NC Building General Contractor Practice Test
Igneous
Metamorphic
Sedimentary
Lava
Straight blade
Angled blade
"U" shaped blade
Scraper blade
1 inch
2 inches
3 inches
6 inches
In open sunlight so it can get air and remain dry
Outside covered by tarps wrapped tightly, flat on top with boards to hold tarp down
Outside laid flat on sides no more than two coils high
Stored in a dry area on dunnage to keep the tendons off the ground
2 Inches
3 Inches
4 Inches
5 Inches
Type I
Type II
Type III
Type IV
Improve the workability
Make the concrete stiffer
Allows the concrete to keep cooler temperatures
Makes the concrete lose slump
Brick saw
Masons trowel
Brick chisel
Brick hammer
Pointing up
Grouting joints
Repairing joints
Tuck-pointing
Flemish bond
Common bond
Stack bond
Running bond
Wide rib decking
Deep rib decking
Intermediate rib decking
Cellular decking
1/4 inch
1/2 inch
5/8 inch
3/4 inch
4 inches
6 inches
8 inches
9 inches
Minimal
Optional
Required
Engineered
1/12
2/12
3/12
4/12
5 1/2 inches
6 inches
6 1/2 inches
8 inches
2 mil
4 mil
6 mil
8 mil
The day of hire
One day
Two days
Three days
Ten days
30 days
60 days
90 days
120 days
Tax return
Cash receipts
Purchase order
Time cards