Monitoring Measurement And Recording Of Product Status

5 Questions | Total Attempts: 263

SettingsSettingsSettings
Monitoring Measurement And Recording Of Product Status - Quiz

These questions test the knowledge of LSI's Monitoring Measurement and Recording of Product Status (D000364).


Questions and Answers
  • 1. 
    When performing incoming inspection of raw materials, what document takes precedence in determining what is to be measured and the appropriate specifications?
    • A. 

      Drawing

    • B. 

      Incoming Inspection Plan (IIP)

    • C. 

      Supplier Contract

    • D. 

      Purchase Order

  • 2. 
    Where are the acceptance or rejected labels applied when an incoming or in process inspection is completed?
    • A. 

      On the Material Status Label

    • B. 

      Anywhere on the container(s) of the raw material or parts

    • C. 

      On the raw material or parts themselves

    • D. 

      In the label approval binder

  • 3. 
    Line Clearances are performed at all sequences in the manufacturing process to ensure lot control is maintained for both product and components in accordance with the Product Identification and Traceability procedure.
    • A. 

      True

    • B. 

      False

  • 4. 
    First Piece Inspection is required for all of the following, as determined by engineering (check all that apply):
    • A. 

      Initial Setup or significant process changes for internally fabricated components

    • B. 

      The beginning of each manufacturing lot of components

    • C. 

      Initial receipt of new and custom purchased parts and materials

    • D. 

      Significant revision to existing parts and materials

    • E. 

      Standard catalog or off-the-shelf items not modified by LSI

    • F. 

      First production lot of finished goods

Back to Top Back to top