The ProProfs editorial team is comprised of experienced subject matter experts. They've collectively created over 10,000 quizzes and lessons, serving over 100 million users. Our team includes in-house content moderators and subject matter experts, as well as a global network of rigorously trained contributors. All adhere to our comprehensive editorial guidelines, ensuring the delivery of high-quality content.
Learn about Our Editorial Process
| By Annyxmix
A
Annyxmix
Community Contributor
Quizzes Created: 1 | Total Attempts: 791
| Attempts: 813
SettingsSettings
Please wait...
  • 1/100 Questions

    As per NBC, the minimum ceiling height for habitable room with natural ventilation shall be...

    • 2.40 meters
    • 2.70 meters
    • 3.00 meters
    • 2.10 meters
Please wait...
About This Quiz

This quiz assesses knowledge in Professional Practice and Building Laws, focusing on historical legal requirements for architects, technology transfer, contract adjustments, VAT calculations, and infrastructure standards. It's designed for professionals in architecture and civil engineering to ensure compliance and proficiency.

Professional Practice & Building Laws - Quiz

Quiz Preview

  • 2. 

    What does A & E stands for?

    • Aesthetic and Essentials

    • Architecture and Engineering

    • Arts and Expressions

    • Architecture and Examples

    Correct Answer
    A. Architecture and Engineering
    Explanation
    The acronym A&E stands for Architecture and Engineering. This refers to the fields of study and practice that involve designing and constructing buildings and other structures. Architecture focuses on the aesthetic and functional aspects of designing spaces, while engineering deals with the technical and structural aspects of construction. Together, these disciplines collaborate to create safe, efficient, and visually appealing structures.

    Rate this question:

  • 3. 

    Any physical change made on a building/structure to increase its value, utility and/or to improve its aesthetic quality?

    • Alteration

    • Addition

    • Renovation

    • Repair

    Correct Answer
    A. Renovation
    Explanation
    Renovation refers to any physical change made on a building or structure with the purpose of increasing its value, utility, and/or improving its aesthetic quality. This can involve updating or modernizing certain aspects of the building, such as replacing outdated fixtures or finishes, improving functionality, or enhancing the overall appearance. Renovation differs from repair, as it focuses on more comprehensive changes that go beyond fixing specific issues or damages. Alteration and addition can also be part of the renovation process, but renovation encompasses a broader scope of improvements.

    Rate this question:

  • 4. 

    As per NBC, what would be the minimum ceiling height of a habitable room with natural ventilation?

    • 2.40 meters

    • 2.70 meters

    • 3.00 meters

    • 2.10 meters

    Correct Answer
    A. 2.70 meters
    Explanation
    According to NBC (National Building Code), the minimum ceiling height for a habitable room with natural ventilation should be 2.70 meters. This means that any room intended for human occupancy and designed to have natural airflow must have a minimum height of 2.70 meters from the floor to the ceiling. This requirement ensures adequate air circulation and promotes a comfortable and healthy living environment.

    Rate this question:

  • 5. 

    A room for human habitation shall have a minimum dimension of ______ x 3.00 meters.

    • 1.50 meters

    • 2.00 meters

    • 3.00 meters

    • 4.00 meters

    Correct Answer
    A. 2.00 meters
    Explanation
    A room for human habitation must have a minimum dimension of 2.00 meters x 3.00 meters. This means that the room must be at least 2.00 meters wide and 3.00 meters long in order to meet the minimum requirements for human habitation.

    Rate this question:

  • 6. 

    Minimum area for toilet and bath (in sq.m.)

    • 3.00

    • 2.40

    • 1.20

    • 1.50

    Correct Answer
    A. 1.20
    Explanation
    The minimum area for a toilet and bath is 1.20 square meters. This means that the combined area of the toilet and bath should be at least 1.20 square meters. It is important to have a minimum area to ensure that there is enough space for the necessary fixtures and for comfortable use of the toilet and bath.

    Rate this question:

  • 7. 

    The portion of a roadway or public way that should be kept opened and unobstructed at all times for the expedient conduct of fire fighting operations.

    • Fire road

    • Fire lane

    • Fire way

    • Fire track

    Correct Answer
    A. Fire lane
    Explanation
    A fire lane refers to the portion of a roadway or public way that should be kept opened and unobstructed at all times for the expedient conduct of firefighting operations. This allows fire trucks and emergency vehicles to have easy and quick access to the location in case of a fire emergency. It ensures that there are no obstacles or hindrances that could delay or impede the firefighting operations.

    Rate this question:

  • 8. 

    Which is NOT an Ancillary Permit?

    • Fencing Permit

    • Structural Permit

    • Sanitary Permit

    • Electrical Permit

    Correct Answer
    A. Fencing Permit
    Explanation
    The correct answer is Fencing Permit. The question asks for the option that is NOT an Ancillary Permit. Ancillary permits are permits that are required for specific aspects of a construction project, such as structural, sanitary, or electrical permits. A fencing permit, on the other hand, is not directly related to the construction of a building or structure, but rather pertains to the installation of a fence on a property. Therefore, it is not considered an ancillary permit.

    Rate this question:

  • 9. 

    Given a room with floor area of  300 square meters, what shall be the total area required for window openings for said room?

    • 10.00 sq.m.

    • 15.00 sq.m.

    • 25.00 sq.m.

    • 30.00 sq.m.

    Correct Answer
    A. 30.00 sq.m.
    Explanation
    The total area required for window openings in a room is typically calculated based on a certain percentage of the floor area. This percentage can vary depending on factors such as building codes and design preferences. In this case, the total area required for window openings is equal to 10% of the floor area, which is 30 square meters (300 square meters multiplied by 0.10). Therefore, the correct answer is 30.00 sq.m.

    Rate this question:

  • 10. 

    As per PD 957, what is the prescribed ratio for saleable and non-saleable lots?

    • 60% : 40%

    • 40% : 60%

    • 70% : 30%

    • 30% : 70%

    Correct Answer
    A. 70% : 30%
    Explanation
    As per PD 957, the prescribed ratio for saleable and non-saleable lots is 70% : 30%. This means that 70% of the lots in a development should be designated for sale, while 30% should be non-saleable, such as for common areas, parks, roads, or other shared facilities. This ratio ensures that there is enough space for the development's amenities and infrastructure, while still maximizing the number of lots available for sale.

    Rate this question:

  • 11. 

    A separating strip between arcaded portion and open portion of sidewalk of a combined open and arcaded sidewalk.

    • Fence

    • Separation wall

    • .80m Planting strip

    • Handrail

    Correct Answer
    A. .80m Planting strip
    Explanation
    The correct answer is .80m Planting strip. A planting strip is an area of land that is used for planting trees, flowers, or other vegetation. In this context, the planting strip is a separating strip between the arcaded portion and open portion of the sidewalk. It serves as a barrier or divider between the two sections and also provides space for planting and beautifying the area. The width of the planting strip is specified as .80m, indicating the size of the strip.

    Rate this question:

  • 12. 

    What is the  minimum ceiling height for habitable rooms with artificial ventilation?

    • 2.40 meters

    • 2.70 meters

    • 3.00 meters

    • 2.10 meters

    Correct Answer
    A. 2.40 meters
    Explanation
    The minimum ceiling height for habitable rooms with artificial ventilation is 2.40 meters. This means that any habitable room, such as a bedroom or living room, must have a ceiling height of at least 2.40 meters when artificial ventilation, such as fans or air conditioning, is used. This ensures that there is enough space for occupants to move comfortably and that there is proper air circulation in the room.

    Rate this question:

  • 13. 

    What is the minimum area for toilet and bath in square meters?

    • 1.50 sq.m.

    • 1.20 sq.m.

    • 3.00 sq.m.

    • 2.25 sq.m.

    Correct Answer
    A. 1.20 sq.m.
    Explanation
    The minimum area for a toilet and bath is typically determined by building codes and regulations. A standard minimum requirement is 1.20 sq.m. This area is considered sufficient for basic fixtures such as a toilet, sink, and shower or bathtub. It allows for comfortable movement and functionality within the space while also considering hygiene and safety requirements.

    Rate this question:

  • 14. 

    A toilet and bath shall have a minimum dimension of .90 meter x  ______ square meters.

    • 3.00

    • 2.25

    • 1.50

    • 1.20

    Correct Answer
    A. 1.20
    Explanation
    A toilet and bath shall have a minimum dimension of .90 meter x 1.20 square meters. This means that the minimum area of the toilet and bath should be 1.20 square meters.

    Rate this question:

  • 15. 

    What offense is committed when an architect is found using the seal of another architect?

    • Misdemeanor

    • Illegal Practice

    • Malpractice

    • Fraud

    Correct Answer
    A. Misdemeanor
    Explanation
    Using the seal of another architect is considered a misdemeanor offense. This means that it is a minor criminal offense, punishable by fines or a short period of imprisonment. It is illegal for an architect to use another architect's seal without their permission, as it is a form of identity theft and misrepresentation. This offense undermines the integrity of the architectural profession and can lead to legal consequences for the offender.

    Rate this question:

  • 16. 

    A written document describing in detail the scope of work, materials to be used, methods of installation, and quality of workmanship.

    • Bill Of Materials

    • Bid Documents

    • Contract Documents

    • Specifications

    Correct Answer
    A. Specifications
    Explanation
    Specifications are a written document that provides detailed information about the scope of work, materials to be used, methods of installation, and quality of workmanship. They outline the requirements and expectations for a project or job, ensuring that all parties involved have a clear understanding of what needs to be done. Specifications help to ensure consistency and quality in the work being performed and serve as a reference for contractors, suppliers, and other stakeholders. They are an essential part of contract documents and bid documents, providing crucial information for the successful completion of a project.

    Rate this question:

  • 17. 

    When a Client calls upon the Architect to give oral or written advice and direction, to attend conferences, to make evaluations and appraisals regarding a contemplated project and similar activities, the Architect renders valuable inputs whether or not the Client pursues the project. This scope of pre-design services is called ______.

    • Design Brief Preparation

    • Consultation

    • Space Management Studies

    • Architectural Research

    Correct Answer
    A. Consultation
    Explanation
    The correct answer is "Consultation." When a client seeks advice and direction from an architect, whether it be through oral or written communication, attending conferences, or making evaluations and appraisals for a potential project, the architect provides valuable input. This scope of pre-design services is known as consultation, as the architect is offering their expertise and guidance to the client, regardless of whether the project is pursued or not.

    Rate this question:

  • 18. 

    Aside from the people and country, who does the architect give supreme to oath to?

    • Client

    • Contractor

    • God

    • Colleagues

    Correct Answer
    A. God
    Explanation
    The architect gives supreme oath to God because it is a common practice in many professions to swear allegiance or loyalty to a higher power or higher authority. In this case, the architect acknowledges that their work is not solely for the benefit of the client, the contractor, or their colleagues, but also for a higher purpose or greater good. By pledging their allegiance to God, the architect emphasizes their commitment to integrity, ethics, and the pursuit of excellence in their profession.

    Rate this question:

  • 19. 

    Preparation of shop drawing is the sole function of the:

    • Owner

    • Architect

    • Contractor

    • Project Manager

    Correct Answer
    A. Contractor
    Explanation
    The correct answer is Contractor. The preparation of shop drawings, which are detailed drawings that provide specific information about the fabrication and installation of components in a construction project, is typically the responsibility of the contractor. The contractor is responsible for coordinating and managing the construction process, including the preparation of shop drawings that conform to the design plans and specifications provided by the architect. The contractor uses these drawings to communicate with subcontractors, suppliers, and other stakeholders involved in the construction process.

    Rate this question:

  • 20. 

    Under the regular design services, which of the following activities falls under the contract documents phase?

    • Prepares documents for contract letting / construction forms / abstract of bios

    • Prepares design documents / construction drawings & specifications

    • Makes periodic site visits

    • Certifies work progress to owner

    Correct Answer
    A. Prepares design documents / construction drawings & specifications
    Explanation
    In the regular design services, the activity that falls under the contract documents phase is preparing design documents, construction drawings, and specifications. This phase involves creating the necessary documents and plans that outline the design and specifications for the construction project. These documents serve as a guide for the contractors and builders during the construction phase.

    Rate this question:

  • 21. 

    As per BP 220, which is second to water in the hierarchy of basic needs of human settlements, the provision of which shall be based on the actual setting which the project is located?

    • Parks & Playgrounds

    • Movement & Circulation

    • Water

    • Storm Drainage

    Correct Answer
    A. Movement & Circulation
    Explanation
    As per BP 220, the provision of Movement & Circulation is second to water in the hierarchy of basic needs of human settlements. This means that after ensuring access to clean water, the next priority is to establish efficient and safe systems for movement and circulation within the project location. This includes the design and construction of roads, sidewalks, pathways, and transportation infrastructure to facilitate the movement of people and vehicles. By prioritizing Movement & Circulation, BP 220 aims to create well-connected and accessible human settlements that promote convenience, efficiency, and safety for its residents.

    Rate this question:

  • 22. 

    When the Owner fails to implement the plans and documents for construction as prepared by the Architect, the Architect is entitled to receive, as compensation, the sum corresponding to ___ of the Architect's fee.

    • 65%

    • 80%

    • 85%

    • 90%

    Correct Answer
    A. 90%
    Explanation
    When the owner fails to implement the plans and documents for construction as prepared by the architect, the architect is entitled to receive a higher compensation, specifically 90% of the architect's fee. This is likely because the architect has put in significant time, effort, and expertise into creating the plans and documents, and if they are not used, it would be unfair for the architect to receive a lower compensation for their work.

    Rate this question:

  • 23. 

    Air space requirement for a habitable room.

    • 12 cu.m.

    • 14 cu.m.

    • 3.00 cu.m.

    • 10.00 cu.m.

    Correct Answer
    A. 14 cu.m.
    Explanation
    The correct answer is 14 cu.m. This is the air space requirement for a habitable room. It is important to have sufficient air space in a room to ensure proper ventilation and a comfortable living environment. A room with a larger air space will have better air circulation and can accommodate more people. Therefore, 14 cu.m. is the most suitable option for a habitable room.

    Rate this question:

  • 24. 

    A kind of public open space defined under the Water Code and other laws that must be absolutely free of all forms of physical obstructions that can negatively affect natural light and ventilation within such space or that can impede access to or the full recreational use of such space by the general public.

    • Promenade

    • Esplanade

    • Eastment

    • Courtyard

    Correct Answer
    A. Eastment
    Explanation
    The correct answer is "Eastment." Eastment refers to a type of public open space that is regulated by the Water Code and other laws. It must be free from any physical obstructions that can hinder natural light, ventilation, or public access and recreational use. The other options, promenade, esplanade, and courtyard, do not specifically refer to public open spaces defined under the Water Code and other laws.

    Rate this question:

  • 25. 

    It is the most common method of compensation which is also fair to both client and architect?

    • Multiple of direct personnel expenses

    • Professional fee plus expenses

    • Percentage fee method

    • Lump sum

    Correct Answer
    A. Percentage fee method
    Explanation
    The percentage fee method is the most common method of compensation for architects. This method is considered fair to both the client and the architect because it is based on a percentage of the total project cost. This means that as the project cost increases, the architect's fee also increases, ensuring that they are adequately compensated for their work. Additionally, this method allows for flexibility as the fee can be adjusted based on the complexity and size of the project.

    Rate this question:

  • 26. 

    Maximum number of rowhouse units in a block.

    • 10

    • 20

    • 25

    • 30

    Correct Answer
    A. 20
    Explanation
    The maximum number of rowhouse units in a block is 20. This means that in a single block, the highest number of rowhouse units that can be accommodated is 20.

    Rate this question:

  • 27. 

    A registered & licensed architect, who is academically & professionally qualified, & with exceptional or recognized specialization in any branch of Architecture.

    • Architect of Record

    • Consulting Architect

    • Architect

    • Architect in charge of construction

    Correct Answer
    A. Consulting Architect
    Explanation
    A consulting architect is a registered and licensed architect who has both academic and professional qualifications. They also have exceptional or recognized specialization in any branch of architecture. This means that they have extensive knowledge and expertise in a specific area of architecture, allowing them to provide specialized advice and guidance to clients and other architects. They may be hired to provide consultation services on specific projects or to assist with complex design or technical issues.

    Rate this question:

  • 28. 

    Within how many month/s shall be the release of retention from date of final payment?

    • 1

    • 2

    • 3

    • 4

    Correct Answer
    A. 3
    Explanation
    The release of retention is expected to occur within 3 months from the date of final payment. This means that after the final payment is made, it will take approximately 3 months for the retention to be released.

    Rate this question:

  • 29. 

    These preliminary studies involve the procurement, analysis and use of secondary information gathered for the project to aid the client in early decision-making.

    • Feasibility Studies

    • Pre-feasibility Studies

    • Architectural Research

    • Architectural Programming

    Correct Answer
    A. Pre-feasibility Studies
    Explanation
    Pre-feasibility studies are conducted as a part of preliminary research for a project. They involve gathering and analyzing secondary information to assess the feasibility of the project. This information helps the client make early decisions regarding the project's viability. These studies are conducted before the actual feasibility study and provide valuable insights into the project's potential success. They help the client understand the project's risks, costs, and benefits, allowing them to make informed decisions about whether to proceed with the project or not.

    Rate this question:

  • 30. 

    As per Fire Code, under what classification does fire in flammable liquids and gasses belong to?

    • Class A

    • Class B

    • Class C

    • Class D

    Correct Answer
    A. Class B
    Explanation
    Fire in flammable liquids and gases belongs to Class B classification according to the Fire Code. Class B fires involve flammable liquids and gases such as gasoline, oil, alcohol, propane, and butane. These fires are typically extinguished using foam, dry chemical, or carbon dioxide extinguishers, as water may spread the fire or cause an explosion. Class B fires can be extremely dangerous and require specialized knowledge and equipment for effective suppression.

    Rate this question:

  • 31. 

    As per Fire Code, what is the maximum number of seats in rows of seats between aisles for places of assembly?

    • 12

    • 14

    • 10

    • 7

    Correct Answer
    A. 14
    Explanation
    According to the Fire Code, the maximum number of seats in rows of seats between aisles for places of assembly is 14.

    Rate this question:

  • 32. 

    Stipulation of the use of specific products or purposes without provision for substitution is a?

    • Closed Specification

    • Performance Specification

    • Reference Specification

    • Descriptive Specification

    Correct Answer
    A. Closed Specification
    Explanation
    A closed specification is an explanation for the given correct answer. It refers to a type of specification that stipulates the use of specific products or purposes without allowing for any substitutions. In other words, it requires the use of a particular product or service without any alternatives. This type of specification is commonly used when there is a need for consistency or when specific requirements must be met.

    Rate this question:

  • 33. 

    The approved form of security furnished by the contractor as a guarantee of good faith on the part of the contractor to execute the work in accordance with terms of the contract.

    • Guarantee Bond

    • Surety Bond

    • Performance Bond

    • Proposal Bond

    Correct Answer
    A. Performance Bond
    Explanation
    A performance bond is a type of security provided by a contractor to ensure that they will fulfill their obligations as stated in the contract. It serves as a guarantee of good faith on the part of the contractor to complete the work according to the agreed terms. This bond provides protection to the project owner in case the contractor fails to meet their contractual obligations, such as delays or substandard work. It ensures that the owner will be compensated for any financial losses incurred due to the contractor's non-performance.

    Rate this question:

  • 34. 

    Cost-based method of compensation applicable only to NON-CREATIVE WORK.

    • UNIT COST METHOD

    • MULTIPLE OF DIRECT PERSONNEL EXPENSES

    • LUMP SUM OR FIXED FEE

    • PROFESSIONAL FEE PLUS EXPENSES

    Correct Answer
    A. MULTIPLE OF DIRECT PERSONNEL EXPENSES
    Explanation
    The given correct answer states that the cost-based method of compensation is applicable only to non-creative work. This implies that when determining the compensation for non-creative work, the cost-based method is used. This method involves calculating the compensation based on the direct personnel expenses incurred for the work. It does not take into account factors such as creativity or innovation, but rather focuses on the direct costs associated with the personnel involved in the work.

    Rate this question:

  • 35. 

    What is the minimum lot area for rowhouse socialized housing units as provided for in BP 220?

    • 26

    • 28

    • 30

    • 32

    Correct Answer
    A. 28
    Explanation
    The minimum lot area for rowhouse socialized housing units as provided for in BP 220 is 28. This means that any rowhouse socialized housing unit must have a minimum lot area of 28 square units.

    Rate this question:

  • 36. 

    This method of compensation applies to government projects since they entail more paper work and time-consuming efforts.

    • Per Diem, Honorarium Plus Reimbursable Expenses

    • Mixed Methods of Compensation

    • Lump Sum or Fixed Fee

    • Multiple of Direct Personnel Expenses

    Correct Answer
    A. Lump Sum or Fixed Fee
    Explanation
    Lump Sum or Fixed Fee is the correct answer because government projects often involve a significant amount of paperwork and require more time-consuming efforts. In such cases, it is more practical to use a fixed fee or lump sum method of compensation. This method ensures that the contractor receives a predetermined amount for their work, regardless of the actual time and resources spent on the project. It simplifies the payment process and provides a level of certainty for both parties involved.

    Rate this question:

  • 37. 

    Defining "open space" in residential subdivisions and attending section 31 of Presidential Decree no. 957 requiring subdivision owners to provide roads, alleys, sidewalks and reserve open space for parks and recreational use.

    • PD 1216

    • PD 1612

    • PD 1215

    • PD 1512

    Correct Answer
    A. PD 1216
    Explanation
    PD 1216 is the correct answer because it is the Presidential Decree that defines "open space" in residential subdivisions and also refers to section 31 of Presidential Decree no. 957. This decree requires subdivision owners to provide roads, alleys, sidewalks, and reserve open space for parks and recreational use.

    Rate this question:

  • 38. 

    Minimum ceiling height at the third floor of a building provided with natural ventilation.

    • 2.10 meters

    • 2.40 meters

    • 2.70 meters

    • 3.00 meters

    Correct Answer
    A. 2.70 meters
    Explanation
    The minimum ceiling height at the third floor of a building provided with natural ventilation is 2.70 meters. This height allows for proper airflow and ventilation in the space, ensuring a comfortable and healthy environment. A higher ceiling height would further enhance the ventilation, while a lower height may restrict the movement of air and lead to poor air quality. Therefore, 2.70 meters is the optimal height for natural ventilation on the third floor of a building.

    Rate this question:

  • 39. 

    If the owner continuously order changes to the design, what methods of compensation should be used?

    • Lump sum

    • Mode and percentage fee

    • Percentage fee and cost method

    • Per DIEM and MDPE

    Correct Answer
    A. Percentage fee and cost method
    Explanation
    When the owner continuously orders changes to the design, the most suitable methods of compensation would be the percentage fee and cost method. The percentage fee ensures that the designer is compensated based on a percentage of the total project cost, which takes into account the additional work and revisions caused by the owner's changes. The cost method allows the designer to be reimbursed for the actual costs incurred, such as additional materials, labor, and other expenses directly related to the changes. This combination of methods provides a fair and balanced approach to compensate the designer for their extra efforts and expenses.

    Rate this question:

  • 40. 

    Minimum width of access road for interior or rear lots.

    • 6.00 meters

    • 3000 millimeters

    • 5.00 meters

    • 4000 millimeters

    Correct Answer
    A. 3000 millimeters
    Explanation
    The minimum width of access road for interior or rear lots is given as 3000 millimeters. This means that the access road should have a width of at least 3000 millimeters to accommodate vehicles and allow for easy movement. This measurement is important for ensuring that there is enough space for vehicles to maneuver and access the lots without any obstruction. It is a standard requirement to ensure proper functionality and accessibility for the interior or rear lots.

    Rate this question:

  • 41. 

    As per Fire Code, where the total occupant load of all storeys served by the stair is less than 50, the minimum width clear of all obstructions, shall be _____ millimeters.

    • 812

    • 915

    • 1120

    • 1221

    Correct Answer
    A. 915
    Explanation
    According to the Fire Code, when the total occupant load of all storeys served by the stair is less than 50, the minimum width clear of all obstructions should be 915 millimeters.

    Rate this question:

  • 42. 

    This specialized architectural service is based on the concept of expanded physical planning services to include other activities necessary for the proper handling of the numerous components considered in the formulation, implementation and realization of a Master Development Plan (MDP). It covers the range of all services from primary data gathering through the formulation of the MDP and the parallel preparation of the environmental impact assessment / statement (EIA/S).

    • SITE DEVELOPMENT PLANNING (SDP) SERVICES

    • SITE AND PHYSICAL PLANNING SERVICES

    • COMPREHENSIVE DEVELOPMENT PLANNING (CDP) SERVICES

    • HISTORIC AND HERITAGE CONSERVATION AND PLANNING

    Correct Answer
    A. COMPREHENSIVE DEVELOPMENT PLANNING (CDP) SERVICES
    Explanation
    The given correct answer for this question is "COMPREHENSIVE DEVELOPMENT PLANNING (CDP) SERVICES". This is because the explanation provided in the passage states that the specialized architectural service is based on the concept of expanded physical planning services to include other activities necessary for the proper handling of the numerous components considered in the formulation, implementation, and realization of a Master Development Plan (MDP). The term "comprehensive" suggests that it covers a wide range of services, including primary data gathering, formulation of the MDP, and preparation of the environmental impact assessment/statement (EIA/S). Therefore, "COMPREHENSIVE DEVELOPMENT PLANNING (CDP) SERVICES" is the most appropriate answer.

    Rate this question:

  • 43. 

    Towers, spires and steeples, erected as parts of the building and not used for habitation or storage may extend but not exceed ____ meters above the prescribed building height limit (BHL) for each occupancy group, if of combustible materials.

    • 3.00

    • 6.00

    • 12.00

    • 9.00

    Correct Answer
    A. 6.00
    Explanation
    Towers, spires, and steeples that are part of a building and not used for habitation or storage can extend up to 6.00 meters above the prescribed building height limit (BHL) for each occupancy group if they are made of combustible materials. This means that if the BHL for a particular occupancy group is, for example, 20 meters, the towers, spires, or steeples can extend up to a maximum height of 26 meters.

    Rate this question:

  • 44. 

    Is a continuous and unobstructed route of exit from one point in a building, structure or facility to a public way.

    • Corridor

    • Hallway

    • Means of Egress

    • Fire Exit

    Correct Answer
    A. Means of Egress
    Explanation
    A means of egress refers to a continuous and unobstructed route that allows people to exit safely from a building, structure, or facility to a public way. It is an essential element for ensuring the safety of occupants during emergencies such as fires. Corridors and hallways are components of the means of egress, as they provide the necessary pathways for people to evacuate. A fire exit is also part of the means of egress, as it is a designated exit specifically intended for use during fire emergencies.

    Rate this question:

  • 45. 

    In this selection process, the Architect explains his methodology in translating the plan/design requirements of the proposed project.

    • Verification

    • Pre-qualification

    • Evaluation and Ranking

    • Interview

    Correct Answer
    A. Interview
    Explanation
    The given correct answer is "Interview". In the selection process, the Architect explains his methodology in translating the plan/design requirements of the proposed project. This suggests that the interview stage is where the Architect gets the opportunity to present and discuss their approach to the project, explaining how they will meet the requirements and translate them into a design plan. The interview allows the selection committee to evaluate the Architect's understanding of the project, their expertise, and their ability to effectively communicate their methodology.

    Rate this question:

  • 46. 

    An architect makes a miniature model of the project for his own design study. Who should pay for it?

    • PM

    • Client

    • Architect

    • Contractor

    Correct Answer
    A. Architect
    Explanation
    The architect should pay for the miniature model of the project for their own design study because it is a tool they use to visualize and study their design. It is part of their professional process and responsibility to ensure the design is well thought out and meets the client's requirements. Therefore, it is reasonable for the architect to cover the cost of creating the model.

    Rate this question:

  • 47. 

    What is the difference between RA 545 and RA 9266 in terms of architectural practice?

    • Two-years diversified experience

    • Structural Conceptualization

    • Corporate Practice

    • Authorship of documents

    Correct Answer
    A. Structural Conceptualization
    Explanation
    The difference between RA 545 and RA 9266 in terms of architectural practice is the inclusion of Structural Conceptualization in RA 9266. This means that under RA 9266, architects are allowed to engage in the conceptualization of the structural design of buildings, whereas under RA 545, this was not specifically mentioned.

    Rate this question:

  • 48. 

    Within how many days from the date a change is ordered shall any claim for adjustment involving questions of facts be asserted?

    • 5

    • 10

    • 15

    • 30

    Correct Answer
    A. 15
    Explanation
    Within 15 days from the date a change is ordered, any claim for adjustment involving questions of facts should be asserted. This means that if there is a change in a situation or circumstance, and this change leads to a need for adjustment or clarification regarding factual matters, the claim should be made within 15 days. This allows for a reasonable amount of time to gather information, assess the situation, and assert the claim for adjustment.

    Rate this question:

  • 49. 

    As per NBC, a building/structure which is located partly in one (1) fire zone and partly in another shall be considered to be in the more highly restrictive fire zone, when more than _____ of its total floor area is located in such zone.

    • 1/2

    • 1/3

    • 1/4

    • 2/3

    Correct Answer
    A. 1/3
    Explanation
    According to NBC, when more than 1/3 of the total floor area of a building/structure is located in a more highly restrictive fire zone, it shall be considered to be in that zone.

    Rate this question:

Quiz Review Timeline (Updated): Jun 28, 2024 +

Our quizzes are rigorously reviewed, monitored and continuously updated by our expert board to maintain accuracy, relevance, and timeliness.

  • Current Version
  • Jun 28, 2024
    Quiz Edited by
    ProProfs Editorial Team
  • Jul 06, 2017
    Quiz Created by
    Annyxmix
Back to Top Back to top
Advertisement
×

Wait!
Here's an interesting quiz for you.

We have other quizzes matching your interest.