1.
Air Force Civil Engineer Support Agency (AFCESA)
How many staff experts make up AFCESA and are in civil engineering and civil engineering support?
Correct Answer
C. 300
Explanation
AFCESA is composed of 300 staff experts who specialize in civil engineering and civil engineering support.
2.
Air Force Contract Augmentation Program (AFCAP) is a civilian contract resource option to relieve or augment Prime BEEF forces.
Correct Answer
A. True
Explanation
The statement is true because the Air Force Contract Augmentation Program (AFCAP) is indeed a civilian contract resource option that is used to provide relief or additional support to Prime BEEF forces. AFCAP allows the Air Force to contract with civilian companies or organizations to provide various services and support, such as construction, maintenance, logistics, and other capabilities, to enhance the capabilities of Prime BEEF forces. This helps to ensure that Prime BEEF forces have the necessary resources and support to carry out their missions effectively.
3.
In what month does AFCESA issue a call letter to MAJCOMs each year?
Correct Answer
A. January
Explanation
AFCESA issues a call letter to MAJCOMs each year in January. This suggests that January is the specific month when this action takes place.
4.
In what contingency training tier does hands-on training in field sanitation belong to?
Correct Answer
C. Tier 1
Explanation
Hands-on training in field sanitation belongs to Tier 1 contingency training. This tier focuses on basic training and skills that are essential for all personnel. Field sanitation is a fundamental aspect of military operations, ensuring the health and well-being of personnel in the field. Therefore, it is included in the foundational training provided in Tier 1.
5.
What is used to designate a position associated with an equipment item in their AFSC?
Correct Answer
B. Suffixes
Explanation
Suffixes are used to designate a position associated with an equipment item in their AFSC. Suffixes are added to the AFSC (Air Force Specialty Code) to provide further specificity and detail about the position or job within that code. They help to differentiate between different positions or roles within the same AFSC, allowing for more precise identification and assignment of individuals to specific duties or responsibilities.
6.
The job qualification standard (JQS) screen is where your supervisor documents your OJT.
Correct Answer
A. True
Explanation
The job qualification standard (JQS) screen is a place where your supervisor records your on-the-job training (OJT). This suggests that the statement "The job qualification standard (JQS) screen is where your supervisor documents your OJT" is true. It implies that the JQS screen is used as a tool to track and document an employee's progress and proficiency in their job qualifications through OJT.
7.
What training method is used for a planned performance by a trainer of physical or motor skill, a scientific principle, or an experiment?
Correct Answer
C. Demonstration Method
Explanation
The demonstration method is used for a planned performance by a trainer of physical or motor skill, a scientific principle, or an experiment. This method involves showing or illustrating how something is done or how a concept works. It allows the trainer to visually and practically demonstrate the desired skills or principles to the learners, enabling them to observe and understand the correct techniques or procedures. This method is effective in enhancing learning and retention as it provides a concrete example for learners to follow and imitate.
8.
CerTest replaces hands on training.
Correct Answer
B. False
Explanation
The statement "CerTest replaces hands-on training" is false. This suggests that CerTest does not replace hands-on training but rather serves a different purpose or complements it in some way. The given answer, "False," indicates that the statement is incorrect and that CerTest does not replace hands-on training. However, without further context or information about what CerTest is, it is difficult to provide a more detailed explanation.
9.
What is the primary goal of the Environmental Compliance Assessment and Management Program?
Correct Answer
D. To improve environmental management thus meeting environmental compliance.
Explanation
The primary goal of the Environmental Compliance Assessment and Management Program is to improve environmental management, which in turn helps in meeting environmental compliance. This means that the program aims to enhance the way environmental issues are managed, ensuring that all regulations and standards are met. By improving environmental management practices, the program contributes to the overall goal of achieving and maintaining environmental quality. This includes protecting human life and the environment, as well as ensuring compliance with pollution control standards.
10.
What is the correct acronym for CATEX?
Correct Answer
B. Categorical Exclusions
Explanation
The correct acronym for CATEX is Categorical Exclusions. This term refers to the process of excluding certain activities or projects from the requirement of undergoing an environmental review. Categorical exclusions are typically used when the potential impacts of a project are deemed to be minimal or when the project falls under a specific category that has been predetermined to not have significant environmental effects.
11.
Hazardous waste management program
What annual refresher training topics does not belong concerning Training and documentation?
Correct Answer
D. Corrosion Control
Explanation
The other three topics (Accumulation point management, Waste Reduction, and Waste turn-in procedures) are directly related to the management and handling of hazardous waste, which is the main focus of the hazardous waste management program. Corrosion control, on the other hand, is not directly related to training and documentation for hazardous waste management. It is a separate topic that deals with preventing and managing corrosion in various systems and equipment.
12.
What are the two basic methods for Abatement when used concurrently, have proven most effective in LBP abatement projects?
Correct Answer
B. Dry and Wet Cleaning
Explanation
Dry and Wet Cleaning are the two basic methods for Abatement that, when used concurrently, have proven most effective in LBP abatement projects. Dry cleaning involves using specialized equipment to remove dust and debris without the use of water, while wet cleaning involves using water and cleaning agents to thoroughly clean surfaces. By combining these two methods, the risk of lead exposure is minimized as dry cleaning removes loose particles and wet cleaning removes any remaining lead dust or residue. This comprehensive approach ensures a thorough and effective abatement process.
13.
To make a positive image requires investing time and patience.
Correct Answer
B. False
Explanation
Making a positive image does not necessarily require investing time and patience. It can be achieved through various other means such as effective communication, building good relationships, delivering quality work, and maintaining a positive attitude. Time and patience may be important in certain situations, but they are not always the only factors involved in creating a positive image. Therefore, the statement is false.
14.
There are the 3 key elements to developing and evaluation program:
Process, Product & ___________
Correct Answer
A. Satisfaction
Explanation
The question is asking for the missing key element in developing and evaluating a program. The correct answer is "Satisfaction". This is because when developing and evaluating a program, it is important to consider the satisfaction of the individuals or stakeholders involved. By ensuring that the program meets their needs and expectations, it is more likely to be successful. Additionally, measuring and evaluating satisfaction can provide valuable insights for improvement and future development of the program.
15.
What form is used to initiate the recurring work program?
Correct Answer
C. AF Form 1841
Explanation
AF Form 1841 is used to initiate the recurring work program.
16.
In Minor Construction, if the statutory limit of $500,000 is exceeded who gives the approval to proceed with construction?
Correct Answer
D. HQ USAF/ILE
Explanation
HQ USAF/ILE gives the approval to proceed with construction if the statutory limit of $500,000 is exceeded in Minor Construction.
17.
Procedures or detailed "how-to" instructions are found in AFPDs.
Correct Answer
B. False
Explanation
The statement suggests that procedures or detailed "how-to" instructions are found in AFPDs. However, the correct answer is false. This means that procedures or detailed instructions are not found in AFPDs. The explanation implies that AFPDs do not contain step-by-step instructions or detailed procedures.
18.
Which Regulatory Publications attempts to reduce fires and other hazards?
Correct Answer
B. NFPA
Explanation
NFPA, or the National Fire Protection Association, is a regulatory publication that aims to reduce fires and other hazards. It develops and publishes codes and standards for fire prevention and safety in various industries and settings. These codes and standards provide guidelines and requirements for the installation, operation, and maintenance of equipment and systems to mitigate the risk of fires and other hazards. By following NFPA regulations, individuals and organizations can enhance safety measures and reduce the likelihood of accidents and incidents related to fire.
19.
Time compliance technical orders (TCTO) are issued to correct unsafe conditions and to prevent fatal accidents, severe injuries, or the destruction of property. T/F
Correct Answer
A. True
Explanation
Time compliance technical orders (TCTO) are issued to address unsafe conditions and prevent potential accidents, injuries, or property damage. These orders are essential for ensuring compliance with safety regulations and maintaining a high level of safety in various industries. By implementing TCTOs, organizations can proactively identify and rectify any potential hazards, reducing the risk of fatal accidents or severe injuries. Therefore, the statement that TCTOs are issued to correct unsafe conditions and prevent fatal accidents, severe injuries, or the destruction of property is true.
20.
Engineering technical letters (ETL) provides specific design guidance, procedures, criteria, and standards. T/F
Correct Answer
A. True
Explanation
Engineering technical letters (ETL) indeed provide specific design guidance, procedures, criteria, and standards. These letters are used to communicate technical information and instructions within the engineering field. They are typically issued by engineering organizations or agencies to ensure consistency and quality in engineering designs and practices. By providing specific guidance and standards, ETLs help engineers adhere to best practices and achieve desired outcomes in their design projects. Therefore, the statement that ETLs provide specific design guidance, procedures, criteria, and standards is true.
21.
What is a detailed manpower listing reflecting authorizations or slots by work center?
Correct Answer
B. Unit Manpower Document (UMD)
Explanation
A detailed manpower listing reflecting authorizations or slots by work center is called the Unit Manpower Document (UMD). This document provides information about the authorized positions within a unit and the specific work centers where these positions are located. It helps in managing and organizing the personnel within the unit by providing a clear structure of the manpower requirements. The UMD is an important tool for unit leaders to ensure that they have the necessary personnel in each work center to effectively carry out their mission.
22.
What type of support agreement administered by the AF supports non-DOD activities (i.e., Army Corps of Engineers, located on an AF installation)?
Correct Answer
C. Intragovernmental agreements
Explanation
Intragovernmental agreements are a type of support agreement administered by the Air Force that supports non-DOD activities such as the Army Corps of Engineers, which may be located on an Air Force installation. These agreements involve cooperation and support between different government agencies or departments, in this case, the Air Force and non-DOD entities.
23.
A cost account code is also known as an AF Account Code. T/F
Correct Answer
A. True
Explanation
A cost account code is indeed also known as an AF Account Code. This code is used to categorize and track costs within an organization. It helps in allocating expenses to specific departments or projects, facilitating budgeting and financial analysis. Therefore, the statement "A cost account code is also known as an AF Account Code" is true.
24.
What Major AF Account Code category is Military Family Housing?
Correct Answer
B. 70000
Explanation
Military Family Housing is categorized under the Major AF Account Code category 70000. This category specifically pertains to expenses related to providing housing for military families.
25.
What flight is responsible for the overall maintenance of the customer account code?
Correct Answer
A. Resource Flight
Explanation
The Resource Flight is responsible for the overall maintenance of the customer account code. This indicates that the Resource Flight team handles the management and upkeep of the customer account code, ensuring its accuracy and functionality. They are likely in charge of making any necessary updates or changes to the code and ensuring that it aligns with the needs and requirements of the customers.
26.
The Air Force Vehicle and Equipment Management Support Office (VEMSO), is and ___________ support agency that collects, drafts, creates, monitors, and reports on vehicle and equipment issues addressed above the MAJCOM level.
Correct Answer
D. HQ AF/A4L
Explanation
HQ AF/A4L is the correct answer because it is the office responsible for providing support in managing and addressing vehicle and equipment issues above the MAJCOM level. The other options listed are not relevant to this specific task.
27.
Self Help program is a "high priority" project which is an excellent way for organizations to do some important "people projects".
Correct Answer
B. False
Explanation
The statement suggests that a self-help program is a "high priority" project and an excellent way for organizations to focus on important "people projects." However, the correct answer is false because the statement does not provide enough information to determine whether a self-help program is indeed a high priority or an excellent way for organizations to prioritize people projects.
28.
What AF Form is used primarly as an approval document for work to be done by CE, and specifically when the work will be accomplished one of three ways:
1. In-service.
2. Self-help.
3. Contract.
Correct Answer
D. AF Form 332
Explanation
AF Form 332 is used primarily as an approval document for work to be done by CE (Civil Engineering). It is specifically used when the work will be accomplished in one of three ways: in-service, self-help, or contract. This form serves as a formal request for approval and ensures that the necessary authorization is obtained before any work is carried out by the CE.
29.
When a AF Form 332 is prepared how many copies does it come with?
Correct Answer
A. 3
Explanation
When a AF Form 332 is prepared, it comes with three copies. This suggests that there are multiple parties or departments that need to have access to this form. Having three copies allows for distribution to different individuals or departments involved in the process, ensuring that each party has a copy for their records or further action.
30.
On a AF Form 332 what Block is the Justification for work to be accomplished on?
Correct Answer
C. Block 9
Explanation
On an AF Form 332, Block 9 is the block where the justification for work to be accomplished is provided. This block allows the individual to explain the reasons or rationale behind the work that needs to be done. It provides an opportunity to provide necessary details and information that support the need for the requested work.
31.
In an absence of a computer system, what form do you use to authorize DSWs?
Correct Answer
A. AF Form 1879
Explanation
In the absence of a computer system, the form used to authorize DSWs is AF Form 1879.
32.
Filling out a DSW. If the request is for a general or colonel's housing quarters "General/senior officer "O-6" field (GENQTRS). What letter is used?
Correct Answer
C. "G" or "S"
Explanation
The correct answer is "G" or "S". This is because "G" stands for General and "S" stands for Senior Officer. In the context of the question, if the request is for a general or colonel's housing quarters, the letter "G" or "S" would be used to indicate the type of housing quarters being requested.
33.
What would be the Type of service (TYPESVC) when there are other toilets available in a restroom if one of them is inop?
Correct Answer
A. R
Explanation
The correct answer is R. This suggests that the type of service (TYPESVC) would be "R" when there are other toilets available in a restroom but one of them is inoperable. This could indicate that the restroom is still providing a regular level of service despite the one toilet being out of order.
34.
Updating work status. The status of work in progress must be updated each time it moves from one area of CE into another.
Correct Answer
A. True
Explanation
The statement is true because updating the work status is necessary to keep track of the progress and ensure effective communication within the organization. By updating the status each time work moves from one area to another, it allows for better coordination, prevents duplication of efforts, and helps in identifying any bottlenecks or delays in the workflow. This ensures that everyone involved is aware of the current status of the work and can plan accordingly.
35.
In-Service Work Plan (IWP) projects past hours for each shop based on assigned personnel and estimated hours for each type of work based on historical labor data and pre-idendified work.
Correct Answer
B. False
Explanation
The given statement is false. The In-Service Work Plan (IWP) projects future hours for each shop based on assigned personnel and estimated hours for each type of work. It does not reflect past hours or historical labor data.
36.
Monthly labor analysis reports compared overtime, provide aht programmer with a good idea of how many man-hours a given shop spends of DSW orders, RWP, operations and services, and other work each month.
Correct Answer
A. True
Explanation
The monthly labor analysis reports can provide the AHT programmer with a good idea of the number of man-hours spent on various tasks each month. This includes DSW orders, RWP, operations and services, and other work. Therefore, the statement is true.
37.
Building the IWP. In foreign countries, national holidays may be different from US holidays so the number of work days do not vary.
Correct Answer
B. False
Explanation
The explanation for the correct answer, which is False, is that the statement is incorrect. In foreign countries, national holidays may indeed be different from US holidays, which can result in a variation in the number of work days.
38.
What LUC is used for Operations and Services work?
Correct Answer
B. LUC 19
Explanation
LUC 19 is used for Operations and Services work.
39.
Cost Centers. Which cost centers is used to report daily labor for the bulk of the operations flight?
Correct Answer
A. ATA
Explanation
ATA stands for Air Transport Association. It is used as a cost center to report daily labor for the bulk of the operations flight. This means that ATA is responsible for tracking and reporting the labor costs associated with the majority of the flight operations.
40.
Variance analysis is the logical evaluation of the reasons for discrepancies between estimated labor hours and actual performance labor hours.
Correct Answer
A. True
Explanation
Variance analysis is a process that involves comparing the estimated labor hours with the actual performance labor hours in order to identify and understand the reasons behind any discrepancies. It helps in evaluating the effectiveness of the labor hours estimation and identifying areas where improvements can be made. Therefore, the statement that variance analysis is the logical evaluation of the reasons for discrepancies between estimated labor hours and actual performance labor hours is true.
41.
Which Material Acquisition operation will always use GPC to purcase material?
Correct Answer
A. GOCESS
Explanation
The correct answer is GOCESS. GOCESS stands for Government-Owned Contractor-Operated Supply System, which is a material acquisition operation where the government uses GPC (Government Purchase Card) to purchase materials. In this system, the government owns the contractor-operated supply system and uses the GPC as the method of payment for material purchases. COCESS, on the other hand, does not always involve the use of GPC for material acquisition.
42.
Project codes are three-position alphanumeric codes used to identify special projects. what position numbers are used for the project codes?
Correct Answer
C. 57-59
Explanation
The project codes are identified using three-position alphanumeric codes, and the position numbers used for these codes are 57-59.
43.
AF Form 9 is typicall used for non-recurring requests.
Correct Answer
A. True
Explanation
AF Form 9 is typically used for non-recurring requests. This means that it is not used for requests that occur regularly or repeatedly. Instead, it is used for one-time or occasional requests. This could include requests for special equipment, supplies, or services that are not part of the regular operations or budget. By using AF Form 9 for non-recurring requests, it helps to ensure that these requests are properly documented and reviewed before being approved or denied.
44.
Blanket Purchase Agreements (BPA) are not contracts but merely advance agreements for future contractual undertakings.
Correct Answer
A. True
Explanation
A Blanket Purchase Agreement (BPA) is a type of agreement between a buyer and a seller that establishes the terms and conditions for future purchases. It is not considered a contract because it does not bind either party to specific obligations or deliverables. Instead, it serves as an advance agreement or framework for future contractual undertakings. Therefore, the statement that BPAs are not contracts but merely advance agreements for future contractual undertakings is true.
45.
It is the Material Acquisition's responsibility to monitor BPAs.
Correct Answer
A. True
Explanation
The statement implies that Material Acquisition is responsible for monitoring BPAs (Blanket Purchase Agreements). This suggests that it is indeed the responsibility of Material Acquisition to oversee and manage these agreements. Therefore, the correct answer is True.
46.
Government Purchase Card (GPC) may not be used to purchase authorized supplies, equipment, and non-personal services up to the micro-purchase threshold (currently $2500).
Correct Answer
B. False
Explanation
The statement is false because Government Purchase Cards (GPC) are specifically designed to be used for purchasing authorized supplies, equipment, and non-personal services up to the micro-purchase threshold of $2500.
47.
Military Interdepartmenal Prchase Request (MIPR). The acceptance of a MIPR by the performing activity serves as a notice to the requiring activity that the MIPR has been received and accepted for action.
Correct Answer
A. True
Explanation
The explanation for the given correct answer is that when a Military Interdepartmental Purchase Request (MIPR) is accepted by the performing activity, it serves as a notice to the requiring activity that the MIPR has been received and accepted for action. This means that the performing activity acknowledges the MIPR and is ready to take the necessary steps to fulfill the request. Therefore, the statement "The acceptance of a MIPR by the performing activity serves as a notice to the requiring activity that the MIPR has been received and accepted for action" is true.
48.
What Local Purchase Status Codes is used to indicate that cancellation action cannot be accomplished. Item will remain on order and will require receipt.
Correct Answer
D. B8
Explanation
Local Purchase Status Code B8 is used to indicate that cancellation action cannot be accomplished. This means that if an item has this status code, it cannot be canceled and will remain on order. The item will still need to be received as originally planned.
49.
The Illustrated parts breakdown (IPB) is the TO series used most by CE Material Acquisition personnel.
Correct Answer
A. True
Explanation
The Illustrated Parts Breakdown (IPB) is a series of Technical Orders (TO) that is primarily used by CE Material Acquisition personnel. This suggests that the IPB is a commonly utilized resource for these personnel when it comes to acquiring materials. Therefore, the statement is true.
50.
User Manuals usually offer the level of detail as TOs.
Correct Answer
B. False
Explanation
User Manuals typically do not offer the same level of detail as Technical Orders (TOs). TOs are comprehensive documents that provide detailed instructions, specifications, and procedures for operating and maintaining equipment or systems. User Manuals, on the other hand, are usually more simplified and user-friendly, focusing on providing basic instructions and information for users to understand and operate a product. Therefore, the statement that User Manuals offer the same level of detail as TOs is false.