Sankriya : The Operations and General Management Club, Indian Institute of Management Ranchi (IIM Ranchi), is organizing "Crack the Case" in association with CarDekho. Com for its annual management fest - "AGON"The first round of the event is an online quiz. Please be informed that this round is an elimination round and teams selected from this round would proceed See moreto the next round which is a "Live Case Study" round.
There are 30 questions to be answered in 25 minutes.
In Case of a tie in marks, the teams who submit the answers first would be taken into consideration.
Please note that only one submission per team is allowed. Multiple submission from same team would lead to disqualification from the event. All the best !
2-3-1 on both machines
3-1-2 on both machines
1-3-2 on machine 1 and 3-2-1 on machine
3-2-1 on both machines
91.67 %
95 %
96 %
None of the above
Rate this question:
Work breakdown structure
Organizational breakdown structure
Product breakdown structure
Responsibility assignment structure
Rate this question:
C & E matrix
Capability maturity model
3G’s method
Process improvement analysis
Rate this question:
Pareto optimum
Nest equilibrium
Nash equilibrium
Stackelberg equilibrium
Rate this question:
Assemble to order
Available to promise
Available to engineer
Engineered to order
Rate this question:
Xbar chart
Xbar-R chart
Xbar-S chart
None of the above
Rate this question:
Operational Control decisions
Strategic Plannnig Decisions
Management Control decisions
Management Information decisions
Rate this question:
Third-party logistics (3PL)
Trade organization
Fourth party logistics
Independent agent
Rate this question:
Stuttgart
Modena
London
Michigan
Rate this question:
47.9
48.6
51.3
50.7
Rate this question:
Rate this question:
L- Shape
U- Shape
Comb Arrangement
Straight Line
Rate this question:
18,000 units
19,000 units
20,000 units
22,000 units
Rate this question:
3
4
5
6
Rate this question:
Rate this question:
There is usually a single source of supply for a given part in nearby geographical area with long term contract
Purchasing is carried out in small lots with frequent deliveries
Suppliers can be innovative in design specifications
A certain percentage of rejects from a supplier is acceptable
Rate this question:
Mean Square Error
Mean Forecast Error
Mean Absolute Deviation
Mean Absolute Percentage Error
Rate this question:
Batch assembly
Just in time
Mixed model assembly
Bulk assembly
Rate this question:
Critical path forecasting
Delphi forecasting
Collaborative planning forecasting and replenishment
Box-Jenkins forecasting
Rate this question:
Rate this question:
0.1
0.3
0.15
0.2
Rate this question:
65 %
66.67 %
70 %
75 %
Rate this question:
Product focused
Process focused
Job-shop
Intermittent system
Rate this question:
Time based management
Management by objectives
Continuous improvement
Just in time stock control
Rate this question:
A—D—C is the critical path
A—B—C has the most slack
The expected duration of the project is 25 days
The expected duration of this project is 60 days
Rate this question:
Arrivals and departures
Arrivals and idleness
Waiting customers and capacity
Equipment breakdowns and departures
Rate this question:
Kano
Perpetual mapping
GRPI
Fishbone diagram
Rate this question:
IMR
C-Chart
P-Chart
U-chart
Rate this question: