The correct answer is the confirmation of the correct weight of the ULD, correct build-up including compatibility and contour, and ULD serviceability check prior to build. This means that when signing the ULD tag, the person is confirming that the weight of the ULD is accurate, the ULD has been built correctly with the appropriate compatibility and contour, and that a serviceability check has been conducted on the ULD before it was built.