Section C Sepm Quiz 1

10 Questions | Total Attempts: 63

SettingsSettingsSettings
Section C Sepm Quiz 1 - Quiz


Questions and Answers
  • 1. 
     Software engineering approach is used to achieve
    • A. 

      Better performance of hardware

    • B. 

      Error free software

    • C. 

      Reusable software

    • D. 

      Quality software product

  • 2. 
    During software development, which factor is most crucial? 
    • A. 

      People

    • B. 

      Product

    • C. 

      Process

    • D. 

      Project

  • 3. 
    Milestones are used to 
    • A. 

      Know the cost of the project

    • B. 

      Know the status of the project

    • C. 

      Know user expectations

    • D. 

      none of the above

  • 4. 
     If requirements are easily understandable and defined,which model is best suited? 
    • A. 

      Waterfall model

    • B. 

      Prototyping model

    • C. 

      Spiral model

    • D. 

      None of the above 

  • 5. 
    How many Phases in Agile Methods
    • A. 

      4

    • B. 

      5

    • C. 

      3

    • D. 

      6

  • 6. 
    The outcome of construction phased can be treated as
    • A. 

      Product release

    • B. 

      Beta release

    • C. 

      Alpha release

    • D. 

      All of the above

  • 7. 
     If project is the enhancement of existing system, which model is best suited?
    • A. 

      Waterfall model

    • B. 

      Prototyping model

    • C. 

      Iterative enhancement model

    • D. 

      Spiral model

  • 8. 
     If limited user participation is available, which model is to be selected?  
    • A. 

      Waterfall model

    • B. 

      Spiral model

    • C. 

      Iterative enhancement model

    • D. 

      Any of the above 

  • 9. 
    Statistically, the maximum percentage of errors belong to the following phase of SDLC
    • A. 

      Coding

    • B. 

      Design

    • C. 

      Specifications

    • D. 

      Installation and maintenance 

  • 10. 
    The development is supposed to proceed linearly through the phase in
    • A. 

      Spiral model

    • B. 

      Waterfall model

    • C. 

      Prototyping model(

    • D. 

      None of the above

Back to Top Back to top