  • 1. 
    What does OSHA stands for?
    • A. 

      Occupational Safety And Health Administratiom

    • B. 

      Occupational Standards On Health Administration

    • C. 

      Occupational Safety And Hygiene Administration

    • D. 

      None of the above

  • 2. 
    What is the PQ( Pre-Qualification)score required  for a High Risk Activity by an contracting company in order to  contract with TML  
    • A. 

      Any Score above 70

    • B. 

      Any score above 75

    • C. 

      Any Score above 85

    • D. 

      Any Score above 80

  • 3. 
    What does FCA stands for in Contractor Safety Management.
    • A. 

      Factory Contractor Administrator

    • B. 

      Fire Contract Advisor

    • C. 

      Field Contract Advisor

    • D. 

      None of the above

  • 4. 
    Who is supposed to arrange / call Authorized Isolator - if required for the job?
    • A. 

      Custodian

    • B. 

      Initiator

    • C. 

      Issuer

    • D. 

      Permit Holder

  • 5. 
    What is the most effective medium for extinguishing flammable liquid fires in a contained area?
    • A. 

      Carbon dioxide

    • B. 

      Foam

    • C. 

      Water

    • D. 

      DCP

  • 6. 
    How much the ladder should be extended above the stepping point?
    • A. 

      4 Inches

    • B. 

      1 Feet

    • C. 

      Safe Length

    • D. 

      1 meter

  • 7. 
    Hooks & Shackles are to be tested and certified by a competent person on an ______ basis and tagged and marked with SWL, inspection date and next due date.
    • A. 

      Quaterly

    • B. 

      Half Yearly

    • C. 

      Annual

    • D. 

      Depending on the wear rate

  • 8. 
    In PTW Standard ………… shall be used for “Temporary removal of LOTO” for Test & Trial
    • A. 

      Annexure - VII

    • B. 

      Annexure – V

    • C. 

      Annexure – VI

    • D. 

      Annexure - IV 

  • 9. 
    The correct sequence of the TML six-step contractor safety management process is
    • A. 

      Contract preparation • Contractor Selection • Contract award • Orientation and training • Managing the Work • Periodic evaluation

    • B. 

      Contractor Selection • Periodic evaluation • Managing the Work • Contract preparation • Contract award • Orientation and training

    • C. 

      Contractor Selection • Contract preparation • Periodic evaluation • Orientation and training • Managing the Work • Contract award

    • D. 

      Contractor Selection • Contract preparation • Contract award • Orientation and training • Managing the Work • Periodic evaluation

  • 10. 
    _____ color locks are used to isolate electrical energy sources.
    • A. 

      Red

    • B. 

      Green

    • C. 

      Black

    • D. 

      Yellow

  • 11. 
    Arrange in correct sequence Lockout Procedure 1.Notify affected employees that machine or equipment will be shut down and locked out. 2. Release or restrain stored or residual energy. 3.Shut down the machinery or equipment Isolate energy sources with energy-isolating devices. 4.Lock out energy-isolating devices with assigned locks. 5.Test Machinery to make sure it cant start up
    • A. 

      1-2-3-4-5

    • B. 

      1-3-2-5-4

    • C. 

      1-3-4-2-5

    • D. 

      1-2-4-3-5

  • 12. 
    Loading of all tackles shall be………. of SWL.
    • A. 

      Below 90%

    • B. 

      100%

    • C. 

      Below 80%

    • D. 

      Below 75%