Change Control Signature Responsibilities

6 Questions | Total Attempts: 292

SettingsSettingsSettings
Change Control Signature Responsibilities - Quiz

These questions test the knowledge of LSI's Change Control Signature Responsibilities (D000136).


Questions and Answers
  • 1. 
    What is the definition of Owning Department?
    • A. 

      The department of the Originator of the DCR

    • B. 

      The primary user of the document

    • C. 

      The owning department is always Quality

    • D. 

      The department of the person who wrote the document

  • 2. 
    To help ensure that collaborations are effective, Collaboration tasks should be assigned to all approvers of a DCR. Who would you assign as collaborators for a DCR that contained the Document Type: Fabrication BOM used in the Elegant Elite family. Select all that apply.
    • A. 

      Process Quality Engineer (D. Callahan)

    • B. 

      Surgical Device Engineering Team (G. Aldrich)

    • C. 

      Process Quality Engineer (P. Langworthy)

    • D. 

      Production Engineering (T. Beer)

    • E. 

      Materials (S. Faulkner)

    • F. 

      Cost Accounting (B. McKenty)

    • G. 

      ERP System (G. Metz)

    • H. 

      Production Engineer (P. Wethey)

    • I. 

      Fabrication (W. Halfman)

  • 3. 
    To help ensure that collaborations are effective, Collaboration tasks should be assigned to all approvers of a DCR. Who would you assign as collaborators for a DCR that contained the Document Type: Work Instructions-Assembly used in the Cleaning Lab. Select all that apply.
    • A. 

      Training (M. Melendez)

    • B. 

      Clean Lab (C. Owens)

    • C. 

      Process Quality Engineer (D. Callahan)

    • D. 

      Production (D. Kinsella)

  • 4. 
    To help ensure that collaborations are effective, Collaboration tasks should be assigned to all approvers of a DCR. Who would you assign as collaborators for a DCR that contained the Document Type: Design Report used in the Sewing family. Select all that apply.
    • A. 

      Independent Reviewer (Found on Project Charter)

    • B. 

      Development Group (J. Guelzow)

    • C. 

      Discovery (A. Martellaro)

    • D. 

      Intellectual Property (C. Miller)

    • E. 

      Operations (J. Nicosia)

    • F. 

      Design Quality Engineering (D, Derleth)

    • G. 

      Product Development (Z. Tyo)

    • H. 

      Quality Engineering (D. Fenton)

    • I. 

      Regulatory Affairs

    • J. 

      Engineering (R. Zitzka)

  • 5. 
    To help ensure that collaborations are effective, Collaboration tasks should be assigned to all approvers of a DCR. Who would you assign as collaborators for a DCR that contained the Document Type: Artwork-Labels, Drawing-General and BOM used in Molding for Sewing family. Select all that apply.
    • A. 

      Growth Group (B. Bartz)

    • B. 

      Development Group (J. Guelzow)

    • C. 

      Art (A. Ryan)

    • D. 

      Regulatory Affairs

    • E. 

      Marketing (B. Keller)

    • F. 

      Materials (S. Faulkner)

    • G. 

      Surgical Device Engineering Team (S. Scheuermann)

    • H. 

      Surgical Device Engineering Team (G. Aldrich

    • I. 

      Fabrication (W. Halfman)

    • J. 

      Cost Accounting (B. McKenty)

    • K. 

      Production Engineering (V. Sauer)

    • L. 

      Molding (E. Sutorious)

    • M. 

      Measurement Systems (J. Murray)

    • N. 

      Intellectual Property (C. Miller)

    • O. 

      ERP System (G. Metz)

    • P. 

      Process Quality Engineer (P. Langworthy)

  • 6. 
     To help ensure that collaborations are effective, Collaboration tasks should be assigned to all approvers of a DCR. Who would you assign as collaborators for a DCR that contained the Document Type: Work Instructions-Assembly used in the Cleanroom in the Knot Tying family and BOM used in Cleanroom. Select all that apply.
    • A. 

      Owning Department (Production, D. Kinsella)

    • B. 

      Training Management (M. Melendez)

    • C. 

      Surgical Device Engineering Team (S. Scheuermann)

    • D. 

      Surgical Device Engineering Team (O. Naumovski)

    • E. 

      Production Engineering (B. Barnes)

    • F. 

      Materials (S. Faulkner)

    • G. 

      Cost Accounting (B. McKenty)

    • H. 

      ERP System (G. Metz)

    • I. 

      Process Quality Engineer (A. Brown)

    • J. 

      Owning Department (Cleanroom, L. Rideout)

Back to Top Back to top