1.
Complete the sentence:I contribute to quality by...
2.
Who works in the QA team in Asker?Select all:
Correct Answer(s)
B. Frøken Avvik
D. Miss Lloyd
E. Dr Darling
Explanation
The individuals who work in the QA team in Asker are Frøken Avvik, Miss Lloyd, and Dr Darling.
3.
What is the Business Process Model (BPM)?Select one:
Correct Answer
B. The way of working for Wärtsilä Gas Solutions
4.
What is a non-conformity?Select one:
Correct Answer
C. A deviation from a specified requirement
Explanation
A non-conformity refers to a deviation from a specified requirement. It means that something does not meet the expected standards or criteria that were set. This could be in terms of product quality, process efficiency, or any other defined requirement. Non-conformities are typically identified during quality control processes and are considered areas for improvement, as they highlight the need for corrective actions to bring the project or product back in line with the desired specifications.
5.
Which of the following activities can QA support?Select all:
Correct Answer(s)
B. Lessons Learnt session in projects
C. Risk Assessment sessions
D. Milestone audit planning
F. Auditing of suppliers
G. Problem solving (root cause analysis)
Explanation
QA (Quality Assurance) can support various activities to ensure the quality of products or processes. These activities include reviewing engineering documentation to identify any quality issues or improvements, conducting lessons learned sessions in projects to identify areas for improvement, participating in risk assessment sessions to mitigate potential risks, planning milestone audits to evaluate the progress and compliance of a project, auditing suppliers to ensure they meet quality standards, and problem-solving through root cause analysis to identify and address the underlying causes of quality issues.
6.
In which engineering phase are Design most involved?Select one:
Correct Answer
E. Area engineering
Explanation
Area engineering is the correct answer because it refers to the phase in engineering where the design is most involved. This phase focuses on the specific area or discipline of engineering and involves detailed design and analysis of the components or systems within that area. It includes activities such as creating drawings, selecting materials, and ensuring that the design meets all the requirements and standards.
7.
How many supplier audits have QA carried out until now in 2015 ?Select one:
Correct Answer
D. 15-20
Explanation
QA has carried out 15-20 supplier audits until now in 2015.
8.
Where should a project document their Lessons Learnt?Select one:
Correct Answer
C. Using the Lessons Learnt tool on Compass
Explanation
Projects should document their Lessons Learnt using the Lessons Learnt tool on Compass. This tool is specifically designed to capture and organize the knowledge gained from the project, allowing team members to easily access and learn from past experiences. By using this tool, project teams can ensure that valuable insights and best practices are documented and shared, improving future project performance and avoiding the repetition of mistakes.
9.
The Business Process Model contains templates for:Select all:
Correct Answer(s)
A. Change Control register
B. Variation Order request
C. Supplier Assessment Questionnaire
D. Supplier Bid Evaluation form
F. Project handover to claims report
Explanation
The Business Process Model contains templates for various processes and tasks related to the business. These templates include the Change Control register, which helps in managing and tracking changes within the organization. The Variation Order request template is used to request changes to a project or process. The Supplier Assessment Questionnaire template is used to assess and evaluate potential suppliers. The Supplier Bid Evaluation form is used to evaluate and compare bids from different suppliers. Lastly, the Project handover to claims report template is used to document the handover of a project to the claims department.
10.
The NCR database can be used to logSelect all
Correct Answer
A. Opportunities for improvement
Explanation
The NCR database can be used to log opportunities for improvement. This means that whenever there is a chance to enhance or make something better, it can be recorded in this database. By logging these opportunities, organizations can keep track of areas that need improvement and take appropriate actions to address them. This helps in identifying and rectifying any weaknesses or inefficiencies in processes, products, or services, leading to overall improvement and better performance.
11.
What is the first step in the Expediting processSelect one:
Correct Answer
D. Criticality rating of equipment
Explanation
The first step in the Expediting process is to determine the criticality rating of equipment. This involves evaluating the importance and urgency of each piece of equipment in order to prioritize the expediting efforts. By assessing the criticality rating, the team can identify which equipment needs to be expedited first and allocate resources accordingly. This step is crucial in ensuring that the most critical equipment is given priority and expedited in a timely manner.
12.
Where should a project document their risk assessment?
Correct Answer
B. In the QuickBase risk assessment tool
Explanation
The project should document their risk assessment in the QuickBase risk assessment tool. This tool is specifically designed for managing and tracking project risks. It allows the project team to identify, analyze, and prioritize risks, as well as track mitigation strategies and monitor their progress. By documenting the risk assessment in this tool, the project team can easily access and update the information, ensuring that it is consistently and accurately recorded. This also enables effective communication and collaboration among team members, enhancing the overall risk management process.