item has two features. First, the indicator is always set automatically if the quantity received is within the under delivery tolerance. This means that if the received quantity is less than the ordered quantity but within the allowed tolerance, the indicator will be set automatically. Second, if the indicator is manually set, the PO item will no longer be relevant for material requirements planning. This means that the item will not be considered in future planning calculations.

Submit
77. Your purchasing department is working with scheduling agreements. What can you do using release creation profiles? There are 3 correct answers to this question.

Explanation

Release creation profiles are used in scheduling agreements to define the release strategy for purchasing documents. Option A is correct because plant-specific release creation profiles can be created in Customizing to define the release strategy for specific plants. Option B is correct because a release creation profile can be entered in the vendor master data to determine the release strategy for a specific vendor. Option C is correct because a release creation profile can also be entered in the material master data to determine the release strategy for a specific material. Option D is incorrect as it is not mentioned in the question.

Submit
78. Which options are available for the automatic posting of unplanned delivery costs when creating an invoice with purchase order reference? There are 2 correct answers to this question.

Explanation

In SAP ERP, the system allows you to set up account determination rules to specify which G/L accounts should be used for posting unplanned delivery costs. These accounts are defined in the account determination table.

Unplanned delivery costs can be distributed among different items on the invoice based on various factors such as quantity or value. This ensures a fair allocation of costs to relevant items.

Submit
79. You want to prevent a specific material from being ordered from a specific vendor. What must you do? Please choose the correct answer.

Explanation

To prevent a specific material from being ordered from a specific vendor, you need to create a blocking entry in the vendor master data. This means that you add a restriction or block to the vendor's information in the system, specifying that they are not allowed to supply the specific material. By doing this, the system will not allow any purchase orders to be created for that material from that particular vendor.

Submit
80. Which of the following is NOT a key step in the procurement process?

Explanation

Delivering products to end customers is typically the responsibility of the sales and distribution functions, not the procurement function. Procurement focuses on acquiring goods and services from suppliers, not delivering them to customers.

Submit
View My Results

Quiz Review Timeline (Updated): Dec 13, 2024 +

Our quizzes are rigorously reviewed, monitored and continuously updated by our expert board to maintain accuracy, relevance, and timeliness.

  • Current Version
  • Dec 13, 2024
    Quiz Edited by
    ProProfs Editorial Team
  • Feb 05, 2021
    Quiz Created by
    Catherine Halcomb
Cancel
  • All
    All (80)
  • Unanswered
    Unanswered ()
  • Answered
    Answered ()
A supplier delivers material to your warehouse; however, you are only...
Your company will procure finished goods from a supplier. The supplier...
How can you differentiate stock quantities within a plant in inventory...
You intend to procure low-value material over a period of time up to a...
You are entering a supplier invoice for a purchase order that has been...
Which of the following are possible personalization's of the SAP...
You are receiving deliveries for a valuated material. Which documents...
What do you need to do if you want MRP live to create planned orders...
Which lot-sizing procedures are suitable for reorder point planning? ...
In your company, the invoice verification clerks are working with the...
In your project, you need to make sure that consignment purchase...
In which sequence does the system search for a valid source of supply...
In a multinational corporation there could be several company codes...
Which of the following business partner roles are required to execute...
Which of the following activities is a prerequisite to enable partner...
You are entering a supplier invoice with reference to a purchase...
Which organizational assignments mandatory for external procurement? ...
You have several valid purchasing info records for one specific...
Which of the following occurs when you park a supplier invoice related...
What release procedure can you use to process an approval of a...
You are creating a purchase order for procurement of a material. Which...
You want to manually post an initial entry of stock for a material in...
Your MRP planning run detects a shortage of 2000 pieces of a certain...
What controls which item categories you are allowed to use when...
Which of the following are prerequisites for flexible workflows for...
Which of the following actions can an end user perform with filtered...
Goods from a supplier arrive at your warehouse. However, you do NOT...
You would like to create purchasing info records for consumable...
You have several company codes and plants in your project. You are...
Which of the following elements influence the G/L account...
Which of the following CANNOT be created by MRP Live? Please choose...
You want to automatically create a scheduling agreement delivery...
How does SAP Fiori achieve the role-based design principle? ...
Confirmed quantities and dates must be recorded in the purchase order...
What are some options when working with scheduling agreements? ...
Your purchasing organization has entered into a contractual agreement...
Supplier A should automatically be proposed as primary source for a...
You want to implement split valuation functionality. What must you...
A certain field in the material master must be maintained as a...
In your company, invoice verification clerks post a cash discount...
During reorder point planning, which time elements does the forward...
Which of the following elements can be generated by material...
What are some available SAP Smart Business key performance indicators...
You procure some materials exclusively by consignment. You want...
How can you personalize the Procurement Overview app? ...
You want to set up an account determination that groups several...
You have to post scrap expenses to a special account. Based on which...
What are some functions supported by the Create Supplier Invoice SAP...
Which information regarding contracts can you get directly from...
You want to collectively convert assigned purchase requisitions into...
An incoming invoice shows a variance when compared to the expected...
What are some key features of the goods-receipt-based (GR-based)...
What happens when you post a valuated goods receipt for a purchase...
In the standard system, a controllable system message is shown when a...
You test the various options that SAP S/4HANA offers for stock...
Which of the following tasks does the system perform during reorder...
What does the material type influence in the material master in SAP...
Which of the following parameters should you consider when calculating...
With which field do you control the creation of a scheduling agreement...
What information can the analytical Purchasing Group Activity SAP...
Your project uses product costing and production planning...
Which of the following are features of the Delivery Completed...
You convert a purchase requisition to a purchase order. What can you...
When the procurement process is without a material master in SAP...
Where do posting with automatic account determination occur in SAP...
When using a classic release procedure, for which of the following...
You are posting a goods receipt without a corresponding purchase order...
You regularly purchase non-stock materials. What must you set up to...
What are some key features of the SAP Smart Business key performance...
Your purchasing department wants to monitor overdue purchase orders....
You send newly created purchase orders to a supplier via email,...
Which of the following prerequisites must be met for the system to...
At which of the following organizational levels must you maintain a...
At what level do you maintain the purchasing group in the material...
How does the system derive the company code when you post a goods...
Which of the following are features of the Delivery Completed...
Your purchasing department is working with scheduling agreements. What...
Which options are available for the automatic posting of unplanned...
You want to prevent a specific material from being ordered from a...
Which of the following is NOT a key step in the procurement process?
Alert!

Advertisement