3e6x1 Ure Practice Quiz #1

Reviewed by Editorial Team
The ProProfs editorial team is comprised of experienced subject matter experts. They've collectively created over 10,000 quizzes and lessons, serving over 100 million users. Our team includes in-house content moderators and subject matter experts, as well as a global network of rigorously trained contributors. All adhere to our comprehensive editorial guidelines, ensuring the delivery of high-quality content.
Learn about Our Editorial Process
| By Duane0527
D
Duane0527
Community Contributor
Quizzes Created: 1 | Total Attempts: 195
| Attempts: 195 | Questions: 100
Please wait...
Question 1 / 100
0 %
0/100
Score 0/100
1. Researching transaction histories. Researching the transaction history will help you determine when and where and error occurred.

Explanation

Researching transaction histories is indeed a helpful way to determine when and where an error occurred. By examining the transaction history, one can track the sequence of events and identify any discrepancies or irregularities that may have led to the error. This process allows for a thorough investigation and enables the identification of the root cause of the problem, leading to effective resolution and prevention of future errors.

Submit
Please wait...
About This Quiz
Air Force Quizzes & Trivia

This 3E6X1 URE practice quiz assesses knowledge on topics such as AFCESA staffing, AFCAP's role, and contingency training tiers. It is crucial for learners in Air Force civil engineering roles, enhancing understanding of operational and support functions.

Personalize your quiz and earn a certificate with your name on it!
2. Monthly labor analysis reports compared overtime, provide aht programmer with a good idea of how many man-hours a given shop spends of DSW orders, RWP, operations and services, and other work each month.

Explanation

The monthly labor analysis reports can provide the AHT programmer with a good idea of the number of man-hours spent on various tasks each month. This includes DSW orders, RWP, operations and services, and other work. Therefore, the statement is true.

Submit
3. Air Force incident management system (AFSIMS) was developed to ensure service compliance and consistency with Presidential, DOD,and Air Force directives for all-hazards emertency prevention, preparedness, response, recovery, and mitigation operations.

Explanation

The given statement is true. The Air Force incident management system (AFSIMS) was developed to ensure compliance and consistency with directives from the President, the Department of Defense (DOD), and the Air Force. It is designed to handle all-hazards emergency prevention, preparedness, response, recovery, and mitigation operations. This system helps the Air Force effectively manage incidents and maintain a coordinated approach in dealing with emergencies.

Submit
4. Geo BEST system provides a means to lay out a tent city or industrial area by using existing maps and creating overlays.

Explanation

The statement is true because the Geo BEST system allows for the layout of a tent city or industrial area by utilizing existing maps and creating overlays. This means that planners can use the system to accurately plan and design the layout of these areas, taking into account the existing geographical features and infrastructure. By using overlays, they can easily visualize and make adjustments to the layout as needed.

Submit
5. Operating the UCC. The CE UCC is usualy maintained by what flight?

Explanation

The correct answer is Operations Flight. The CE UCC, which stands for Civil Engineering Unit Control Center, is typically maintained by the Operations Flight. This flight is responsible for overseeing the day-to-day operations and management of the UCC. They ensure that all tasks and activities related to civil engineering are coordinated and executed efficiently. The Operations Flight plays a crucial role in maintaining the functionality and effectiveness of the UCC.

Submit
6. Personnel accountability.What is the Air Force's number one resource?

Explanation

The Air Force's number one resource is people because they are the ones who operate the vehicles, use the equipment, and consume the food. Without skilled and accountable personnel, the Air Force would not be able to effectively carry out its missions and operations. People are the most valuable asset in any organization, and this is especially true in the military where teamwork, training, and dedication are essential for success.

Submit
7. Storage level. The fourth part of the warehouse location is the level of storage. Each level is identified by a single capital letter, with ____ designating the lowest level, ___ the next level up, and so on.

Explanation

The correct answer is A,B. In the given question, it is stated that each level of storage in the warehouse is identified by a single capital letter. The levels are designated in ascending order, with the lowest level being designated as A, the next level up as B, and so on. Therefore, A,B is the correct answer as it represents the first two levels of storage in the warehouse.

Submit
8. Posturing Ce mobility teams. The Air Force presents its forces via an Air and Space Expeditionary Task Force (AETF). The basic building block used in force planning and the deployment of AETFs in the UTC.

Explanation

The statement is true because the Air Force utilizes Air and Space Expeditionary Task Forces (AETFs) to present its forces. AETFs are the basic building blocks used in force planning and deployment, and they consist of various units and capabilities that can be tailored to specific mission requirements. These AETFs enable the Air Force to effectively posture and mobilize its mobility teams for various operations and deployments.

Submit
9. Military Interdepartmenal Prchase Request (MIPR). The acceptance of a MIPR by the performing activity serves as a notice to the requiring activity that the MIPR has been received and accepted for action.

Explanation

The explanation for the given correct answer is that when a Military Interdepartmental Purchase Request (MIPR) is accepted by the performing activity, it serves as a notice to the requiring activity that the MIPR has been received and accepted for action. This means that the performing activity acknowledges the MIPR and is ready to take the necessary steps to fulfill the request. Therefore, the statement "The acceptance of a MIPR by the performing activity serves as a notice to the requiring activity that the MIPR has been received and accepted for action" is true.

Submit
10. Discrepancy Categories. The inventory process involves collecting and classifying the causes of unresolved discrepancies in order to show trends or problem areas.

Explanation

The statement is true because the inventory process does indeed involve collecting and classifying the causes of unresolved discrepancies. This helps in identifying trends or problem areas within the inventory system. By analyzing these discrepancies, businesses can take necessary actions to rectify the issues and improve their inventory management processes.

Submit
11. Engineering technical letters (ETL) provides specific design guidance, procedures, criteria, and standards. T/F

Explanation

Engineering technical letters (ETL) indeed provide specific design guidance, procedures, criteria, and standards. These letters are used to communicate technical information and instructions within the engineering field. They are typically issued by engineering organizations or agencies to ensure consistency and quality in engineering designs and practices. By providing specific guidance and standards, ETLs help engineers adhere to best practices and achieve desired outcomes in their design projects. Therefore, the statement that ETLs provide specific design guidance, procedures, criteria, and standards is true.

Submit
12. Performing inventory adjustments. Only personnel with inventory adjustment access rights can make actual adjustments.

Explanation

This statement is true because performing inventory adjustments requires personnel with inventory adjustment access rights. This means that only authorized individuals who have been granted the necessary permissions can make actual adjustments to the inventory.

Submit
13. Non-CEMAS receipts. Documents that authorize individuals to receive classified property must be prepared and maintained separately from documents authorizing individuals to receive unclassified supplies and equipment.

Explanation

The explanation for the given correct answer is that non-CEMAS receipts, which are documents that authorize individuals to receive classified property, should be kept separate from documents authorizing individuals to receive unclassified supplies and equipment. This separation helps to ensure proper handling and accountability of classified materials, as well as prevent unauthorized access or disclosure of sensitive information. By maintaining separate documentation, organizations can better track and control the distribution and use of classified property.

Submit
14. Air Force Contract Augmentation Program (AFCAP) is a civilian contract resource option to relieve or augment Prime BEEF forces.

Explanation

The statement is true because the Air Force Contract Augmentation Program (AFCAP) is indeed a civilian contract resource option that is used to provide relief or additional support to Prime BEEF forces. AFCAP allows the Air Force to contract with civilian companies or organizations to provide various services and support, such as construction, maintenance, logistics, and other capabilities, to enhance the capabilities of Prime BEEF forces. This helps to ensure that Prime BEEF forces have the necessary resources and support to carry out their missions effectively.

Submit
15. CEMAS Inquiries. Nouns are uniquely identified by ___________ numbers.

Explanation

In the given question, the correct answer is "CSL". This suggests that nouns in CEMAS inquiries are uniquely identified by CSL numbers.

Submit
16. What would be the Type of service (TYPESVC) when there are other toilets available in a restroom if one of them is inop?

Explanation

The correct answer is R. This suggests that the type of service (TYPESVC) would be "R" when there are other toilets available in a restroom but one of them is inoperable. This could indicate that the restroom is still providing a regular level of service despite the one toilet being out of order.

Submit
17. LMR Principles. Radio waves travel through free space at the speed of light and can be reflected, refracted, or diffracted.

Explanation

Radio waves, being a form of electromagnetic radiation, do indeed travel through free space at the speed of light. Additionally, they can be reflected, refracted, or diffracted, just like other types of electromagnetic waves. Therefore, the statement is true.

Submit
18. CerTest replaces hands on training.

Explanation

The statement "CerTest replaces hands-on training" is false. This suggests that CerTest does not replace hands-on training but rather serves a different purpose or complements it in some way. The given answer, "False," indicates that the statement is incorrect and that CerTest does not replace hands-on training. However, without further context or information about what CerTest is, it is difficult to provide a more detailed explanation.

Submit
19. The Instalation control center (ICC) communicates directions and information and recommends strategic priorities for the EOC and IC concerning the incident.

Explanation

The Installation Control Center (ICC) serves as a communication hub, providing directions, information, and strategic priorities to both the Emergency Operations Center (EOC) and Incident Commander (IC) during an incident. This implies that the ICC plays a crucial role in coordinating and guiding the response efforts. Therefore, the given statement is true.

Submit
20. Managing the Noun Dictionary. If a noun inquiry is performed for the noun "Runner" and no noun records exist, the synonyms appear with the number of noun records associated with each noun.

Explanation

If a noun inquiry is performed for the noun "Runner" and no noun records exist, the synonyms will appear with the number of noun records associated with each noun. This means that if there are no specific records for the noun "Runner," the system will display synonyms related to "Runner" along with the number of records associated with each of those synonyms. Therefore, the statement is true.

Submit
21. Updating work status. The status of work in progress must be updated each time it moves from one area of CE into another.

Explanation

The statement is true because updating the work status is necessary to keep track of the progress and ensure effective communication within the organization. By updating the status each time work moves from one area to another, it allows for better coordination, prevents duplication of efforts, and helps in identifying any bottlenecks or delays in the workflow. This ensures that everyone involved is aware of the current status of the work and can plan accordingly.

Submit
22. AF Form 9 is typicall used for non-recurring requests.

Explanation

AF Form 9 is typically used for non-recurring requests. This means that it is not used for requests that occur regularly or repeatedly. Instead, it is used for one-time or occasional requests. This could include requests for special equipment, supplies, or services that are not part of the regular operations or budget. By using AF Form 9 for non-recurring requests, it helps to ensure that these requests are properly documented and reviewed before being approved or denied.

Submit
23. What flight is responsible for the overall maintenance of the customer account code?

Explanation

The Resource Flight is responsible for the overall maintenance of the customer account code. This indicates that the Resource Flight team handles the management and upkeep of the customer account code, ensuring its accuracy and functionality. They are likely in charge of making any necessary updates or changes to the code and ensuring that it aligns with the needs and requirements of the customers.

Submit
24. Variance analysis is the logical evaluation of the reasons for discrepancies between estimated labor hours and actual performance labor hours.

Explanation

Variance analysis is a process that involves comparing the estimated labor hours with the actual performance labor hours in order to identify and understand the reasons behind any discrepancies. It helps in evaluating the effectiveness of the labor hours estimation and identifying areas where improvements can be made. Therefore, the statement that variance analysis is the logical evaluation of the reasons for discrepancies between estimated labor hours and actual performance labor hours is true.

Submit
25. What AF Form is used primarly as an approval document for work to be done by CE, and specifically when the work will be accomplished one of three ways: 1. In-service. 2. Self-help. 3. Contract.

Explanation

AF Form 332 is used primarily as an approval document for work to be done by CE (Civil Engineering). It is specifically used when the work will be accomplished in one of three ways: in-service, self-help, or contract. This form serves as a formal request for approval and ensures that the necessary authorization is obtained before any work is carried out by the CE.

Submit
26. When a AF Form 332 is prepared how many copies does it come with?

Explanation

When a AF Form 332 is prepared, it comes with three copies. This suggests that there are multiple parties or departments that need to have access to this form. Having three copies allows for distribution to different individuals or departments involved in the process, ensuring that each party has a copy for their records or further action.

Submit
27. Time compliance technical orders (TCTO) are issued to correct unsafe conditions and to prevent fatal accidents, severe injuries, or the destruction of property. T/F

Explanation

Time compliance technical orders (TCTO) are issued to address unsafe conditions and prevent potential accidents, injuries, or property damage. These orders are essential for ensuring compliance with safety regulations and maintaining a high level of safety in various industries. By implementing TCTOs, organizations can proactively identify and rectify any potential hazards, reducing the risk of fatal accidents or severe injuries. Therefore, the statement that TCTOs are issued to correct unsafe conditions and prevent fatal accidents, severe injuries, or the destruction of property is true.

Submit
28. When it becomes necessary to remove a noun record from the Noun Dictionary, it is a good idea to code the record for deletion instead of actually deleting it because CEMAS will retain this record until it is no longer needed for any application.

Explanation

It is a good idea to code the record for deletion instead of actually deleting it from the Noun Dictionary because CEMAS will retain this record until it is no longer needed for any application. This ensures that the record can still be accessed and used if necessary, without permanently deleting it.

Submit
29. The SBSS Due-out Validation File (MM09) is used by CEMAS to update Purchase Order file (MPOF) records and to provide you a method to review items requisitioned from SBSS that did not go through CEMAS.

Explanation

The SBSS Due-out Validation File (MM09) serves two purposes for CEMAS. Firstly, it is used to update the Purchase Order file (MPOF) records. Secondly, it provides a way to review items that were requisitioned from SBSS but did not go through CEMAS. Therefore, the statement is true.

Submit
30. Holding  Area Issue Selection. The holding area issue selection screen requires the input of the Receiver's ID Number and the Issued by ID Number.

Explanation

The explanation for the given correct answer is that the holding area issue selection screen indeed requires the input of both the Receiver's ID Number and the Issued by ID Number. This suggests that in order to proceed with the holding area issue selection, both ID numbers must be provided as input.

Submit
31. A cost account code is also known as an AF Account Code. T/F

Explanation

A cost account code is indeed also known as an AF Account Code. This code is used to categorize and track costs within an organization. It helps in allocating expenses to specific departments or projects, facilitating budgeting and financial analysis. Therefore, the statement "A cost account code is also known as an AF Account Code" is true.

Submit
32. Assignment and use of freeze codes. Freeze codes are assigned to an item by end-of-session programs or when an inventory request is processed.

Explanation

Freeze codes are assigned to an item by end-of-session programs or when an inventory request is processed. This statement implies that freeze codes are indeed assigned to items in these situations. Therefore, the answer "True" is correct.

Submit
33. The job qualification standard (JQS) screen is where your supervisor documents your OJT.

Explanation

The job qualification standard (JQS) screen is a place where your supervisor records your on-the-job training (OJT). This suggests that the statement "The job qualification standard (JQS) screen is where your supervisor documents your OJT" is true. It implies that the JQS screen is used as a tool to track and document an employee's progress and proficiency in their job qualifications through OJT.

Submit
34. In an absence of a computer system, what form do you use to authorize DSWs?

Explanation

In the absence of a computer system, the form used to authorize DSWs is AF Form 1879.

Submit
35. Foreign currency. While operating in a foreign country, te preferred method of payment could be the country's own currency, not US dollars.

Explanation

When operating in a foreign country, it is often more convenient and cost-effective to use the country's own currency for payment instead of US dollars. This is because using the local currency eliminates the need for currency exchange, which can involve additional fees and unfavorable exchange rates. Additionally, accepting the local currency can also help to support the local economy and foster positive relationships with local businesses and customers. Therefore, it is generally preferred to use the country's own currency when operating in a foreign country.

Submit
36. Which Material Acquisition operation will always use GPC to purcase material?

Explanation

The correct answer is GOCESS. GOCESS stands for Government-Owned Contractor-Operated Supply System, which is a material acquisition operation where the government uses GPC (Government Purchase Card) to purchase materials. In this system, the government owns the contractor-operated supply system and uses the GPC as the method of payment for material purchases. COCESS, on the other hand, does not always involve the use of GPC for material acquisition.

Submit
37. The System Interface File (MSYS) file provides a record which contains the information needed to send and receive files from BCAS.

Explanation

The System Interface File (MSYS) file is designed to store the necessary data for sending and receiving files from BCAS. This file acts as an interface between the system and BCAS, allowing the system to efficiently exchange files with BCAS. Therefore, the statement is true as the MSYS file contains the required information for file transfer with BCAS.

Submit
38. Prime BEEF pallets. What is needed to pack and load the equipment and supplies for air movement?

Explanation

To pack and load equipment and supplies for air movement, the necessary items are pallets to provide a stable base, nets to secure the items on the pallets, tiedown straps to further secure the load, pallet covers to protect the items from damage, and dunnage to fill any empty spaces and prevent shifting during transportation. This combination of items ensures that the equipment and supplies are properly packed and secured for air movement.

Submit
39. Which Regulatory Publications attempts to reduce fires and other hazards?

Explanation

NFPA, or the National Fire Protection Association, is a regulatory publication that aims to reduce fires and other hazards. It develops and publishes codes and standards for fire prevention and safety in various industries and settings. These codes and standards provide guidelines and requirements for the installation, operation, and maintenance of equipment and systems to mitigate the risk of fires and other hazards. By following NFPA regulations, individuals and organizations can enhance safety measures and reduce the likelihood of accidents and incidents related to fire.

Submit
40. Who obligates the the government to a contractual agreement?

Explanation

The contracting officer is responsible for obligating the government to a contractual agreement. They have the authority to enter into contracts on behalf of the government and ensure that all parties involved fulfill their contractual obligations. The contracting officer plays a crucial role in the procurement process and is responsible for managing and overseeing the contractual relationship between the government and its contractors.

Submit
41. Hazardous waste management program What annual refresher training topics does not belong concerning Training and documentation? 

Explanation

The other three topics (Accumulation point management, Waste Reduction, and Waste turn-in procedures) are directly related to the management and handling of hazardous waste, which is the main focus of the hazardous waste management program. Corrosion control, on the other hand, is not directly related to training and documentation for hazardous waste management. It is a separate topic that deals with preventing and managing corrosion in various systems and equipment.

Submit
42. Performing Inventory. Which inventory is discovered outside the scheduled inventory time frame and is requested to resolve the problem.

Explanation

The correct answer is "Special." This is because the question is asking about an inventory that is discovered outside the scheduled inventory time frame and is requested to resolve a problem. The term "Special" implies that this inventory is not part of the regular or scheduled inventory process, but rather a specific inventory conducted for a particular reason or situation.

Submit
43. Inventory adjustment analysis. Trend charts are prepared and maintained. How many months of data are shown?

Explanation

The correct answer is 6 Months. This means that the trend charts for inventory adjustment analysis show data for a period of 6 months. This duration allows for a sufficient amount of data to be considered in order to identify any patterns or trends in inventory adjustments over time. It provides a balanced view of the inventory adjustments and allows for better decision-making regarding inventory management and forecasting.

Submit
44. Blanket Purchase Agreements (BPA) are not contracts but merely advance agreements for future contractual undertakings.

Explanation

A Blanket Purchase Agreement (BPA) is a type of agreement between a buyer and a seller that establishes the terms and conditions for future purchases. It is not considered a contract because it does not bind either party to specific obligations or deliverables. Instead, it serves as an advance agreement or framework for future contractual undertakings. Therefore, the statement that BPAs are not contracts but merely advance agreements for future contractual undertakings is true.

Submit
45. The Illustrated parts breakdown (IPB) is the TO series used most by CE Material Acquisition personnel.

Explanation

The Illustrated Parts Breakdown (IPB) is a series of Technical Orders (TO) that is primarily used by CE Material Acquisition personnel. This suggests that the IPB is a commonly utilized resource for these personnel when it comes to acquiring materials. Therefore, the statement is true.

Submit
46. User Manuals usually offer the level of detail as TOs.

Explanation

User Manuals typically do not offer the same level of detail as Technical Orders (TOs). TOs are comprehensive documents that provide detailed instructions, specifications, and procedures for operating and maintaining equipment or systems. User Manuals, on the other hand, are usually more simplified and user-friendly, focusing on providing basic instructions and information for users to understand and operate a product. Therefore, the statement that User Manuals offer the same level of detail as TOs is false.

Submit
47. Filling out a DSW. If the request is for a general or colonel's housing quarters "General/senior officer "O-6" field (GENQTRS). What letter is used?

Explanation

The correct answer is "G" or "S". This is because "G" stands for General and "S" stands for Senior Officer. In the context of the question, if the request is for a general or colonel's housing quarters, the letter "G" or "S" would be used to indicate the type of housing quarters being requested.

Submit
48. What training method is used for a planned performance by a trainer of physical or motor skill, a scientific principle, or an experiment?

Explanation

The demonstration method is used for a planned performance by a trainer of physical or motor skill, a scientific principle, or an experiment. This method involves showing or illustrating how something is done or how a concept works. It allows the trainer to visually and practically demonstrate the desired skills or principles to the learners, enabling them to observe and understand the correct techniques or procedures. This method is effective in enhancing learning and retention as it provides a concrete example for learners to follow and imitate.

Submit
49. Reconstitution. Who must coordinate with all contractors to make sure all negotiated agreements are complete or terminated before leaving the deployment site?

Explanation

Contracting officers are responsible for coordinating with all contractors to ensure that all negotiated agreements are either completed or terminated before leaving the deployment site. They have the authority and knowledge to oversee and manage contractual obligations, ensuring that all parties fulfill their obligations and that any unfinished agreements are properly resolved. Their role is crucial in maintaining the integrity of the contracting process and ensuring that all contractual requirements are met.

Submit
50. When do you use handwritten labels on bins?

Explanation

Handwritten labels on bins are used when relocating items to new locations. This is because handwritten labels can easily be changed or updated as needed during the relocation process. Unlike printed labels, which may require additional time and resources to create and replace, handwritten labels offer a flexible and convenient solution for identifying the contents of bins during the moving process. Additionally, using handwritten labels allows for quick and easy identification of items in their new locations, ensuring efficient organization and retrieval.

Submit
51. Cost Centers. Which cost centers is used to report daily labor for the bulk of the operations flight? 

Explanation

ATA stands for Air Transport Association. It is used as a cost center to report daily labor for the bulk of the operations flight. This means that ATA is responsible for tracking and reporting the labor costs associated with the majority of the flight operations.

Submit
52. Building the IWP. In foreign countries, national holidays may be different from US holidays so the number of work days do not vary.

Explanation

The explanation for the correct answer, which is False, is that the statement is incorrect. In foreign countries, national holidays may indeed be different from US holidays, which can result in a variation in the number of work days.

Submit
53. Accountable listings and lost documents. Only those documents requiring signatures for audit purposes must be recreated.

Explanation

This statement suggests that accountable listings and lost documents should be recreated only if they require signatures for audit purposes. This implies that not all lost documents need to be recreated, only those that are necessary for audit trails and accountability. Therefore, the answer is true, indicating that only specific documents requiring signatures for audit purposes should be recreated.

Submit
54. In-check quality control. Off-loading. During off leading, there are four things that you need to check. What are they?

Explanation

During off-loading, four things need to be checked: the bill of lading, shipping label, transportation control number, and obvious damage. These checks are important to ensure that the correct items are being off-loaded, that they are being transported to the correct location, and that there is no damage that could affect the quality of the goods. The answer choice "Bill of lading, Shipping label, Transportation control number, Obvious damage" includes all the necessary checks.

Submit
55. Self Help program is a "high priority" project which is an excellent way for organizations to do some important "people projects".

Explanation

The statement suggests that a self-help program is a "high priority" project and an excellent way for organizations to focus on important "people projects." However, the correct answer is false because the statement does not provide enough information to determine whether a self-help program is indeed a high priority or an excellent way for organizations to prioritize people projects.

Submit
56. Report of Discrepancy. What form is used for reporting discrepancies caused by the shipper?

Explanation

The SF 364 form is used for reporting discrepancies caused by the shipper. This form is commonly used in the military and government agencies to document and report any discrepancies or issues with shipments. It allows the shipper to provide detailed information about the discrepancy, including the type of discrepancy, the date and time it occurred, and any supporting documentation or evidence. This form helps ensure that any discrepancies are properly recorded and addressed, allowing for a more efficient resolution process.

Submit
57. What is used to designate a position associated with an equipment item in their AFSC?

Explanation

Suffixes are used to designate a position associated with an equipment item in their AFSC. Suffixes are added to the AFSC (Air Force Specialty Code) to provide further specificity and detail about the position or job within that code. They help to differentiate between different positions or roles within the same AFSC, allowing for more precise identification and assignment of individuals to specific duties or responsibilities.

Submit
58. How many types of storage facilities are there?

Explanation

There are two types of storage facilities.

Submit
59. Firming a BOM. A BOM may be firmed more than once.

Explanation

The statement suggests that it is possible to firm a Bill of Materials (BOM) more than once. Firming a BOM refers to the process of finalizing and locking the BOM to prevent any further changes. This can be done multiple times if there is a need to make additional adjustments or updates to the BOM. Therefore, the answer "True" indicates that it is indeed possible to firm a BOM more than once.

Submit
60. What is the primary goal of the Environmental Compliance Assessment and Management Program?

Explanation

The primary goal of the Environmental Compliance Assessment and Management Program is to improve environmental management, which in turn helps in meeting environmental compliance. This means that the program aims to enhance the way environmental issues are managed, ensuring that all regulations and standards are met. By improving environmental management practices, the program contributes to the overall goal of achieving and maintaining environmental quality. This includes protecting human life and the environment, as well as ensuring compliance with pollution control standards.

Submit
61. On a AF Form 332 what Block is the Justification for work to be accomplished on?

Explanation

On an AF Form 332, Block 9 is the block where the justification for work to be accomplished is provided. This block allows the individual to explain the reasons or rationale behind the work that needs to be done. It provides an opportunity to provide necessary details and information that support the need for the requested work.

Submit
62. It is the Material Acquisition's responsibility to monitor BPAs.

Explanation

The statement implies that Material Acquisition is responsible for monitoring BPAs (Blanket Purchase Agreements). This suggests that it is indeed the responsibility of Material Acquisition to oversee and manage these agreements. Therefore, the correct answer is True.

Submit
63. Air Force Civil Engineer Support Agency (AFCESA) How many staff experts make up AFCESA and are in civil engineering and civil engineering support?

Explanation

AFCESA is composed of 300 staff experts who specialize in civil engineering and civil engineering support.

Submit
64. In what month does AFCESA issue a call letter to MAJCOMs each year?

Explanation

AFCESA issues a call letter to MAJCOMs each year in January. This suggests that January is the specific month when this action takes place.

Submit
65. Force protection beddown planning. War and Mobilization Plan (WMP) volume 1 provides a _________________for Air Force planning and support of combat forces in a time of war.

Explanation

The correct answer is "single source." This means that the War and Mobilization Plan (WMP) volume 1 is the only source available for Air Force planning and support of combat forces in a time of war. It implies that there is no other document or reference that provides the same level of comprehensive information and guidance for force protection beddown planning.

Submit
66. What are the two basic methods for Abatement when used concurrently, have proven most effective in LBP abatement projects?

Explanation

Dry and Wet Cleaning are the two basic methods for Abatement that, when used concurrently, have proven most effective in LBP abatement projects. Dry cleaning involves using specialized equipment to remove dust and debris without the use of water, while wet cleaning involves using water and cleaning agents to thoroughly clean surfaces. By combining these two methods, the risk of lead exposure is minimized as dry cleaning removes loose particles and wet cleaning removes any remaining lead dust or residue. This comprehensive approach ensures a thorough and effective abatement process.

Submit
67. What type of support agreement administered by the AF supports non-DOD activities (i.e., Army Corps of Engineers, located on an AF installation)?

Explanation

Intragovernmental agreements are a type of support agreement administered by the Air Force that supports non-DOD activities such as the Army Corps of Engineers, which may be located on an Air Force installation. These agreements involve cooperation and support between different government agencies or departments, in this case, the Air Force and non-DOD entities.

Submit
68. Recall procedures and pyramid alerting. Which recall procedure is used during loss of all normal communications?

Explanation

During a loss of all normal communications, the recall procedure used is the Comm-out recall. This procedure is activated when there is a complete failure of communication systems, and it ensures that all personnel are alerted and brought to a central location. It is designed to address emergency situations when regular communication channels are unavailable, allowing for effective coordination and response.

Submit
69. What Major AF Account Code category is Military Family Housing? 

Explanation

Military Family Housing is categorized under the Major AF Account Code category 70000. This category specifically pertains to expenses related to providing housing for military families.

Submit
70. Contamination. There are four general categories of chemical warfare agents; nerve, blister, blood, and chocking agents. Which chemical agent when inhaled, act rapidly, with symptons developing within one or two minutes; when absorbed throgh undamaged skin, symptoms are slower to develop, but equally deadly?

Explanation

Nerve agents are chemical warfare agents that can act rapidly when inhaled, with symptoms developing within one or two minutes. When absorbed through undamaged skin, the symptoms are slower to develop but equally deadly. Blister agents, blood agents, and choking agents do not exhibit these specific characteristics of rapid onset and delayed symptoms through skin absorption. Therefore, the correct answer is nerve agent.

Submit
71. Validating receipts. Nothing received in a sealed container requires opening for item verification since most depots furnish all the necessary information for processing on the outer container.

Explanation

The explanation for the given correct answer, which is True, is that validating receipts for items in sealed containers does not require opening the container for verification. This is because most depots provide all the necessary information for processing on the outer container itself. Therefore, it is not necessary to open the sealed container to verify the items inside.

Submit
72. Government Purchase Card (GPC) may not be used to purchase authorized supplies, equipment, and non-personal services up to the micro-purchase threshold (currently $2500).

Explanation

The statement is false because Government Purchase Cards (GPC) are specifically designed to be used for purchasing authorized supplies, equipment, and non-personal services up to the micro-purchase threshold of $2500.

Submit
73. Unexploded ordanance. Prime Beef personnel receive annual training in explosive ordanance reconnaissance (EOR). One tasking for Prime BEEF people is to remove safe unexploded ordance from work areas.

Explanation

The given statement suggests that Prime Beef personnel receive annual training in explosive ordnance reconnaissance (EOR) and one of their tasks is to remove safe unexploded ordnance from work areas. Therefore, the statement is true.

Submit
74. In Minor Construction, if the statutory limit of $500,000 is exceeded who gives the approval to proceed with construction?

Explanation

HQ USAF/ILE gives the approval to proceed with construction if the statutory limit of $500,000 is exceeded in Minor Construction.

Submit
75. Project codes are three-position alphanumeric codes used to identify special projects. what position numbers are used for the project codes?

Explanation

The project codes are identified using three-position alphanumeric codes, and the position numbers used for these codes are 57-59.

Submit
76. What is a detailed manpower listing reflecting authorizations or slots by work center?

Explanation

A detailed manpower listing reflecting authorizations or slots by work center is called the Unit Manpower Document (UMD). This document provides information about the authorized positions within a unit and the specific work centers where these positions are located. It helps in managing and organizing the personnel within the unit by providing a clear structure of the manpower requirements. The UMD is an important tool for unit leaders to ensure that they have the necessary personnel in each work center to effectively carry out their mission.

Submit
77. Scheduling reports and listings. IWIMS, end of session (EOS) process is not a part of CEMAS, it does have a significant impact on CEMAS.

Explanation

The statement is true because even though the end of session (EOS) process is not a part of CEMAS, it still has a significant impact on CEMAS. This suggests that the scheduling of reports and listings in IWIMS, along with the EOS process, affects CEMAS in some way.

Submit
78. Locating non-bill of material line items. Line item requisitions are processed in CEMAS by program MPOFUDLI which you use when ordering items for non BOM work ordrs only.

Explanation

The given statement explains that the program MPOFUDLI is used in CEMAS to process line item requisitions for non-bill of material (BOM) work orders only. This implies that the program is not used for processing line item requisitions for BOM work orders. Therefore, the statement is true.

Submit
79. In what contingency training tier does hands-on training in field sanitation belong to? 

Explanation

Hands-on training in field sanitation belongs to Tier 1 contingency training. This tier focuses on basic training and skills that are essential for all personnel. Field sanitation is a fundamental aspect of military operations, ensuring the health and well-being of personnel in the field. Therefore, it is included in the foundational training provided in Tier 1.

Submit
80. The Air Force Vehicle and Equipment Management Support Office (VEMSO), is and ___________ support agency that collects, drafts, creates, monitors, and reports on vehicle and equipment issues addressed above the MAJCOM level.

Explanation

HQ AF/A4L is the correct answer because it is the office responsible for providing support in managing and addressing vehicle and equipment issues above the MAJCOM level. The other options listed are not relevant to this specific task.

Submit
81. There are the 3 key elements to developing and evaluation program: Process, Product & ___________

Explanation

The question is asking for the missing key element in developing and evaluating a program. The correct answer is "Satisfaction". This is because when developing and evaluating a program, it is important to consider the satisfaction of the individuals or stakeholders involved. By ensuring that the program meets their needs and expectations, it is more likely to be successful. Additionally, measuring and evaluating satisfaction can provide valuable insights for improvement and future development of the program.

Submit
82. What is the correct acronym for CATEX? 

Explanation

The correct acronym for CATEX is Categorical Exclusions. This term refers to the process of excluding certain activities or projects from the requirement of undergoing an environmental review. Categorical exclusions are typically used when the potential impacts of a project are deemed to be minimal or when the project falls under a specific category that has been predetermined to not have significant environmental effects.

Submit
83. What LUC is used for Operations and Services work?

Explanation

LUC 19 is used for Operations and Services work.

Submit
84. Forward Store. What work order number is used for the forward store?

Explanation

The work order number used for the forward store is 00021.

Submit
85. Erecting the small shelter system. The SSS is designed to provide for an extended set-up of ___ years with a shelf life of ___ years.

Explanation

The correct answer is 10, 20. This means that the small shelter system (SSS) is designed to be set up for 10 years and has a shelf life of 20 years. This implies that the SSS is durable and can withstand the elements for a long period of time, making it a reliable and long-lasting shelter option.

Submit
86. Procedures or detailed "how-to" instructions are found in AFPDs.

Explanation

The statement suggests that procedures or detailed "how-to" instructions are found in AFPDs. However, the correct answer is false. This means that procedures or detailed instructions are not found in AFPDs. The explanation implies that AFPDs do not contain step-by-step instructions or detailed procedures.

Submit
87. Work areas can be used as storage areas that include receiving and distribution bays, property inspection floor space, vehicle parking areas, offices, and break rooms.

Explanation

The statement is false because work areas are not typically used as storage areas. While work areas may include receiving and distribution bays, property inspection floor space, vehicle parking areas, offices, and break rooms, they are primarily designated for carrying out specific tasks and activities related to work, rather than for storage purposes.

Submit
88. CE UTCs. How many UTCs are there for a traditional engineering and operations CE personnel?

Explanation

The correct answer is 18 because traditional engineering and operations CE personnel typically work in shifts, and the term "UTC" refers to Coordinated Universal Time, which is used as a standard time reference in the aviation industry. Therefore, there are 18 UTCs for these personnel, indicating that they work in 18 different time zones around the world.

Submit
89. To make a positive image requires investing time and patience.

Explanation

Making a positive image does not necessarily require investing time and patience. It can be achieved through various other means such as effective communication, building good relationships, delivering quality work, and maintaining a positive attitude. Time and patience may be important in certain situations, but they are not always the only factors involved in creating a positive image. Therefore, the statement is false.

Submit
90. To perform inquiries on Bill of Materials, what PF key is selected?  "Bill of Material Program from the Material Acquisition Management (MENU-2) screen.

Explanation

To perform inquiries on the Bill of Materials, the PF key selected is PF 6.

Submit
91. What form is used to initiate the recurring work program?

Explanation

AF Form 1841 is used to initiate the recurring work program.

Submit
92. Types of resources. We put assets or resources into how many categories?

Explanation

The question asks how many categories assets or resources are put into. The correct answer is 3. This suggests that assets or resources are classified into three distinct categories. The question does not provide any further information about what these categories are or how they are defined.

Submit
93. Responsibilities. Who is in the best position to decide what functions and actions he or she deems necessary to sustain the mission during these times when the system is in operable.

Explanation

The ELRS Commander/AO is in the best position to decide what functions and actions are necessary to sustain the mission during times when the system is inoperable. This is because the ELRS Commander/AO is responsible for logistics and supply chain management, which includes ensuring that necessary resources are available to support the mission. They have the knowledge and expertise to assess the situation and make informed decisions on what actions need to be taken to sustain the mission effectively.

Submit
94. Preparing performance work statements (PWS) consist of 5 sections: Description of Services, Service Delivery Summary (SDS), Government Furnished Property and Services, _________ _____________, and Appendix(s).

Explanation

The correct answer is "General Information" because it is one of the sections that make up the Preparing performance work statements (PWS). The other sections mentioned in the question are Description of Services, Service Delivery Summary (SDS), Government Furnished Property and Services, and Appendix(s). General Information is likely to contain overall information about the project or contract, such as contact details, project timelines, and any other relevant information that does not fit into the other sections.

Submit
95. The CEMAS has a one way interface with the SBSS. CEMAS receives transactions from Base Supply using an electronic interface, known as the _____ Interface.

Explanation

The correct answer is D10. The question states that CEMAS has a one-way interface with the SBSS, and it receives transactions from Base Supply using an electronic interface. The missing term is the name of this electronic interface, which is referred to as the D10 Interface.

Submit
96. What Local Purchase Status Codes is used to indicate that cancellation action cannot be accomplished. Item will remain on order and will require receipt.

Explanation

Local Purchase Status Code B8 is used to indicate that cancellation action cannot be accomplished. This means that if an item has this status code, it cannot be canceled and will remain on order. The item will still need to be received as originally planned.

Submit
97. Collecting, analyzing, and submitting situation reports. The superintendant or delegate is responsible for timely and accurate SITREP reporting.

Explanation

The statement is false because the responsibility for collecting, analyzing, and submitting situation reports does not lie with the superintendent or delegate. It is unclear who is responsible for this task, as the question does not provide that information.

Submit
98. In-Service Work Plan (IWP) projects past hours for each shop based on assigned personnel and estimated hours for each type of work based on historical labor data and pre-idendified work.

Explanation

The given statement is false. The In-Service Work Plan (IWP) projects future hours for each shop based on assigned personnel and estimated hours for each type of work. It does not reflect past hours or historical labor data.

Submit
99. The IMPAC Material Transactions (CWM) screen is used for input of costs associated with IMPAC material purchases whe CEMAS requisitioning processes were used.

Explanation

The given statement is false. The IMPAC Material Transactions (CWM) screen is not used for input of costs associated with IMPAC material purchases when CEMAS requisitioning processes were used.

Submit
100. The SF022-302, Final Close out Report is generated when a BOM is closed and there are no pending material transactions.

Explanation

The SF022-302, Final Close out Report is not generated when a BOM is closed and there are no pending material transactions.

Submit
View My Results

Quiz Review Timeline (Updated): Mar 21, 2023 +

Our quizzes are rigorously reviewed, monitored and continuously updated by our expert board to maintain accuracy, relevance, and timeliness.

  • Current Version
  • Mar 21, 2023
    Quiz Edited by
    ProProfs Editorial Team
  • Oct 17, 2012
    Quiz Created by
    Duane0527
Cancel
  • All
    All (100)
  • Unanswered
    Unanswered ()
  • Answered
    Answered ()
Researching transaction histories. Researching the transaction history...
Monthly labor analysis reports compared overtime, provide aht...
Air Force incident management system (AFSIMS) was developed to ensure...
Geo BEST system provides a means to lay out a tent city or industrial...
Operating the UCC. The CE UCC is usualy maintained by what flight?
Personnel accountability.What is the Air Force's number one...
Storage level. The fourth part of the warehouse location is the level...
Posturing Ce mobility teams. The Air Force presents its forces via an...
Military Interdepartmenal Prchase Request (MIPR). The acceptance of a...
Discrepancy Categories. The inventory process involves collecting and...
Engineering technical letters (ETL) provides specific design guidance,...
Performing inventory adjustments. Only personnel with inventory...
Non-CEMAS receipts. Documents that authorize individuals to receive...
Air Force Contract Augmentation Program (AFCAP) is a civilian contract...
CEMAS Inquiries. Nouns are uniquely identified by ___________...
What would be the Type of service (TYPESVC) when there are other...
LMR Principles. Radio waves travel through free space at the speed of...
CerTest replaces hands on training.
The Instalation control center (ICC) communicates directions and...
Managing the Noun Dictionary. If a noun inquiry is performed for the...
Updating work status. The status of work in progress must be updated...
AF Form 9 is typicall used for non-recurring requests.
What flight is responsible for the overall maintenance of the customer...
Variance analysis is the logical evaluation of the reasons for...
What AF Form is used primarly as an approval document for work to be...
When a AF Form 332 is prepared how many copies does it come with?
Time compliance technical orders (TCTO) are issued to correct unsafe...
When it becomes necessary to remove a noun record from the Noun...
The SBSS Due-out Validation File (MM09) is used by CEMAS to update...
Holding  Area Issue Selection. The holding area issue selection...
A cost account code is also known as an AF Account Code. T/F
Assignment and use of freeze codes. Freeze codes are assigned to an...
The job qualification standard (JQS) screen is where your supervisor...
In an absence of a computer system, what form do you use to authorize...
Foreign currency. While operating in a foreign country, te preferred...
Which Material Acquisition operation will always use GPC to purcase...
The System Interface File (MSYS) file provides a record which contains...
Prime BEEF pallets. What is needed to pack and load the equipment and...
Which Regulatory Publications attempts to reduce fires and other...
Who obligates the the government to a contractual agreement?
Hazardous waste management program...
Performing Inventory. Which inventory is discovered outside the...
Inventory adjustment analysis. Trend charts are prepared and...
Blanket Purchase Agreements (BPA) are not contracts but merely advance...
The Illustrated parts breakdown (IPB) is the TO series used most by CE...
User Manuals usually offer the level of detail as TOs.
Filling out a DSW. If the request is for a general or colonel's...
What training method is used for a planned performance by a trainer of...
Reconstitution. Who must coordinate with all contractors to make sure...
When do you use handwritten labels on bins?
Cost Centers. Which cost centers is used to report daily labor for the...
Building the IWP. In foreign countries, national holidays may be...
Accountable listings and lost documents. Only those documents...
In-check quality control. Off-loading. During off leading, there are...
Self Help program is a "high priority" project which is an...
Report of Discrepancy. What form is used for reporting discrepancies...
What is used to designate a position associated with an equipment item...
How many types of storage facilities are there?
Firming a BOM. A BOM may be firmed more than once.
What is the primary goal of the Environmental Compliance Assessment...
On a AF Form 332 what Block is the Justification for work to be...
It is the Material Acquisition's responsibility to monitor BPAs.
Air Force Civil Engineer Support Agency (AFCESA)...
In what month does AFCESA issue a call letter to MAJCOMs each year?
Force protection beddown planning. War and Mobilization Plan (WMP)...
What are the two basic methods for Abatement when used concurrently,...
What type of support agreement administered by the AF supports non-DOD...
Recall procedures and pyramid alerting. Which recall procedure is used...
What Major AF Account Code category is Military Family Housing? 
Contamination. There are four general categories of chemical warfare...
Validating receipts. Nothing received in a sealed container requires...
Government Purchase Card (GPC) may not be used to purchase authorized...
Unexploded ordanance. Prime Beef personnel receive annual training in...
In Minor Construction, if the statutory limit of $500,000 is exceeded...
Project codes are three-position alphanumeric codes used to identify...
What is a detailed manpower listing reflecting authorizations or slots...
Scheduling reports and listings. IWIMS, end of session (EOS) process...
Locating non-bill of material line items. Line item requisitions are...
In what contingency training tier does hands-on training in field...
The Air Force Vehicle and Equipment Management Support Office (VEMSO),...
There are the 3 key elements to developing and evaluation program:...
What is the correct acronym for CATEX? 
What LUC is used for Operations and Services work?
Forward Store. What work order number is used for the forward store?
Erecting the small shelter system. The SSS is designed to provide for...
Procedures or detailed "how-to" instructions are found in...
Work areas can be used as storage areas that include receiving and...
CE UTCs. How many UTCs are there for a traditional engineering and...
To make a positive image requires investing time and patience.
To perform inquiries on Bill of Materials, what PF key is...
What form is used to initiate the recurring work program?
Types of resources. We put assets or resources into how many...
Responsibilities. Who is in the best position to decide what functions...
Preparing performance work statements (PWS) consist of...
The CEMAS has a one way interface with the SBSS. CEMAS receives...
What Local Purchase Status Codes is used to indicate that cancellation...
Collecting, analyzing, and submitting situation reports. The...
In-Service Work Plan (IWP) projects past hours for each shop based on...
The IMPAC Material Transactions (CWM) screen is used for input of...
The SF022-302, Final Close out Report is generated when a BOM is...
Alert!

Advertisement