CDC 2s071 Volume 2 Multiple Choice Quiz

60 Questions | Total Attempts: 1048

SettingsSettingsSettings
Please wait...
2s071 Quizzes & Trivia

For private use only!


Questions and Answers
  • 1. 
     (201) When an I023 management notice indicates suitable interchangeable or substitute items are available for issue, with whom must Demand Processing personnel verify approval?
    • A. 

      Flight chief

    • B. 

      Commander

    • C. 

      Requesting agency

    • D. 

      Responsible item manager

  • 2. 
    (201) Issues from a supply point are considered
    • A. 

      Multiple issues

    • B. 

      Over-the-counter

    • C. 

      One-for-one exchange

    • D. 

      Serviceable for unserviceable

  • 3. 
    (201) What do personnel in a supply point use to process issues when they are operating without a terminal function?
    • A. 

      Pre-post, TEX 6

    • B. 

      Pre-post, TEX 7

    • C. 

      Post-post, TEX 6

    • D. 

      Post-post, TEX 7

  • 4. 
    (201) The computer transaction automatically created to record the withdrawl of a mobility readiness spares package asset to satisfy a mission capability requirement is called
    • A. 

      B9(x) MICAP report

    • B. 

      BV(x) MICAP report

    • C. 

      BVDA MICAP notification

    • D. 

      BVDB MICAP notification

  • 5. 
    (202) What activity code identifies an issue request as a core automated maintenance system document?
    • A. 

      X

    • B. 

      R

    • C. 

      J

    • D. 

      C

  • 6. 
    (202) What Standard Base Supply System output notifies the core automated maintenance system of changes in due-out status?
    • A. 

      DUO

    • B. 

      1SH

    • C. 

      ISU

    • D. 

      CSU

  • 7. 
    (203) How are cannibalizations processed for a mission capability termination?
    • A. 

      TRIC SPR, delete code 4

    • B. 

      TRIC SPR, delete code 8

    • C. 

      TRIC NOR, delete code 4

    • D. 

      TRIC NOR, delete code 8

  • 8. 
    (203) Which system provides visibility of mission capability and awaiting parts transactions by accepting transactions from depots and bases worldwide, maintains master records and reports for all levels of Air Logistics Center management, and provides the capability to reconcile your base's MICAP/AWP data with the depot?
    • A. 

      C001

    • B. 

      D165B

    • C. 

      D043B

    • D. 

      D200A

  • 9. 
    (204) To perform the due-in from maintenance reconcilliation, what listing is used?
    • A. 

      D19

    • B. 

      D20

    • C. 

      D23

    • D. 

      Q04

  • 10. 
    (204) What due-in from maintenance detail records can be updated by the transaction identification code "DFM" input?
    • A. 

      Memo and credit

    • B. 

      Firm and credit

    • C. 

      Firm and memo

    • D. 

      Credit only

  • 11. 
    (205) When monitoring awaiting parts and end items, personnel at bases submit requests for repair parts on a fill or backorder basis using the urgency justification code
    • A. 

      "AB" only

    • B. 

      "AR" only

    • C. 

      "AA" or "AB"

    • D. 

      "AR" or "BR"

  • 12. 
    (206) Failure to process transaction identification code "TRN" data in a correct and timely manner results in reduced base stock levels and incomplete reports from which buy, repair, and distribution decisions are made by personnel in
    • A. 

      HQ AFMC

    • B. 

      CASO

    • C. 

      GSA

    • D. 

      DLA

  • 13. 
    (206) What product would you use to verify transaction identification code "TRN" processing is completed?
    • A. 

      Supply Point Listing

    • B. 

      Daily Document Register

    • C. 

      Base Supply Surveillance Report

    • D. 

      Repair Cycle Asset Management List

  • 14. 
    (206) The net repair cycle days for a transaction identification code "TRN" input must be manually computed
    • A. 

      When directed by the operation support officer

    • B. 

      When the turnaround time exceeds 15 days

    • C. 

      When the turnaround quantity exceeds 15

    • D. 

      Upon receipt of a 256 Reject

  • 15. 
    (207) To manage the flow of repair cycle assets properly, the preferred location for the processing of due-in from maintenance turn-ins is
    • A. 

      Receiving

    • B. 

      Distribution

    • C. 

      War readiness

    • D. 

      Repair cycle support

  • 16. 
    (207) The small groups of selected "XD" items that are candidates for two-level repair are known as
    • A. 

      DLR

    • B. 

      DLT

    • C. 

      OAR

    • D. 

      ALR

  • 17. 
    (207) What listing will stock control personnel use to monitor property awaiting disposition instructions from the item manager?
    • A. 

      D19, Part 2

    • B. 

      D23, Part 4

    • C. 

      D20, Part 2

    • D. 

      D19, Part 4

  • 18. 
    (207) An XF3 item cannot be considered for condemnation unless it cannot be repaired or the cost to repair exceeds what percentage of the replacement cost?
    • A. 

      50

    • B. 

      75

    • C. 

      90

    • D. 

      100

  • 19. 
    (208) What supply condition code and action code is used to process a Product Quality/Materiel Deficiency Report turn-in?
    • A. 

      F, 1

    • B. 

      H, 9

    • C. 

      A, B

    • D. 

      Q, C

  • 20. 
    (208) What input is used to load the warehouse location/Product Quality/Materiel Deficiency Report control number on the due-in from maintenance detail record?
    • A. 

      FSP

    • B. 

      MDR

    • C. 

      DFM

    • D. 

      FCS

  • 21. 
    (209) What management level includes war reserve materiel equipment requirements in appropriate allowance documents and assigns composition codes to war reserve materiel allowance standards?
    • A. 

      HQ USAF

    • B. 

      HQ AFMC

    • C. 

      MAJCOM

    • D. 

      Materiel management functional community

  • 22. 
    (210) Which part of the S05 lists authorizations for which the computer could not find a war reserve materiel detail record?
    • A. 

      One

    • B. 

      Two

    • C. 

      Three

    • D. 

      Four

  • 23. 
    (210) What financial restraint supportability code is loaded to all initial and increased war reserve materiel authorizations to prevent unauthorized use of materiel management activity group money for war reserve materiel purposes?
    • A. 

      F

    • B. 

      M

    • C. 

      R

    • D. 

      W

  • 24. 
    (210) What report lists unsupportable war reserve materiel requirements?
    • A. 

      S05

    • B. 

      Q07

    • C. 

      Q05

    • D. 

      S07

  • 25. 
    (211) How many days can a mobility readiness spares package support a weapon system or weapon support system in a deployed location before re-supply is necessary?
    • A. 

      30

    • B. 

      60

    • C. 

      90

    • D. 

      120