Fire Inspection & Code Enforcement Chapt. 16

Approved & Edited by ProProfs Editorial Team
The editorial team at ProProfs Quizzes consists of a select group of subject experts, trivia writers, and quiz masters who have authored over 10,000 quizzes taken by more than 100 million users. This team includes our in-house seasoned quiz moderators and subject matter experts. Our editorial experts, spread across the world, are rigorously trained using our comprehensive guidelines to ensure that you receive the highest quality quizzes.
Learn about Our Editorial Process
| By Tribecca09
T
Tribecca09
Community Contributor
Quizzes Created: 25 | Total Attempts: 6,926
Questions: 28 | Attempts: 107

SettingsSettingsSettings
Fire Inspection & Code Enforcement Chapt. 16 - Quiz


Quiz questions for Chapter 16


Questions and Answers
  • 1. 

    Plans review & permitting process is administered by:

    • A.

      Fire chief

    • B.

      Electrical engineer

    • C.

      Local building official

    Correct Answer
    C. Local building official
    Explanation
    The plans review and permitting process is administered by the local building official. This official is responsible for ensuring that building plans comply with local building codes and regulations. They review the plans to ensure they meet safety standards and issue permits once they are satisfied with the plans. The fire chief may have input in the process regarding fire safety measures, but they are not solely responsible for administering the process. Similarly, an electrical engineer may be consulted for electrical system requirements, but they do not oversee the entire process.

    Rate this question:

  • 2. 

    Which is MOST accurate re:  Fire Inspector I

    • A.

      A fire inspector I must be certified to NFPA 1001

    • B.

      A fire inspector I is expected to perform the permit process

    • C.

      A fire inspector I must be familiar with the plans review process

    Correct Answer
    C. A fire inspector I must be familiar with the plans review process
    Explanation
    A fire inspector I must be familiar with the plans review process because it is an essential part of their job responsibilities. Plans review involves examining architectural and engineering plans to ensure compliance with fire safety codes and regulations. This process allows the fire inspector to identify potential fire hazards, ensure proper fire protection systems are in place, and make recommendations for improvements or modifications. Being familiar with the plans review process allows the fire inspector I to effectively assess and enforce fire safety measures in buildings and ensure the safety of occupants.

    Rate this question:

  • 3. 

    Which is NOT included on the title block of plan views?

    • A.

      Title of the drawing

    • B.

      Sheet number in the set

    • C.

      Date the drawing was started

    Correct Answer
    C. Date the drawing was started
    Explanation
    The title block of plan views typically includes the title of the drawing, the sheet number in the set, and other relevant information such as the scale and revision history. However, the date the drawing was started is not typically included in the title block. This information is usually recorded elsewhere, such as in the drawing log or project documentation.

    Rate this question:

  • 4. 

    Which is a two dimensional view of the site or the building as seen from directly above the area?

    • A.

      Site plan

    • B.

      Plan view

    • C.

      Floor plan

    Correct Answer
    B. Plan view
    Explanation
    A plan view is a two-dimensional representation of a site or building, showing the layout and arrangement of objects as seen from directly above the area. It provides a bird's eye view and allows for a comprehensive understanding of the spatial organization, including the placement of walls, doors, windows, and other architectural features. Unlike a site plan that focuses on the external features of the site, a plan view encompasses both the site and the building, providing a holistic view of the entire space.

    Rate this question:

  • 5. 

    Which identifies conditions currently existing on the site & relates information needed to located the building?

    • A.

      Site plan

    • B.

      Floor plan

    • C.

      Detailed view

    Correct Answer
    A. Site plan
    Explanation
    A site plan is a detailed drawing that shows the layout, features, and conditions of a specific site. It includes information such as the location of buildings, roads, parking lots, utilities, and landscaping. By examining a site plan, one can identify the current conditions on the site and understand how the building is situated within the larger context of the site. Therefore, a site plan is the most appropriate option for identifying conditions and relating information needed to locate a building.

    Rate this question:

  • 6. 

    On a site plan, ____ are usually drawn with a light broken line.

    • A.

      Utility lines

    • B.

      Lot dimensions

    • C.

      Structures to be removed

    Correct Answer
    C. Structures to be removed
    Explanation
    On a site plan, structures to be removed are usually drawn with a light broken line. This is done to differentiate them from the other elements on the plan and indicate that they are not permanent. The light broken line represents that these structures are temporary and will be removed in the future. This helps in providing clarity and understanding to anyone reviewing or working with the site plan.

    Rate this question:

  • 7. 

    Which is a horizontal drawing of a structure at a given level such as the ground floor, basement, or roof?

    • A.

      Site plan

    • B.

      Floor plan

    • C.

      Detailed view

    Correct Answer
    B. Floor plan
    Explanation
    A floor plan is a horizontal drawing of a structure at a specific level, such as the ground floor, basement, or roof. It provides a bird's eye view of the layout and arrangement of rooms, walls, doors, and windows. This drawing is essential for architects, designers, and builders to understand the spatial organization and functionality of a building. It helps in visualizing the overall structure and determining the flow of spaces within a particular level.

    Rate this question:

  • 8. 

    Which is NOT included on a floor plan?

    • A.

      Elevators

    • B.

      External walls

    • C.

      Floors & floor joists

    Correct Answer
    C. Floors & floor joists
    Explanation
    A floor plan is a visual representation of a building's layout, showing the arrangement of rooms, walls, and other architectural elements. It typically includes information about the building's structure and features. Elevators, external walls, and floors & floor joists are all important components that are usually included on a floor plan. However, the answer states that "floors & floor joists" are not included, suggesting that this information is not typically depicted on a floor plan.

    Rate this question:

  • 9. 

    On a floor plan, windows & doors are coded by:

    • A.

      Broken lines

    • B.

      Pictographs enclosed in a circle or other shape

    • C.

      Letters or numbers enclosed in a circle or other geometric shape

    Correct Answer
    C. Letters or numbers enclosed in a circle or other geometric shape
    Explanation
    Windows and doors on a floor plan are coded using letters or numbers enclosed in a circle or other geometric shape. This coding system helps to easily identify and differentiate between different windows and doors on the plan. By enclosing the letters or numbers in a circle or geometric shape, it provides a clear visual representation of the location and type of each window and door. This coding method is commonly used in architectural and design plans to ensure clarity and accuracy in communication.

    Rate this question:

  • 10. 

    Which is a two dimensional view of a building as seen from the exterior?

    • A.

      Detailed view

    • B.

      Sectional view

    • C.

      Elevation view

    Correct Answer
    C. Elevation view
    Explanation
    An elevation view is a two-dimensional representation of a building as seen from the exterior. It shows the vertical surfaces of the building, including the height, shape, and arrangement of windows, doors, and other architectural features. It provides a clear and concise depiction of the building's appearance from a specific vantage point, allowing viewers to understand its overall design and proportions.

    Rate this question:

  • 11. 

    Which is a vertical view of a building as if it were cut into two parts?

    • A.

      Plan view

    • B.

      Detailed view

    • C.

      Sectional view

    Correct Answer
    C. Sectional view
    Explanation
    A sectional view is a vertical view of a building that shows what the interior would look like if it were cut into two parts. It provides a detailed representation of the building's structure and layout, allowing viewers to understand the different components and how they are connected. This view is commonly used in architectural and engineering drawings to showcase the internal details of a building.

    Rate this question:

  • 12. 

    Sectional views include the following construction details EXCEPT:

    • A.

      Floor

    • B.

      Ceiling

    • C.

      Interior walls

    Correct Answer
    B. Ceiling
    Explanation
    Sectional views are used to show the internal construction details of an object. In this case, the question is asking which construction detail is not typically included in a sectional view. The floor, interior walls, and ceiling are all commonly shown in sectional views to provide a comprehensive understanding of the object's internal structure. Therefore, the correct answer is "ceiling," as it is the construction detail that is not typically included in sectional views.

    Rate this question:

  • 13. 

    Which is provided when necessary to show a feature in a larger size that what is on the floor plan?

    • A.

      Plan view

    • B.

      Detailed view

    • C.

      Sectional view

    Correct Answer
    B. Detailed view
    Explanation
    A detailed view is provided when necessary to show a feature in a larger size than what is shown on the floor plan. This allows for a more thorough and accurate representation of the specific feature, providing more information and clarity to the viewer. In a detailed view, specific dimensions, materials, and other important details can be highlighted and emphasized, ensuring a comprehensive understanding of the feature.

    Rate this question:

  • 14. 

    Mechanical plans or drawings should be designed by:

    • A.

      Fire protection engineers

    • B.

      Building systems engineers

    • C.

      The building/owner/occupant

    Correct Answer
    B. Building systems engineers
    Explanation
    Building systems engineers should design mechanical plans or drawings because they have the expertise and knowledge in designing and implementing mechanical systems within buildings. They understand the technical requirements and considerations necessary for efficient and effective mechanical systems, such as HVAC, plumbing, and electrical systems. Fire protection engineers may be involved in designing fire suppression systems, but they may not have the same level of expertise in overall mechanical system design. The building/owner/occupant may have input and requirements for the mechanical systems, but they typically rely on the expertise of building systems engineers to develop the detailed plans and drawings.

    Rate this question:

  • 15. 

    During the review of the mechanical system plans, an inspector should verify:

    • A.

      The style & design of the HVAC system

    • B.

      The location of the fire & smoke dampers

    • C.

      The amount of refrigerant used in the HVAC system

    Correct Answer
    A. The style & design of the HVAC system
    Explanation
    During the review of mechanical system plans, an inspector should verify the style and design of the HVAC system. This is important as it ensures that the system is designed in a way that is efficient, effective, and meets the specific requirements of the building. The style and design of the HVAC system can impact factors such as energy efficiency, air quality, and overall comfort. Therefore, it is crucial for the inspector to ensure that the style and design of the HVAC system align with industry standards and best practices.

    Rate this question:

  • 16. 

    During the review of the electrical systems, an inspector must verify that:

    • A.

      Illumination of exit access is adequate

    • B.

      All doors are fitted with electronic door locks

    • C.

      Electrical lines are located in the proper areas

    Correct Answer
    A. Illumination of exit access is adequate
    Explanation
    During the review of electrical systems, an inspector must verify that the illumination of exit access is adequate. This means that there should be sufficient lighting in the areas leading to exits, ensuring that occupants can safely and easily find their way out in case of an emergency. This is an important safety measure to prevent accidents and ensure the proper functioning of emergency evacuation procedures. Inspecting the adequacy of exit access illumination helps to identify any deficiencies and allows for necessary improvements to be made to ensure the safety of the building occupants.

    Rate this question:

  • 17. 

    Which statement re:  exit illumination is MOST accurate?

    • A.

      Exit illumination signs must be at least 1 foot tall

    • B.

      Exit illumination must be placed within 2 ft of each means of egress

    • C.

      Exit illumination must be in continuous operation while the building is occupied

    Correct Answer
    C. Exit illumination must be in continuous operation while the building is occupied
    Explanation
    Exit illumination must be in continuous operation while the building is occupied to ensure that occupants can safely navigate and find the exit during emergencies or power outages. This requirement helps to maintain visibility and prevent panic or confusion during evacuation. It is important for exit illumination to remain operational at all times to provide a clear and easily identifiable path to safety.

    Rate this question:

  • 18. 

    An inspector may review plumbing system plans to determine if the:

    • A.

      Fire dept connection is in the correct location

    • B.

      Sprinkler system is adequately positioned to extinguish a fire

    • C.

      Water supply is adequate to support fire protection systems in the structure

    Correct Answer
    C. Water supply is adequate to support fire protection systems in the structure
    Explanation
    The correct answer is "water supply is adequate to support fire protection systems in the structure." When reviewing plumbing system plans, an inspector would assess whether the water supply is sufficient to support the fire protection systems in the building. This includes ensuring that there is enough water pressure and flow rate to operate sprinkler systems and other fire suppression equipment effectively. It is crucial to have an adequate water supply to ensure the safety and effectiveness of fire protection measures in the structure.

    Rate this question:

  • 19. 

    Inspectors need to check sprinkler system designs for all the following EXCEPT:

    • A.

      Extent of coverage

    • B.

      Pipe sizes & lengths

    • C.

      Type & size of pipe hangers

    Correct Answer
    C. Type & size of pipe hangers
    Explanation
    Inspectors are responsible for checking various aspects of sprinkler system designs to ensure their functionality and compliance with safety standards. They need to assess the extent of coverage to ensure that all areas are adequately protected. They also need to review pipe sizes and lengths to ensure that they are appropriate for the system's requirements. However, the type and size of pipe hangers are not directly related to the effectiveness or safety of the sprinkler system, making it unnecessary for inspectors to check this aspect.

    Rate this question:

  • 20. 

    The size of each sprinkler system is based on the ____ that a single riser & control valve can protect.

    • A.

      Occupancy classification

    • B.

      Dimensions of the floor area

    • C.

      Total square footage of the floor area

    Correct Answer
    C. Total square footage of the floor area
    Explanation
    The size of each sprinkler system is determined by the total square footage of the floor area that it needs to protect. This means that the larger the floor area, the larger the sprinkler system needs to be in order to adequately cover and protect the entire space. The occupancy classification and dimensions of the floor area may also be factors to consider when designing a sprinkler system, but the primary factor in determining the size of the system is the total square footage of the floor area.

    Rate this question:

  • 21. 

    Inspectors must determine which of infor. re:  standpipe & hose systems?

    • A.

      Amount of water required

    • B.

      Fire dept. connection size

    • C.

      Discharge control valves location

    Correct Answer
    C. Discharge control valves location
    Explanation
    Inspectors must determine the location of the discharge control valves in standpipe and hose systems. This is important because the location of these valves affects the effectiveness and efficiency of the system in controlling and directing the flow of water during a fire emergency. By knowing the location of the discharge control valves, inspectors can ensure that they are easily accessible and properly positioned to allow for quick and effective water discharge when needed.

    Rate this question:

  • 22. 

    Re:  special agent fire extinguishing systems is MOST accurate?

    • A.

      Inspectors must create detailed specifications

    • B.

      System documents must include the fire dept. connection location

    • C.

      Inspectors must be familiar with each type of system & its applicable requirements

    Correct Answer
    C. Inspectors must be familiar with each type of system & its applicable requirements
    Explanation
    The correct answer is "inspectors must be familiar with each type of system & its applicable requirements." This answer is the most accurate because it directly addresses the topic of special agent fire extinguishing systems and the role of inspectors. It suggests that inspectors need to have knowledge and understanding of different types of systems and the specific requirements that apply to each system. This knowledge is crucial for inspectors to effectively assess and evaluate the systems during inspections.

    Rate this question:

  • 23. 

    Fire detection & alarm systems are designed to the requirements found in NFPA 72

    • A.

      International Fire Code

    • B.

      International Alarm Code

    • C.

      National Fire Alarm Code

    Correct Answer
    C. National Fire Alarm Code
    Explanation
    Fire detection and alarm systems are designed according to the requirements outlined in the National Fire Alarm Code (NFPA 72). This code provides guidelines and standards for the installation, testing, and maintenance of fire alarm systems. It ensures that these systems are designed to effectively detect and alert occupants of a building in the event of a fire. Compliance with the NFPA 72 ensures that fire alarm systems are reliable and meet the necessary safety standards.

    Rate this question:

  • 24. 

    Which is NOT a function of fire detection & alarm systems?

    • A.

      Escalator controls

    • B.

      Stair pressurization

    • C.

      Initiation of automatic fire extinguishing equipment

    Correct Answer
    A. Escalator controls
    Explanation
    Fire detection and alarm systems are designed to detect and alert occupants of a building in case of a fire. They are responsible for initiating automatic fire extinguishing equipment and ensuring the activation of systems like stair pressurization, which helps to prevent the spread of smoke and fire. However, fire detection and alarm systems do not have any control over escalators. Escalators are separate systems that are not directly related to fire safety measures.

    Rate this question:

  • 25. 

    Which is a function of fire detection & alarm systems?

    • A.

      Escalator controls

    • B.

      Stair pressurization

    • C.

      Doors that open automatically when the alarm activates

    Correct Answer
    B. Stair pressurization
    Explanation
    Stair pressurization is a function of fire detection and alarm systems. Stair pressurization involves controlling air pressure in stairwells during a fire emergency to prevent smoke from entering and to maintain a safe escape route for occupants. This is achieved by using fans and dampers to create a positive pressure inside the stairwell, which helps to keep smoke out and allows people to evacuate safely.

    Rate this question:

  • 26. 

    Which specifications should be included in fire detection & alarm system plans?

    • A.

      Number of wires used

    • B.

      Methods of supervision

    • C.

      Type of electrical outlets utilized

    Correct Answer
    B. Methods of supervision
    Explanation
    The specifications that should be included in fire detection & alarm system plans are the methods of supervision. This refers to the techniques and processes used to monitor and oversee the system's performance and functionality. It includes the use of various sensors, detectors, and alarms to ensure that any potential fire incidents are detected and reported promptly. By including the methods of supervision in the plans, the system can be designed and implemented effectively to provide reliable fire detection and alarm capabilities.

    Rate this question:

  • 27. 

    During new construction or remodeling of a structure, an inspector should visit the site often to verify that:

    • A.

      Costs are being kept to a minimum

    • B.

      The general contractor has up to date credentials

    • C.

      Each code requirement is being met based on the approved plan

    Correct Answer
    C. Each code requirement is being met based on the approved plan
    Explanation
    During new construction or remodeling of a structure, it is crucial for an inspector to visit the site often to ensure that each code requirement is being met based on the approved plan. This is important to ensure that the construction or remodeling process is being carried out in compliance with the necessary safety standards and regulations. By regularly inspecting the site, the inspector can identify any deviations from the approved plan and address them promptly, thus ensuring the overall integrity and safety of the structure.

    Rate this question:

  • 28. 

    Protective clothing & equipment for site visits should include:

    • A.

      Work uniforms

    • B.

      Earmuffs or earplugs

    • C.

      Badge & identification card

    Correct Answer
    B. Earmuffs or earplugs
    Explanation
    Protective clothing and equipment for site visits should include earmuffs or earplugs to protect the ears from loud noises or potential damage. This is important as construction sites or industrial areas can have high levels of noise that can be harmful to the ears. Wearing earmuffs or earplugs can help prevent hearing loss or other ear-related injuries.

    Rate this question:

Quiz Review Timeline +

Our quizzes are rigorously reviewed, monitored and continuously updated by our expert board to maintain accuracy, relevance, and timeliness.

  • Current Version
  • Mar 11, 2024
    Quiz Edited by
    ProProfs Editorial Team
  • Mar 22, 2011
    Quiz Created by