Monitoring Measurement And Recording Of Product Status

5 Questions | Attempts: 265
Share

SettingsSettingsSettings
Monitoring Measurement And Recording Of Product Status - Quiz

These questions test the knowledge of LSI's Monitoring Measurement and Recording of Product Status (D000364).


Questions and Answers
  • 1. 

    When performing incoming inspection of raw materials, what document takes precedence in determining what is to be measured and the appropriate specifications?

    • A.

      Drawing

    • B.

      Incoming Inspection Plan (IIP)

    • C.

      Supplier Contract

    • D.

      Purchase Order

    Correct Answer
    B. Incoming Inspection Plan (IIP)
  • 2. 

    Where are the acceptance or rejected labels applied when an incoming or in process inspection is completed?

    • A.

      On the Material Status Label

    • B.

      Anywhere on the container(s) of the raw material or parts

    • C.

      On the raw material or parts themselves

    • D.

      In the label approval binder

    Correct Answer
    A. On the Material Status Label
  • 3. 

    Line Clearances are performed at all sequences in the manufacturing process to ensure lot control is maintained for both product and components in accordance with the Product Identification and Traceability procedure.

    • A.

      True

    • B.

      False

    Correct Answer
    B. False
  • 4. 

    First Piece Inspection is required for all of the following, as determined by engineering (check all that apply):

    • A.

      Initial Setup or significant process changes for internally fabricated components

    • B.

      The beginning of each manufacturing lot of components

    • C.

      Initial receipt of new and custom purchased parts and materials

    • D.

      Significant revision to existing parts and materials

    • E.

      Standard catalog or off-the-shelf items not modified by LSI

    • F.

      First production lot of finished goods

    Correct Answer(s)
    A. Initial Setup or significant process changes for internally fabricated components
    C. Initial receipt of new and custom purchased parts and materials
    D. Significant revision to existing parts and materials

Quiz Review Timeline +

Our quizzes are rigorously reviewed, monitored and continuously updated by our expert board to maintain accuracy, relevance, and timeliness.

  • Current Version
  • Mar 21, 2022
    Quiz Edited by
    ProProfs Editorial Team