  • 1/30 Questions

    Control key used for internal Plant Maintenance operation

    • PM01
    • PM02
    • PM03
    • PM04
    • PM05
Please wait...
PM - Preventive Maintenance (Post-session) - Quiz

Quiz Preview

  • 2. 

    T. code used to know the reservation of component

    • IW41

    • IW29

    • IW21

    • IW32

    • None of the above

    Correct Answer
    A. IW32
  • 3. 

    What is item category in SAP "L" stands for?

    • Stock Item

    • Non Stock Item

    • Variable Size Item

    • Text Item

    • None of above

    Correct Answer
    A. Stock Item
  • 4. 

    What is maintenance plan category for Plan Maintenance ?

    • PM

    • MM

    • NO

    • PP

    • None of above

    Correct Answer
    A. PM
  • 5. 

    What Movement type is used for material movement from warehouse to maintenance order

    • 361

    • 261

    • 261K

    • 551

    • None of the above

    Correct Answer
    A. 261
  • 6. 

    What is mean by Maintenance Work center ?

    • Machines in the plant

    • Equipment in the Plant

    • Asset

    • People who are working from each dept.

    • None of above

    Correct Answer
    A. People who are working from each dept.
  • 7. 

    Order type "PM01" will be used for ..............?

    • Calibration Maintenance

    • Breakdown Maintenance

    • Preventive Maintenance

    • Refurbishment Process

    • None of above

    Correct Answer
    A. Preventive Maintenance
  • 8. 

    What is meaning of TECO

    • Total cost

    • Transaction code

    • Technical code

    • Technical completion

    • None of the above

    Correct Answer
    A. Technical completion
  • 9. 

    T. code is used to see Maintenance Scheduling overview list

    • IP01

    • IP02

    • IP03

    • IP24

    • None of the above

    Correct Answer
    A. IP24
  • 10. 

    Control key used for PM external service

    • PM01

    • PM02

    • PM03

    • PM04

    • PM05

    Correct Answer
    A. PM03
  • 11. 

    What is T. code for TECO

    • IW42

    • IP10

    • IW32

    • IP32

    • None of the above

    Correct Answer
    A. IW32
  • 12. 

    In Component Tab, what we need to add?

    • Material - Raw Material

    • Equipment

    • Equipment with Measuring Point

    • Material - Spares

    • None of above

    Correct Answer
    A. Material - Spares
  • 13. 

    T. Code is used to generate Refurbishment order ?

    • IW29

    • IW41

    • IP24

    • IW81

    • None of above

    Correct Answer
    A. IW81
  • 14. 

    For what purpose Control key "PM01" is used ?

    • Internal maintenance

    • Internal service

    • External maintenance

    • External service

    • None of above

    Correct Answer
    A. Internal maintenance
  • 15. 

    Maintenance Interval will get copied from....................to Maintenance Plan ?

    • Task List

    • Maintenance order

    • Equipment

    • Work Center

    • None of above

    Correct Answer
    A. Task List
  • 16. 

    T. code for Change Preventive maintenance order

    • IW32

    • IW41

    • IW29

    • IW22

    • None of the above

    Correct Answer
    A. IW32
  • 17. 

    To confirm operation of Preventive Maintenance, which T-code we will use?

    • IW32

    • IW41

    • IW22

    • IW81

    • None of above

    Correct Answer
    A. IW41
  • 18. 

    Reservation will be generated for below object in SAP?

    • Equipment

    • Component

    • Work center

    • Functional Location

    • None of above

    Correct Answer
    A. Component
  • 19. 

    Which order type is used for Refurbishment process?

    • PM01

    • PM02

    • PM03

    • PM04

    • None of above

    Correct Answer
    A. PM04
  • 20. 

    T-code to Issue Material against Reservation ?

    • MB1A

    • MB1B

    • MB1C

    • MB22

    • None of above

    Correct Answer
    A. MB1A
  • 21. 

    Equipment category "M" is stand for ?

    • Asset

    • Plant & Machinary

    • Building

    • Buildings

    • None of above

    Correct Answer
    A. Plant & Machinary
  • 22. 

    After which step actual cost will not come in Maintenance order?

    • Operation confirmation

    • Material issue

    • Material addition in Preventive Maintenance Order

    • Service Entry sheet

    • None of above

    Correct Answer
    A. Material addition in Preventive Maintenance Order
  • 23. 

    What do you mean by Functional Location

    • Department

    • Plant location

    • Physical location of equipment

    • Storage location

    • None of above

    Correct Answer
    A. Physical location of equipment
  • 24. 

    What is the object type ?

    • Equipment Description

    • Equipment group

    • Equipment unit

    • BOM

    • None of above

    Correct Answer
    A. Equipment group
  • 25. 

    T. code for Schedule maintenance plan

    • IP01

    • IP02

    • IP10

    • IA03

    • None of the above

    Correct Answer
    A. IP10
  • 26. 

    In Refurbishment process which T.code is used to bring material back to storage location (after refurbishment)?

    • IW8W

    • IW81

    • MB1A

    • MMBE

    • 18

    Correct Answer
    A. IW8W
  • 27. 

    Which T.code is used for order settlement ?

    • IP24

    • IW32

    • KO88

    • IW29

    • 12

    Correct Answer
    A. KO88
  • 28. 

    Preventive maintenance activity type key is

    • 001

    • 002

    • 003

    • 004

    • 005

    Correct Answer
    A. 002
  • 29. 

    Functional location category "M" is stand for ?

    • Asset system - Standard

    • Machine System - Standard

    • Technical system - standard

    • Stock Material

    • None of above

    Correct Answer
    A. Technical system - standard
  • 30. 

    T. code for Change and display list of maintenance order

    • IW32

    • IW38

    • IW29

    • IW22

    • None of the above

    Correct Answer
    A. IW38

Quiz Review Timeline (Updated): Mar 8, 2014 +

Our quizzes are rigorously reviewed, monitored and continuously updated by our expert board to maintain accuracy, relevance, and timeliness.

  • Current Version
  • Mar 08, 2014
    Quiz Edited by
    ProProfs Editorial Team
  • Mar 06, 2014
    Quiz Created by
    Rajesh2jsr
Back to Top Back to top
Advertisement