The ProProfs editorial team is comprised of experienced subject matter experts. They've collectively created over 10,000 quizzes and lessons, serving over 100 million users. Our team includes in-house content moderators and subject matter experts, as well as a global network of rigorously trained contributors. All adhere to our comprehensive editorial guidelines, ensuring the delivery of high-quality content.
Learn about Our Editorial Process
| By Joseph Hartman
J
Joseph Hartman
Community Contributor
Quizzes Created: 8 | Total Attempts: 4,514
| Attempts: 191 | Questions: 10
Please wait...
Question 1 / 10
0 %
0/100
Score 0/100
1. True or False?  If a meter reading is entered into a work order incorrectly, the RMS can remedy the entry.

Explanation

If a meter reading is entered into a work order incorrectly, the RMS (Remote Monitoring System) can remedy the entry. This means that if a mistake is made while entering the meter reading, the RMS system has the capability to correct the error and ensure that the accurate reading is recorded.

Submit
Please wait...
About This Quiz
Operations Management Quizzes & Trivia

This quiz provides an overview of Condition-Based Monitoring (CBM), focusing on the roles in setting asset meter limits, creating and linking meters in RigMax, and entering meter readings.... see moreIt tests knowledge crucial for maintenance professionals to ensure efficient asset management and operational reliability. see less

2. Where do Crafts enter meter readings?

Explanation

Crafts enter meter readings in a work order, specifically on the Actuals tab. This is where they can record the actual readings of meters or gauges related to the work being performed. This information is important for tracking the usage and performance of assets, as well as for maintenance planning and scheduling. By entering the meter readings on the Actuals tab of a work order, crafts ensure that accurate data is captured and can be used for analysis and decision-making purposes.

Submit
3. What happens when an action is out of tolerance?

Explanation

When an action is out of tolerance, a Corrective Maintenance (CM) work order is created. This means that there is a deviation from the standard or acceptable range of performance, and immediate action is required to fix the issue. The CM work order ensures that the necessary repairs or adjustments are carried out to bring the action back within the acceptable tolerance levels. This helps to maintain the efficiency and reliability of the system or equipment.

Submit
4. Which report shows all meter readings for an asset?

Explanation

The Asset Measurement History Report is the correct answer because it provides a comprehensive overview of all meter readings for a specific asset. This report allows users to track and analyze the historical data of meter readings, providing valuable insights into the performance and maintenance needs of the asset over time. It is a useful tool for asset management and decision-making processes.

Submit
5. Who creates meters in RigMax?

Explanation

The Corporate PM Administrator is responsible for creating meters in RigMax. They have the authority and knowledge to set up and manage the meters effectively. The other options, such as the Corporate Maintenance Manager, Corporate Maintenance SMEs, and RMSs, may have different roles and responsibilities within the organization, but creating meters is not specifically mentioned as part of their duties.

Submit
6. Who determines asset meter upper and lower limits?

Explanation

Corporate Maintenance SMEs determine asset meter upper and lower limits. These individuals have expertise in maintenance and are responsible for managing and maintaining assets within an organization. They have the knowledge and experience to determine the appropriate upper and lower limits for asset meters, ensuring that they are set at levels that optimize performance and prevent any potential damage or failures. Their role is crucial in ensuring that assets are effectively monitored and maintained, maximizing their lifespan and minimizing downtime.

Submit
7. What are the two (2) meter limit types?

Explanation

The correct answer is Warning and Action. This is because warning and action are two types of limit types that can be used to communicate a specific message or response. Warning limits are set to indicate that a certain condition is approaching a critical level and action may be required to prevent further issues or consequences. Action limits, on the other hand, indicate that a specific action must be taken immediately to address a critical situation. These limit types are commonly used in various contexts such as safety protocols, system monitoring, and risk management.

Submit
8. Who receives an e-mail if an action is out of tolerance? (choose two (2) answers that apply)

Explanation

Corporate Maintenance and RMS receive an email if an action is out of tolerance. Corporate Maintenance is responsible for maintaining the overall operations and maintenance of the company, so they need to be notified if there is an action that is not within the acceptable limits. RMS, which stands for Risk Management System, is also involved in monitoring and managing risks within the company, so they need to be informed if there is an action that is out of tolerance.

Submit
9. What is the best way to see all work order tasks that require meter reading entries?

Explanation

To see all work order tasks that require meter reading entries, the best way is to click twice on the Measure Point heading in the Actuals tab. This action will sort the tasks based on the Measure Point, allowing the user to easily identify and access the tasks that require meter reading entries.

Submit
10. Once meters are created, how are they linked to work orders?

Explanation

Meters are linked to work orders by assigning them to the job plan task. This means that the meter is associated with a specific task within the job plan, allowing for accurate tracking and measurement of the work being performed. This helps in monitoring and maintaining the equipment or assets associated with the work order.

Submit
View My Results

Quiz Review Timeline (Updated): Mar 20, 2023 +

Our quizzes are rigorously reviewed, monitored and continuously updated by our expert board to maintain accuracy, relevance, and timeliness.

  • Current Version
  • Mar 20, 2023
    Quiz Edited by
    ProProfs Editorial Team
  • May 08, 2014
    Quiz Created by
    Joseph Hartman
Cancel
  • All
    All (10)
  • Unanswered
    Unanswered ()
  • Answered
    Answered ()
True or False?  If a meter reading is entered into a work order...
Where do Crafts enter meter readings?
What happens when an action is out of tolerance?
Which report shows all meter readings for an asset?
Who creates meters in RigMax?
Who determines asset meter upper and lower limits?
What are the two (2) meter limit types?
Who receives an e-mail if an action is out of tolerance? (choose two...
What is the best way to see all work order tasks that require meter...
Once meters are created, how are they linked to work orders?
Alert!

Advertisement