Cm 105 Wendy's Test

96 Questions | Attempts: 99
Share

SettingsSettingsSettings
Cm 105 Wendy

Questions and Answers
  • 1. 
    The general contractor will furnish yellow paint and labor for pavement markers?
    • A. 

      True

    • B. 

      False

  • 2. 
    Footings for the trash enclosure are 12x20x36.
    • A. 

      True

    • B. 

      False

  • 3. 
    The anchor bolts for light poles are to be installed by the electrical sub-contractor.
    • A. 

      True

    • B. 

      False

  • 4. 
    Three sections and four elevations are referenced on the trash enclosure plan.
    • A. 

      True

    • B. 

      False

  • 5. 
    Curbs are reinforced with 2 #3 bars cont.
    • A. 

      True

    • B. 

      False

  • 6. 
    The floor slab is at what ______________ elevation.
  • 7. 
    The mop basin is recessed ______________ deep.
  • 8. 
    Underground plumbing is shown as dashed lines.
    • A. 

      True

    • B. 

      False

  • 9. 
    The entire length and width of the building is ______ x _______.
  • 10. 
    There are ____________ rebar in the exterior doorways.
  • 11. 
    The floor in room 101 (dinning) is covered with (how much)____________.
  • 12. 
    Door elevation (which) _________ is referenced to doors A and D.
  • 13. 
    The ceiling in Room 108 is _______ AFF and is (what)____________.
  • 14. 
    Door H has a window in it that is 20x30.
    • A. 

      True

    • B. 

      False

  • 15. 
    The inside of the shear wall has (what) ______________application.
  • 16. 
    The dining area is Room # ________.
  • 17. 
    The rough opening for the plastic laminate covered flush doors with adjustable aluminum frames is to be (how much) _____ wider than the door leaf.
  • 18. 
    Water closets in the restrooms share a common wall.
    • A. 

      True

    • B. 

      False

  • 19. 
    Restroom floors are quarry tile.
    • A. 

      True

    • B. 

      False

  • 20. 
    Room 102 is designated as the Men’s Room.
    • A. 

      True

    • B. 

      False

  • 21. 
    All exterior elevations are illustrated at the ame scale.
    • A. 

      True

    • B. 

      False

  • 22. 
    The storage module is provided by the general contractor.
    • A. 

      True

    • B. 

      False

  • 23. 
    The sliding pick-up windows are shown on the (which side)_______ elevation.
  • 24. 
    The owner has an approved supplier list.
    • A. 

      True

    • B. 

      False

  • 25. 
    Representing the footings and foundations are (what kind)________lines.