Monitoring Measurement and Recording Of Product Status

5 Questions | Attempts: 265
Please wait...
Question 1 / 6
🏆 Rank #--
Score 0/100

1. Match the product status sticker type to the color: 

Submit
Please wait...
About This Quiz
Monitoring Measurement and Recording Of Product Status - Quiz

These questions test the knowledge of LSI's Monitoring Measurement and Recording of Product Status (D000364).

2.

What first name or nickname would you like us to use?

You may optionally provide this to label your report, leaderboard, or certificate.

2. Where are the acceptance or rejected labels applied when an incoming or in process inspection is completed?

Submit

3. When performing incoming inspection of raw materials, what document takes precedence in determining what is to be measured and the appropriate specifications?

Submit

4. Line Clearances are performed at all sequences in the manufacturing process to ensure lot control is maintained for both product and components in accordance with the Product Identification and Traceability procedure.

Submit

5. First Piece Inspection is required for all of the following, as determined by engineering (check all that apply):

Submit
×
Saved
Thank you for your feedback!
View My Results
Cancel
  • All
    All (5)
  • Unanswered
    Unanswered ()
  • Answered
    Answered ()
Match the product status sticker type to the color: 
Where are the acceptance or rejected labels applied when an incoming...
When performing incoming inspection of raw materials, what document...
Line Clearances are performed at all sequences in the manufacturing...
First Piece Inspection is required for all of the following, as...
play-Mute sad happy unanswered_answer up-hover down-hover success oval cancel Check box square blue
Alert!