What Do You Know About The NEFT Daslari, USSR

Reviewed by Editorial Team
The ProProfs editorial team is comprised of experienced subject matter experts. They've collectively created over 10,000 quizzes and lessons, serving over 100 million users. Our team includes in-house content moderators and subject matter experts, as well as a global network of rigorously trained contributors. All adhere to our comprehensive editorial guidelines, ensuring the delivery of high-quality content.
Learn about Our Editorial Process
| By Jaksiboy
J
Jaksiboy
Community Contributor
Quizzes Created: 832 | Total Attempts: 12,227,924
| Attempts: 128 | Questions: 10 | Updated: Mar 20, 2025
Please wait...
Question 1 / 10
0 %
0/100
Score 0/100
1. It lies 100km away from the Azerbaijan Capital called?

Explanation

The correct answer is Baku because Baku is the capital of Azerbaijan and the question asks for the capital of Azerbaijan.

Submit
Please wait...
About This Quiz
What Do You Know About The Neft Daslari, USSR - Quiz

Neft Delsari is an industrial settlement in Baku, Azebaijan. The settlement forms part of the municipality of Cilov-Neft Dalsari in the Khazar raion. Take a quiz to learn about this floating oil city

2.
We’ll put your name on your report, certificate, and leaderboard.
2. The oil-rich city was originally named?

Explanation

not-available-via-ai

Submit
3. After oil was discovered there at 1,100 meters beneath the?

Explanation

The correct answer is Caspian sea because the question mentions that oil was discovered at 1,100 meters beneath something. Since the Caspian sea is the only option that is a body of water, it is logical to assume that the oil was discovered beneath the sea.

Submit
4. Large-scale construction started on the settlement in?

Explanation

Large-scale construction started on the settlement in 1958.

Submit
5. The settlement of Neft Daslari was built in?

Explanation

The settlement of Neft Daslari was built in 1949.

Submit
6. The city became the first world offshore oil?

Explanation

The correct answer is Platform because a platform is a structure built in the ocean to extract oil and gas from the seabed. It is a common method used in offshore oil drilling, and many cities have established offshore oil platforms to tap into underwater oil reserves. Therefore, it is logical to conclude that the city became the first world offshore oil platform.

Submit
7. Neft Dalsari was ready for commercial production by year?

Explanation

Neft Dalsari was ready for commercial production in the year 1951.

Submit
8. The systematic construction of trestle bridges connecting the artificial island was begun in the year? 

Explanation

The correct answer is 1952. This is because the question mentions the "systematic construction of trestle bridges connecting the artificial island." This suggests that there was a specific year when the construction began. Out of the given options, 1952 is the only year mentioned, so it is the correct answer.

Submit
9. Since oil has been discovered in other areas, the total workforce has halved to?

Explanation

The total workforce has halved to 2,500 because the discovery of oil in other areas has likely led to a decrease in the demand for workers in this particular area. The availability of oil in other locations means that companies may have shifted their operations and reduced their workforce in this area, resulting in a decrease in the total number of workers.

Submit
10. The first large-scale geological study of the area was conducted in?

Explanation

The correct answer is 1945-1948. This is the period during which the first large-scale geological study of the area was conducted.

Submit
View My Results
Cancel
  • All
    All (10)
  • Unanswered
    Unanswered ()
  • Answered
    Answered ()
It lies 100km away from the Azerbaijan Capital called?
The oil-rich city was originally named?
After oil was discovered there at 1,100 meters beneath the?
Large-scale construction started on the settlement in?
The settlement of Neft Daslari was built in?
The city became the first world offshore oil?
Neft Dalsari was ready for commercial production by year?
The systematic construction of trestle bridges connecting the...
Since oil has been discovered in other areas, the total workforce has...
The first large-scale geological study of the area was conducted in?
Alert!

Back to Top Back to top
Advertisement