ISTQB 1

10 Questions | Attempts: 342
Please wait...
Question 1 / 11
🏆 Rank #--
Score 0/100

1. A risk-based approach to testing provides proactive opportunities to reduce the
levels of product risk, starting in the initial stages of a project

Submit
Please wait...
About This Quiz
ISTQB Quizzes & Trivia

2.

What first name or nickname would you like us to use?

You may optionally provide this to label your report, leaderboard, or certificate.

2. A regression test:

Submit

3. The _________ Is the activity where general testing objectives are transformed
into tangible test conditions and test designs

Submit

4. Which expression best matches the following characteristics or review processes:

1. Led by author
2. Undocumented
3. No management participation
4. Led by a trained moderator or leader
5. Uses entry exit criteria

s) Inspection
t) Peer review
u) Informal review
v) Walkthrough

Submit

5. Order numbers on a stock control system can range between 10000 and 99999 inclusive. Which of the following inputs might be a result of designing tests for only valid equivalence classes and valid boundaries:

Submit

6. IEEE 829 test plan documentation standard contains all of the following except:

Submit

7. Which of the following is the main purpose of the integration strategy for integration testing in the small?

Submit

8. The process starting with the terminal modules is called:

Submit

9. Given the following code, which is true: IF A > B THEN
C = A – B
ELSE
C = A + B
ENDIF
Read D
IF C = D Then
Print "Error"
ENDIF

Submit

10. Recovery testing is a system test that forces the software to fail and verifies
that data recovery is properly performed. The following should be checked for
correctness
1. Re-initialization
2. Restart
3. Data Recovery
4. Check Point Mechanism

Submit
×
Saved
Thank you for your feedback!
View My Results
Cancel
  • All
    All (10)
  • Unanswered
    Unanswered ()
  • Answered
    Answered ()
A risk-based approach to testing provides proactive opportunities to...
A regression test:
The _________ Is the activity where general testing objectives are...
Which expression best matches the following characteristics or review...
Order numbers on a stock control system can range between 10000 and...
IEEE 829 test plan documentation standard contains all of the...
Which of the following is the main purpose of the integration strategy...
The process starting with the terminal modules is called:
Given the following code, which is true: ...
Recovery testing is a system test that forces the software to fail and...
play-Mute sad happy unanswered_answer up-hover down-hover success oval cancel Check box square blue
Alert!