2a674 Volume 1 CDC Ure

53 Questions | Total Attempts: 566

SettingsSettingsSettings
Please wait...
2a674 Volume 1 CDC Ure

Questions and Answers
  • 1. 
    (001) Who is responsible for appointing a maintenance group (MXG) technical order custodian to administer technical order requirements of assigned MXG missions
    • A. 

      Maintenance squadron commander

    • B. 

      MXG deputy commander 

    • C. 

      MXG superintendent

    • D. 

      MXG commander

  • 2. 
    (001) Which is not normally a maintenance group (MXG) technical order distribution office (TODO) duty?
    • A. 

      Supervising technical order administrative services being provided by lower-level TODOs in the MXG. 

    • B. 

      Maintaining physical media technical order libraries/electronic technical orders (eTO)/electronic Tools (eTools). 

    • C. 

      Assisting organizations within the MXG to establish additional TODO accounts. 

    • D. 

      Advising the MXG commander on technical order availability. 

  • 3. 
    (002) What type of time change technical order (TCTO) is issued when unsafe conditions, if not corrected, could result in serious or fatal personal injury?
    • A. 

      Urgent action. 

    • B. 

      Routine action. 

    • C. 

      Immediate action. 

    • D. 

      Emergency action 

  • 4. 
    (002) What type of time change is technical order (TCTO) issued when a deficiency could result in injury to personnel, damage to property, or unacceptable reductions in combat efficiency?
    • A. 

      Urgent action. 

    • B. 

      Routine action. 

    • C. 

      Immediate action. 

    • D. 

      Emergency action. 

  • 5. 
    (002) If the deficiencies in an urgent action time change technical order (TCTO) are not corrected within the specified time limit, what action(s) must be taken?
    • A. 

      Remove the aircraft or equipment from service. 

    • B. 

      Have a qualified 7-skill level clear the deficiency in the forms. 

    • C. 

      Make a NOTE in the equipment forms and delay the discrepancy. 

    • D. 

      Delay the discrepancy and downgrade the TCTO to routine action. 

  • 6. 
    (002) Which type of time change technical order (TCTO) is issued when material, mechanical, operational, or tactical deficiencies occur which could result in conditions that reduce the operational life of equipment?
    • A. 

      Emergency action. 

    • B. 

      Immediate action. 

    • C. 

      Routine action. 

    • D. 

      Urgent action.

  • 7. 
    7. (002) Who is responsible for ensuring that accurate documentation of time compliance technical orders (TCTO) is made upon completing the inspection or modification procedures outlined in the TCTO?
    • A. 

      Flight or section supervisor

    • B. 

      Maintenance group superintendent.

    • C. 

      Plans, scheduling, and documentation.

    • D. 

      Technical order distribution office custodian.

  • 8. 
    8. (003) Who is given broad discretionary powers to waive compliance with technical order procedures in emergency situations?
    • A. 

      Major command (MAJCOM) commander.

    • B. 

      Air force safety center commander.

    • C. 

      Quality assurance chief.

    • D. 

      On-scene commander.

  • 9. 
    9. (003) Within Air Force Materiel Command (AFMC), who has the overall responsibility for Air Force policy governing the technical order system?
    • A. 

      A4BM.

    • B. 

      A4MT.

    • C. 

      A4F.

    • D. 

      A4YE.

  • 10. 
    10. (003) Which of the following is not an approved communication method for issuing approved technical order waivers or deviations?
    • A. 

      Telephone.

    • B. 

      Signed letter.

    • C. 

      Organizational e-mail.

    • D. 

      Defense Message System 

  • 11. 
    11.(004) The Air Force supply system is different from civilian supply systems because it
    • A. 

      Is not as concerned with the economy of operation.

    • B. 

      Receives its supplies from many different vendors.

    • C. 

      Is not as concerned with the constantly changing needs of its customers.

    • D. 

      Deals with thousands of customers worldwide and requires more flexibility.

  • 12. 
    12.(005) Which system allows logistics personnel, customers, and commanders to track every item in the supply system through standardized procedures?
    • A. 

      Standard base supply system (SBSS).

    • B. 

      Bench stock management system (BSMS).

    • C. 

      Maintenance supply interface system (MSIS).

    • D. 

      Core Automated Maintenance System (CAMS).

  • 13. 
    13.(005) Which supply element is the first point in the process of obtaining material from supply?
    • A. 

      Retail sales.

    • B. 

      Customer service.

    • C. 

      Demand processing.

    • D. 

      Equipment management.

  • 14. 
    14. (006) Who is responsible for determining the appropriate supply delivery priority for a parts request?
    • A. 

      Customer.

    • B. 

      Customer supply liaison.

    • C. 

      Maintenance supply support.

    • D. 

      Logistics readiness squadron (LRS) customer service.

  • 15. 
    16.(006) Which urgency justification codes (UJC) are used to show a supply request for bits and pieces to repair a line replaceable unit (LRU) or shop replaceable unit (SRU) spare?
    • A. 

      1A or JA.

    • B. 

      AR or BR.

    • C. 

      AA or AM.

    • D. 

      BM or CM.

  • 16. 
    17. (007) Which type of asset has an expendability, recoverability, reparability code (ERRC) of XF3?
    • A. 

      Consumable.

    • B. 

      Field (base) reparable or consumable.

    • C. 

      Depot reparable Serialized Control and Reporting System (SCARS) asset.

    • D. 

      Depot reparable Air Force Recoverable Assembly Management System (AFRAMS) asset.

  • 17. 
    18.(007) Which supply tracking document provides a management product for monitoring issues and bench stock supply support?
    • A. 

      D18, Priority Monitor Report

    • B. 

      D04, Daily Document Register.

    • C. 

      M–24, Organization Effectiveness Report.

    • D. 

      D23, Repair Cycle Asset Management List.

  • 18. 
    19.(008) Which technical order details the deficiency reporting process?
    • A. 

      00–5–1.

    • B. 

      00–5–15.

    • C. 

      00–20–9.

    • D. 

      00–35D–54.

  • 19. 
    20.(008) Using the Joint Deficiency Reporting System (JDRS), submissions of deficiency reports may be accomplished by
    • A. 

      Major command and staff members only.

    • B. 

      Flight chiefs or superintendents only.

    • C. 

      Quality assurance personnel only.

    • D. 

      Anyone.

  • 20. 
    20.(008) Using the Joint Deficiency Reporting System (JDRS), submissions of deficiency reports may be accomplished by
    • A. 

      Major command and staff members only.

    • B. 

      Flight chiefs or superintendents only.

    • C. 

      Quality assurance personnel only.

    • D. 

      Anyone.

  • 21. 
    21.(008) At most bases, who performs the function of the screening point?
    • A. 

      Base supply.

    • B. 

      Item manager.

    • C. 

      Originating unit.

    • D. 

      Technical order distribution office or quality assurance

  • 22. 
    22.(009) Who must appoint an individual to be an equipment account custodian?
    • A. 

      Section supervisor.

    • B. 

      Squadron commander.

    • C. 

      Flight commander/chief.

    • D. 

      Operations officer/maintenance superintendent.

  • 23. 
    23.(009) Which specific block of supply training is provided for due-in from maintenance (DIFM)monitors?
    • A. 

      I.

    • B. 

      B.    III.

    • C. 

      C.    IIB.

    • D. 

      D.    IIA.

  • 24. 
    24.(009) After the initial inventory, how often must an equipment account be inventoried?
    • A. 

      Monthly.

    • B. 

      Quarterly.

    • C. 

      Annually.

    • D. 

      Biennially.

  • 25. 
    25.(010) Which Logistics Readiness Squadron (LRS) office accounts for special purpose recoverableauthorized maintenance (SPRAM) assets managed on in-use detail records?
    • A. 

      Equipment accountability element (EAE).

    • B. 

      Materiel management activity.

    • C. 

      Equipment liaison office (ELO).

    • D. 

      System program director (SPD).

Back to Top Back to top