Quizzes
Search
Take Quizzes
Animal
Nutrition
Love
Relationship
Computer
Sports
Society
Business
Geography
Language
Personality
Harry Potter
Movie
Television
Music
Online Exam
Health
Country
Art
Entertainment
Celebrity
Math
Game
Book
Fun
Science
Food
History
Education
All Topics
Create a Quiz
Quiz Maker
Training Maker
Survey Maker
Flashcards
Brain Games
See All
ProProfs.com
Search
Create A Quiz
Take Quizzes
Animal
Nutrition
Love
Relationship
Computer
Sports
Society
Business
Geography
Language
Personality
Harry Potter
Movie
Television
Music
Online Exam
Health
Country
Art
Entertainment
Celebrity
Math
Game
Book
Fun
Science
Food
History
Education
All Topics
Products
Quiz Maker
Training Maker
Survey Maker
Flashcards
Brain Games
See All
ProProfs.com
Quizzes
Quizzes
›
Law
›
Building Laws
Building Laws 01
12 Questions
|
By MYLZ101 | Updated: Jan 25, 2013
| Attempts: 164
Share
Start
Share on Facebook
Share on Twitter
Share on Whatsapp
Share on Pinterest
Share on Email
Copy to Clipboard
Embed on your website
Question
1
/ 12
0 %
0/100
Score
0/100
1.
If, during bidding, your client asked you to provide a full-time staff member on the job site during construction, you would be entitled to extra compensation . Under what provision would this be?
CONTRACT SUM
CONTIGENT ADDITIONAL SERVICES
PROJECT REPRESENTATION BEYOND BASIC SERVICES
OPTIONAL ADDITIONAL CHARGES
Submit
Start Quiz
About This Quiz
CONTRACT DOCUMENTS
2.
What first name or nickname would you like us to use?
You may optionally provide this to label your report, leaderboard, or certificate.
2.
What fee method would you prefer if your Client was doing the first project and did not yet have a program?
FIXED SUM
MULTIPLE OF DIRECT PERSONNEL EXPENSE
PERCENTAGE PF CONSTRUCTION COST
UNIT COST BASED ON SQUARE METER
Submit
3.
You have a client who owns a large manufacturing plant and needs to expand to new facilities without interruption in production. The owner has already arranged for a flexible line of credit to finance construction but wants to minimize project cists. If the new facility will be very similar to the previous one, only sized for grater production capacity, which type of construction would you recommend?
DESIGN-BUILD
FAST-TRACK
MULTIPLE PRIME CONTRACT
DESIGN-AWARD-BUILD
Submit
4.
What is used to encourage the contractor to finish the job or to satisfy mechanics lien claims by sub-contractors?
RETAINAGE
FIXED LIMIT
SURETY BOND
LIQUIDATED DAMAGES
Submit
5.
Which of the following are part of the bidding documents? I. SPECIFICATIONS II. INVITATION TO BID 111. LIST OF SUB CONTRACTORS IV. OWNER-CONTRACTOR AGREEMENT V. PERFORMANCE BOND
I,II, IV, and V
II, III, and IV
II, III, IV, and V
All of the above
Submit
6.
Which of the following may the owner NOT do?
Stop work if the contractor’s performance in not satisfactory or in variance with the contract documents.
Carry on the work and deduct costs normally due to the contractor for these corrections.
Stop the work if the Architect reports safety problems on the site.
Refuse, with good cause, to give the contactor proof the owner can meet the financial obligations of the ...
Refuse, with good cause, to give the contactor proof the owner can meet the financial obligations of the project.
Submit
7.
A project is about 60 percent complete when the owner begins receiving field reports from the Architect stating that the contractor is failing to properly supervise the job, resulting in incorrect work. After several weeks of this, the owner becomes worried and asks the Architect what to do. What should be done if the work is being performed under the terms and conditions of the BUILDING CONTRACT?
After receiving the Architect’s field reports, the owner should stop the work and arrange for a meeting between the owner,...
After receiving the Architect’s field reports, the owner should stop the work and arrange for a meeting between the owner, the owner, Architect and the contractor to determine the cause of the problems and what the contractor intends to do. If the contractor does not correct the work, the owner should carry out the work with other contractors and deduct the cost by change order from the original contractor’s construction cost.
The Architect should recommend that the owner give the contractor written notice of non-conformance with the contract documents and if,...
The Architect should recommend that the owner give the contractor written notice of non-conformance with the contract documents and if, after seven days the contractor has not begun corrective measures, terminate the contract.
The Architect and owner should discuss the problem to see if the owner would be willing to accept it in...
The Architect and owner should discuss the problem to see if the owner would be willing to accept it in exchange for the reduction in the contract sum. If not, the owner should give seven days written notice to terminate the contract and find another contractor to finish the job.
The Architect should, with the owner’s knowledge, reject non-conforming work and notify the contractor that it must be corrected promptly....
The Architect should, with the owner’s knowledge, reject non-conforming work and notify the contractor that it must be corrected promptly. The Architect should remind the owner that the owner can have the work corrected after giving the contractor two (2) seven day written notices to correct the work.
Submit
8.
Which of the following would be used to formally incorporate a substitution into the work prior to the award of the contract?
CHANGE ORDER
ADDENDUM
ALTERNATE LISTING
CONSTRUCTION CHANGE DIRECTIVE
Submit
9.
The standard owner-architect agreement separates the architect from the contractor with what?
DUTIES TO THE CONTRACTOR
PRIVITY
ARCHITECT’S SERVICES
THIRD PARTY RELATIONSHIP
Submit
10.
Which of the following describes agency?
The Architect acts on behalf of the owner, making decisions and expediting the work and taking responsibilities the owner would...
The Architect acts on behalf of the owner, making decisions and expediting the work and taking responsibilities the owner would normally have.
The Architect mediates between the owner and the contractor and vendors for the benefit of the owner.
The Architect is the principal of the relationship who balances the needs of the contractor and the owner.
The Architect works fir the owner in certain designated area with the authority to act on the owner’s behalf.
Submit
11.
Which of the following is NOT an accurate statement?
The Architect is responsible for the defect in the work if he or she sees it but fails to report...
The Architect is responsible for the defect in the work if he or she sees it but fails to report it to the contractor.
The owner has the sole right to make changes in the work but must do it through the Architect.
The Architect does not have to verify and test reports given by the owner.
By the time construction documents are almost completed, the architect still does not have to give a reasonably accurate construction...
By the time construction documents are almost completed, the architect still does not have to give a reasonably accurate construction price.
Submit
12.
Which of the following are part of the contract documents? I. an addendum II. a change order III. special supplementary IV. the contractor's bid V. a written amendment condition
I, III, and V
I, II, III, and V
II, III, IV, and V
. all of the above
Submit
View My Results
Related Quizzes
Test You Knowledge About Building Laws! Quiz
Test You Knowledge About Building Laws! Quiz
Building Laws Quiz: Mastering The National Building Code Of The Philippines
Building Laws Quiz: Mastering The National Building Code Of The Philippines
Building Laws 03
Building Laws 03
Building Laws Quiz: How Much You Know?
Building Laws Quiz: How Much You Know?
Building Laws 03 Bp344, Pd957, Bp220
Building Laws 03 Bp344, Pd957, Bp220
Professional Practice & Building Laws
Professional Practice & Building Laws
Thank you for your feedback!
Would you like to edit this question to improve it?
No thanks
Name:
Email:
Oops! Give us more information:
Incorrect Question
Incorrect Answer
Typos
I have a feedback
Submit
Please provide name and email to proceed.
Please provide correct email to proceed.
Please provide feedback.
Please select the option.
All (12)
Unanswered (
)
Answered (
)
If, during bidding, your client asked you to provide a full-time staff...
What fee method would you prefer if your Client was doing the first...
You have a client who owns a large manufacturing plant and needs to...
What is used to encourage the contractor to finish the job or to...
Which of the following are part of the bidding documents?...
Which of the following may the owner NOT do?
A project is about 60 percent complete when the owner begins receiving...
Which of the following would be used to formally incorporate a...
The standard owner-architect agreement separates the architect from...
Which of the following describes agency?
Which of the following is NOT an accurate statement?
Which of the following are part of the contract documents?...