The ProProfs editorial team is comprised of experienced subject matter experts. They've collectively created over 10,000 quizzes and lessons, serving over 100 million users. Our team includes in-house content moderators and subject matter experts, as well as a global network of rigorously trained contributors. All adhere to our comprehensive editorial guidelines, ensuring the delivery of high-quality content.
Learn about Our Editorial Process
| By Dduarte
D
Dduarte
Community Contributor
Quizzes Created: 9 | Total Attempts: 80,674
| Attempts: 6,662 | Questions: 26
Please wait...
Question 1 / 26
0 %
0/100
Score 0/100
1. Due to improper location or failure to install dowels, new dowels may be __________.

Explanation

PG 166

Submit
Please wait...
About This Quiz
Masonry Practice Test 2 - Quiz

This Masonry Practice Test 2 assesses knowledge in masonry construction, focusing on material handling, weather considerations, structural integrity, and compliance with industry standards.

2. Special grout lifts of 12.67 feet maximum are permitted when ________.

Explanation

PG 205, 206 & 213

Submit
3. Walls should be protected from rain ________, depending on the temperature, so that the mortar is fully set and bond has occurred.

Explanation

PG 296

Submit
4. Grout shall have a minimum compressive strength of _________psi at 28 days.

Explanation

PG 85

Submit
5. Control joints are for the purpose of ____________.

Explanation

PG 273

Submit
6. For low-lift grouting, grout shall not be poured until the mortar has set _____ to adequately withstand the pressure of the grout.

Explanation

PG 207, 2nd paragraph

Submit
7. Grout pours _________may be consolidated by puddling.

Explanation

PG 210

Submit
8. Each masonry prism shall be constructed in _________.

Explanation

PG 88

Submit
9. The normal head size of a vibrator is ___________.

Explanation

PG 214

Submit
10. According to ASTM C 476, grout prepared at the jobsite shall be mixed for a minimum of ___________minutes.

Explanation

PG 70

Submit
11. Control joints must be ______ with structural anchoring requirements of intersection walls.

Explanation

PG 277

Submit
12. When the outside air temperature is less than 20°F, ___________ shall be provided to maintain the air temperature above 32°F.

Explanation

PG 283 & 289

Submit
13. The minimum grout space dimension for AAC masonry units shall be _______ or a 3 inch diameter cell.

Explanation

PG 206

Submit
14. The area of reinforcing bars placed in a cell or in a course of hollow unit construction shall not exceed _________% of the cell area.

Explanation

PG 158 & 159

Submit
15. With masonry units, bonding is achieved by using _________.

Explanation

Masonry units, such as bricks or concrete blocks, require bonding to ensure structural stability. Bonding is achieved by using mortar and grout. Mortar is a mixture of cement, sand, and water that is used to bind the masonry units together. It provides a strong adhesive bond between the units. Grout, on the other hand, is a mixture of cement, sand, and water that is used to fill the gaps between the masonry units. It helps to further strengthen the structure and improve its appearance. Therefore, both mortar and grout are essential for achieving proper bonding in masonry construction.

Submit
16. Control joints provide for movement of a wall in contraction and can have some solid masonry or grout in the joint.

Explanation

PG 279

Submit
17. In order to obtain a 28 day grout compressive strength of 2,000 psi, the seven day test, if taken, should be at least _______psi.

Explanation

PG 86

Submit
18. If the mean daily air temperature is 20°F, or below, the masonry temperature is ____________.

Explanation

PG 288

Submit
19. When ambient temperature is between 40°F and 32°F, _____ shall be heated to produce mortar between 40°F and 120°F.

Explanation

PG 288

Submit
20. Masonry walls that are covered with plastic or canvas should cover the top of the wall and hang over at least _________ on the face.

Explanation

PG 296

Submit
21. The maximum spacing of cleanouts in a solid grouted system shall not exceed _________ inches.

Explanation

PG 209

Submit
22. When applicable, prisms shall be grouted not less than __________, nor more than ___________ after construction of the prism.

Explanation

PG 89

Submit
23. Bars spliced by non-contact lap splices shall not be spaced transversely farther apart than _______ the required length of lap nor more than 8 inches.

Explanation

PG 173

Submit
24. The maximum tie spacing may not exceed 16 longitudinal bar diameters, __________ tie diameters, or the least column dimensions.

Explanation

PG 187 & 188 (toot note of table 5-H)

Submit
25. The temperature of masonry units shall not be less than _____ when laid in masonry.

Explanation

PG 282

Submit
26. When installing control joints, the mortar joint should be raked _________ inch deep.

Explanation

PG 275

Submit
View My Results

Quiz Review Timeline (Updated): Mar 22, 2023 +

Our quizzes are rigorously reviewed, monitored and continuously updated by our expert board to maintain accuracy, relevance, and timeliness.

  • Current Version
  • Mar 22, 2023
    Quiz Edited by
    ProProfs Editorial Team
  • Sep 09, 2009
    Quiz Created by
    Dduarte
Cancel
  • All
    All (26)
  • Unanswered
    Unanswered ()
  • Answered
    Answered ()
Due to improper location or failure to install dowels, new dowels may...
Special grout lifts of 12.67 feet maximum are permitted when ________.
Walls should be protected from rain ________, depending on the...
Grout shall have a minimum compressive strength of _________psi at 28...
Control joints are for the purpose of ____________.
For low-lift grouting, grout shall not be poured until the mortar has...
Grout pours _________may be consolidated by puddling.
Each masonry prism shall be constructed in _________.
The normal head size of a vibrator is ___________.
According to ASTM C 476, grout prepared at the jobsite shall be mixed...
Control joints must be ______ with structural anchoring requirements...
When the outside air temperature is less than 20°F, ___________ shall...
The minimum grout space dimension for AAC masonry units shall be...
The area of reinforcing bars placed in a cell or in a course of hollow...
With masonry units, bonding is achieved by using _________.
Control joints provide for movement of a wall in contraction and can...
In order to obtain a 28 day grout compressive strength of 2,000 psi,...
If the mean daily air temperature is 20°F, or below, the masonry...
When ambient temperature is between 40°F and 32°F, _____ shall be...
Masonry walls that are covered with plastic or canvas should cover the...
The maximum spacing of cleanouts in a solid grouted system shall not...
When applicable, prisms shall be grouted not less than __________, nor...
Bars spliced by non-contact lap splices shall not be spaced...
The maximum tie spacing may not exceed 16 longitudinal bar diameters,...
The temperature of masonry units shall not be less than _____ when...
When installing control joints, the mortar joint should be raked...