  • 1. 

    The third phase of an architect's regular services.

    • A.

      Contract documents phase

    • B.

      Pre-design services

    • C.

      Specialized allied services

    • D.

      General conditions

    Correct Answer
    A. Contract documents phase
  • 2. 

    Project financing falls under what kind of service of the architect.

    • A.

      Contract documents phase

    • B.

      Pre-design services

    • C.

      Specialized allied services

    • D.

      General conditions

    Correct Answer
    B. Pre-design services
  • 3. 

    Comprehensive planning falls under what service of the architect.

    • A.

      Contract documents phase

    • B.

      Pre-design services

    • C.

      Specialized allied services

    • D.

      General conditions

    Correct Answer
    C. Specialized allied services
  • 4. 

    The fee of the architect for design-build services on a guaranteed maximum cost aside from his fee for regular design services.

    • A.

      12%

    • B.

      15%

    • C.

      10%

    • D.

      14%

    Correct Answer
    C. 10%
  • 5. 

    What percentage of an architect's work is liability under the civil code.

    • A.

      12%

    • B.

      15%

    • C.

      10%

    • D.

      14%

    Correct Answer
    C. 10%
  • 6. 

    For interior design services, the architect shall be paid what percentage of the fee upon  submission of the final design.

    • A.

      55%

    • B.

      60%

    • C.

      75%

    • D.

      50%

    Correct Answer
    D. 50%
  • 7. 

    When the owner fails to implement the plans and documents for construction as prepared by the architect, the architect is entitled to receive what percentage of his fee.

    • A.

      80%

    • B.

      85%

    • C.

      70%

    • D.

      75%

    Correct Answer
    B. 85%
  • 8. 

    The minimum fee per appearance of an architect when rendering service as an expert  witness shall be

    • A.

      PHP 200.00

    • B.

      PHP 500.00

    • C.

      PHP 400.00

    • D.

      PHP 300.00

    Correct Answer
    B. PHP 500.00
  • 9. 

    The minimum basic fee for specialized decorative building.

    • A.

      12%

    • B.

      20%

    • C.

      15%

    • D.

      18%

    Correct Answer
    A. 12%
  • 10. 

    The minimum basic fee for industrial buildings with a project cost below 50 million pesos.

    • A.

      16%

    • B.

      6%

    • C.

      26%

    • D.

      36%

    Correct Answer
    B. 6%
  • 11. 

    The minimum basic fee for hospitals with a project cost below 50 million pesos.

    • A.

      8%

    • B.

      10%

    • C.

      12%

    • D.

      16%

    Correct Answer
    A. 8%
  • 12. 

    In design-build services, the single-point-responsibility of project delivery puts the legal liability for both the design and construction on the.

    • A.

      Architect

    • B.

      Contractor

    • C.

      Engineer

    • D.

      Owner

    Correct Answer
    A. Architect
  • 13. 

    The release of 10% retention by the owner shall be done after how many months from  the date of final payment.

    • A.

      2 months

    • B.

      3 months

    • C.

      4 months

    • D.

      5 months

    Correct Answer
    B. 3 months
  • 14. 

    Printed documents stipulating the procedural and administrative aspect of the contract.

    • A.

      Contract documents phase

    • B.

      Pre-design services

    • C.

      Specialized allied services

    • D.

      General conditions

    Correct Answer
    D. General conditions
  • 15. 

    An outline specification enumerating the type and trade names of materials to be used.

    • A.

      Certificate of payment

    • B.

      Schedule of material and finishes

    • C.

      Quotation

    • D.

      Performance bond

    Correct Answer
    B. Schedule of material and finishes
  • 16. 

    A price given by a contractor, sub-contractor, material supplier or vendor to furnish materials, labor or both.

    • A.

      Certificate of payment

    • B.

      Schedule of material and finishes

    • C.

      Quotation

    • D.

      Performance bond

    Correct Answer
    C. Quotation
  • 17. 

    A statement from the architect confirming the amount of money due the contractor for work accomplished.

    • A.

      Certificate of payment

    • B.

      Schedule of material and finishes

    • C.

      Quotation

    • D.

      Performance bond

    Correct Answer
    A. Certificate of payment
  • 18. 

    A bond furnished by the contractor and his surety as a guarantee to execute the work in

    • A.

      Certificate of payment

    • B.

      Schedule of material and finishes

    • C.

      Quotation

    • D.

      Performance bond

    Correct Answer
    D. Performance bond
  • 19. 

    An offer to perform the work prescribed in a contract at a specified cost.

    • A.

      Bid

    • B.

      Invitation Bid

    • C.

      Bid Bulletin

    • D.

      Closed specification

    Correct Answer
    A. Bid
  • 20. 

    A list of instructions stipulating the manner on which bids are to be prepared.

    • A.

      Bid Bulletin

    • B.

      Instruction to bidders

    • C.

      Invitation Bid

    • D.

      Bid

    Correct Answer
    B. Instruction to bidders

Quiz Review Timeline +

Our quizzes are rigorously reviewed, monitored and continuously updated by our expert board to maintain accuracy, relevance, and timeliness.

  • Current Version
  • Jan 25, 2013
    Quiz Edited by
    ProProfs Editorial Team
  • May 28, 2011
    Quiz Created by
    MYLZ101