2a6x2 CDC Vol 4

Reviewed by Editorial Team
The ProProfs editorial team is comprised of experienced subject matter experts. They've collectively created over 10,000 quizzes and lessons, serving over 100 million users. Our team includes in-house content moderators and subject matter experts, as well as a global network of rigorously trained contributors. All adhere to our comprehensive editorial guidelines, ensuring the delivery of high-quality content.
Learn about Our Editorial Process
| By D. Crook
D
D. Crook
Community Contributor
Quizzes Created: 1 | Total Attempts: 187
| Attempts: 187 | Questions: 89
Please wait...
Question 1 / 89
0 %
0/100
Score 0/100
1. When servicing the hydraulic cart, which prevents large particles in the fluid from entering the reservoir?

Explanation

A mesh screen is used to prevent large particles in the fluid from entering the reservoir when servicing the hydraulic cart. This screen acts as a filter, allowing only smaller particles and clean fluid to pass through while blocking larger debris. By doing so, it helps to maintain the cleanliness of the hydraulic fluid and prevent any potential damage to the system caused by the presence of large particles.

Submit
Please wait...
About This Quiz
2a6x2 CDC Vol 4 - Quiz

This quiz titled '2A6X2 CDC VOL 4' focuses on the operational and technical aspects of New Generation Heaters (NGH). It assesses knowledge on heater control units, starting aids,... see moresystem voltage requirements, and sensible heat concepts, crucial for professionals managing heating systems. see less

2. Repair of ground heater equipment should never be attempted 

Explanation

Repairing ground heater equipment without accurate technical data can be dangerous and may lead to further damage or injury. It is important to have access to the necessary technical information and specifications before attempting any repairs to ensure that the equipment is fixed correctly and safely.

Submit
3. If a bomblift starter failed to operate, which step should be taken first?

Explanation

The first step that should be taken if a bomblift starter failed to operate is to check the battery terminals and posts. This is because if the terminals and posts are corroded or loose, it can prevent the starter from receiving the necessary electrical power to operate. By checking and ensuring the battery terminals and posts are clean and securely connected, any potential issues related to power supply can be addressed before moving on to other troubleshooting steps.

Submit
4. At which storage cylinder pressure, in pounds per square inch gauge (psig), should the SGNSC nitrogen booster compressor stop?

Explanation

The SGNSC nitrogen booster compressor should stop at a storage cylinder pressure of 4400 pounds per square inch gauge (psig).

Submit
5. Which must be done before lowering the ram on the B-6 tripod jack?

Explanation

Before lowering the ram on the B-6 tripod jack, it is necessary to loosen the ram lock nut. This is because the ram lock nut secures the ram in place and prevents it from moving. Loosening the lock nut allows the ram to be lowered smoothly and safely.

Submit
6. Which must be done prior to raising or lowering the mast from the vertical or horizontal position on the FL-1D floodlight set?

Explanation

Prior to raising or lowering the mast from the vertical or horizontal position on the FL-1D floodlight set, it is necessary to position the tow bar to the left or right. This is important because the tow bar is used to stabilize and control the movement of the mast during the raising or lowering process. By positioning the tow bar to the left or right, it ensures that the mast remains stable and prevents any potential accidents or damage.

Submit
7. Where can you find test procedures for a particular component on a FL-1D floodlight set?

Explanation

The correct answer is the unit manufacturer's technical order (TO). This is because the TO provides detailed instructions and procedures for maintenance, repair, and inspection of specific components. It is specific to the unit manufacturer and would contain the necessary test procedures for the FL-1D floodlight set. The periodic and service inspection workcards may provide general guidelines but may not have the specific test procedures needed. The illustrated parts breakdown would provide information on the components and their assembly but may not include test procedures.

Submit
8. During the MJ-1B bomblift operation check, all hydraulic components should exhibit 

Explanation

During the MJ-1B bomblift operation check, it is expected that all hydraulic components should exhibit a smooth movement with no binding or jumping. This means that the components should move seamlessly without any obstruction or sudden jerky movements. Any binding or jumping could indicate a malfunction or issue with the hydraulic system, which could potentially affect the operation of the bomblift. Therefore, it is important for all hydraulic components to function smoothly and without any irregularities.

Submit
9. Which type of mechanism does the B-4 adjustable aircraft maintenance platform use to raise and lower the platform?

Explanation

The B-4 adjustable aircraft maintenance platform uses a scissor mechanism to raise and lower the platform. A scissor mechanism consists of two crossed beams connected by a series of folding supports, resembling a pair of scissors. When the platform is raised, the folding supports extend, and when it is lowered, they retract, allowing for easy height adjustment. This type of mechanism is commonly used in various applications where vertical movement is required, such as lifting platforms, car jacks, and certain types of industrial equipment.

Submit
10. When trouble shooting the MJ-1B bomblift electrical system, which component will give you a visual indication that the alternator is charging the batteries?

Explanation

The ammeter is the component that will give a visual indication that the alternator is charging the batteries. An ammeter measures the flow of electric current in a circuit, so if the alternator is charging the batteries, the ammeter will show a positive reading indicating the current flowing into the batteries. The voltmeter measures the voltage in a circuit, so it wouldn't specifically indicate if the alternator is charging the batteries. Bright headlights and control panel lights are not directly related to the charging of batteries by the alternator.

Submit
11. Which section of the MD-1 towbar has a screw actuated fork assembly that is used to engage or disengage the aircraft nose gear?

Explanation

The head adapter assembly of the MD-1 towbar has a screw actuated fork assembly that is used to engage or disengage the aircraft nose gear. This means that the head adapter assembly is responsible for securely connecting the towbar to the nose gear of the aircraft, allowing for easy towing and movement. The screw actuated fork assembly provides a mechanism for smoothly engaging or disengaging the nose gear, ensuring safe and efficient operations.

Submit
12. Every how many years is the hydrostatic test due on the receiver tank on a MC-20 air compressor?

Explanation

The hydrostatic test is due on the receiver tank of a MC-20 air compressor every 5 years. This test is important to ensure the tank's structural integrity and safety. By conducting the test regularly, any potential weaknesses or leaks can be identified and addressed promptly, reducing the risk of accidents or equipment failure.

Submit
13. Which position is the valve handle places in to precharge the PMU-29/E oil cart supply tank?

Explanation

To precharge the PMU-29/E oil cart supply tank, the valve handle should be placed in the BYPASS position. This position allows the oil to bypass the tank and flow directly into the system, ensuring that the tank is filled with oil before normal operation begins. The OPEN position would allow the oil to flow into the tank without bypassing it, potentially causing overfilling or pressure issues. The OFF position would completely shut off the flow of oil, while the ON position would allow the oil to flow into the system without precharging the tank.

Submit
14. The chain hoist on the universal jack tester is operated by

Explanation

The chain hoist on the universal jack tester is operated by a control box. This means that the control box is responsible for controlling the movement and operation of the chain hoist. It is likely that the control box has buttons or switches that allow the user to control the lifting and lowering of the hoist, as well as other functions such as speed and direction. The control box acts as the interface between the user and the chain hoist, allowing for precise and controlled operation.

Submit
15. Which MJ-1B bomblift valve prevents collapsing of the cantilever lifting arms in the event of hydraulic pressure failure?

Explanation

The counterbalance valve is designed to prevent the collapsing of the cantilever lifting arms in the event of hydraulic pressure failure. It achieves this by providing a controlled flow of hydraulic fluid to the lifting arms, which creates a counteracting force against the weight of the load. This ensures that even if the hydraulic pressure fails, the counterbalance valve will maintain the necessary support to prevent the arms from collapsing.

Submit
16. When should starting aids be used to start the New Generation Heater (NGH)?

Explanation

Starting aids should never be used to start the New Generation Heater (NGH) as it will result in serious engine damage. This implies that using starting aids can cause harm to the engine and is not recommended.

Submit
17. When verifying the proper operation of the MHU-83C/E bomblift centering mechanism, the unit should 

Explanation

The correct answer is "not move in neutral". When verifying the proper operation of the MHU-83C/E bomblift centering mechanism, it should not move in neutral. This means that when the unit is in neutral, it should remain stationary and not move. This is important for ensuring the safety and stability of the bomblift during operation. If the unit were to move in neutral, it could pose a risk of accidents or damage to the equipment or surroundings. Therefore, it is essential that the bomblift remains stationary when in neutral.

Submit
18. The volume of oil delivered from the hydraulic pump to the hydrostatic motor on the MJ-1B bomblift determines the 

Explanation

The volume of oil delivered from the hydraulic pump to the hydrostatic motor on the MJ-1B bomblift determines the speed of the truck. Hydraulic pumps are responsible for generating fluid flow, and in this case, the volume of oil being delivered directly affects the speed at which the truck operates. A higher volume of oil will result in a faster speed, while a lower volume will result in a slower speed. Therefore, the volume of oil delivered from the pump determines the speed of the truck.

Submit
19. Which position should the vent valve be in when liquid oxygen (LOX) carts are being transported?

Explanation

When liquid oxygen (LOX) carts are being transported, the vent valve should be in the closed position. This is because liquid oxygen is highly reactive and can easily ignite or explode if it comes into contact with flammable materials or if the pressure inside the cart increases. By keeping the vent valve closed, it ensures that the oxygen remains contained and prevents any potential accidents or hazards during transportation.

Submit
20. Which component provides manual speed adjustment on the AF/M32T-1 cabin leakage tester limits system pressure to 15 pounds per square inch (psi)?

Explanation

The throttle assembly is the component that provides manual speed adjustment on the AF/M32T-1 cabin leakage tester limits system pressure to 15 pounds per square inch (psi). The throttle assembly controls the amount of fuel and air mixture entering the engine, which in turn determines the speed and power output. By adjusting the throttle, the operator can regulate the engine speed and limit the system pressure to the desired level.

Submit
21. The purpose of the lift mechanism on the MD-1 tow bar is to 

Explanation

The lift mechanism on the MD-1 tow bar is designed to raise and lower the wheel assemblies. This allows for easy maneuverability and transportation of the aircraft. By lifting the wheel assemblies, the tow bar can be attached or detached from the aircraft's landing gear, making it convenient for towing operations. It also ensures that the aircraft's wheels are properly aligned and positioned during the towing process, enhancing safety and efficiency.

Submit
22. Which type of refrigeration system leak occurs when the pressure within the system is less than atmospheric pressure?

Explanation

Inward refrigeration system leak occurs when the pressure within the system is less than atmospheric pressure. This means that air or other gases from the atmosphere are being drawn into the system, causing a leak.

Submit
23. Check the MHU-83C/E bomblift backup hydraulic system by 

Explanation

To check the MHU-83C/E bomblift backup hydraulic system, one should operate the hand pump. This is because the hand pump is used to manually pressurize the hydraulic system when the main pump is not functioning or unavailable. By operating the hand pump, one can ensure that the backup hydraulic system is functioning properly and can provide the necessary hydraulic pressure when needed.

Submit
24. Which valve is used to slowly raise or lower the MJ-1B bomblift arms?

Explanation

The cradle lift arm control is used to slowly raise or lower the MJ-1B bomblift arms. This control allows for precise and gradual movement of the arms, ensuring safe and accurate positioning of the bomblift.

Submit
25. As soon as the MJ-1B engine starts, check for sufficient

Explanation

The MJ-1B engine needs to have sufficient oil pressure in order to function properly. Oil pressure is essential for lubricating the engine's moving parts and preventing excessive wear and tear. Without sufficient oil pressure, the engine could suffer damage and potentially fail. Therefore, it is crucial to check the oil pressure as soon as the engine starts to ensure that it is at the required level for smooth and safe operation.

Submit
26. Oil in a rotary vane compressor

Explanation

The oil in a rotary vane compressor forms a seal between the vanes and the stator. This is important because it prevents leakage of compressed air and ensures efficient operation of the compressor. Without the oil seal, there would be loss of pressure and decreased performance. Therefore, the oil plays a crucial role in maintaining the proper functioning of the compressor by creating a tight seal between the moving parts.

Submit
27. How is the air compressor in the self generating nitrogen servicing cart (SGNSC) categorized?

Explanation

The air compressor in the self-generating nitrogen servicing cart (SGNSC) is categorized as high pressure because it is designed to generate and deliver compressed air at a high pressure level. This is necessary for tasks such as inflating aircraft tires, where a significant amount of pressure is required to properly inflate the tires and ensure safe operation.

Submit
28. Which component on the B-1 adjustable aircraft maintenance platform allows the work platform and steps to remain parallel to the base at any desired platform height?

Explanation

The stair support linkage is the component on the B-1 adjustable aircraft maintenance platform that allows the work platform and steps to remain parallel to the base at any desired platform height. This linkage system is responsible for maintaining the alignment and stability of the platform and steps, ensuring safe and efficient access to different areas of the aircraft during maintenance and repair operations.

Submit
29. When starting the MA-3D air conditioner, hold the safety override switch until 

Explanation

The correct answer is to hold the safety override switch until 30 pounds of oil pressure is reached on the engine oil pressure gauge. This is because the air conditioner should not be started until there is sufficient oil pressure in the engine. The oil pressure gauge is used as a measure of this pressure, and reaching 30 pounds ensures that the engine is ready to start and operate properly.

Submit
30. Which is important to keep in mind when performing maintenance on the SGNSC?

Explanation

When performing maintenance on the SGNSC, it is important to keep safety in mind. This means taking precautions to ensure the well-being and protection of oneself and others. Maintenance work can involve potential hazards and risks, so following safety protocols, using protective equipment, and being aware of potential dangers is crucial. Safety should always be the top priority to prevent accidents, injuries, or damage to the equipment or surroundings.

Submit
31. In which position is the engine switch placed to energize the electric fuel pump, fuel solenoid, and regulator on the split deck maintenance platform?

Explanation

The engine switch is placed in the RUN position to energize the electric fuel pump, fuel solenoid, and regulator on the split deck maintenance platform. This position allows the engine to start and run properly by providing power to these components.

Submit
32. Continuous movement of pressurized hydraulic fluid in the MJ-1B bomblift causes the fluid to become

Explanation

The continuous movement of pressurized hydraulic fluid in the MJ-1B bomblift causes friction, which generates heat. As the fluid flows through the system, it absorbs this heat, resulting in an increase in temperature. Therefore, the correct answer is "heated."

Submit
33. Which is the compressor displacement when the ACE 802S air conditioner compressor is in the HOLD  position?

Explanation

The compressor displacement refers to the volume of air that the compressor is capable of moving in a given amount of time. In the HOLD position, the compressor is not actively compressing or moving any air, so the compressor displacement remains constant.

Submit
34. Which MJ-2A-1 hydraulic test stand engine system safety device sounds the warning horn in the event of an engine system malfunction?

Explanation

The oil pressure switch is the correct answer because it is a safety device that monitors the oil pressure in the engine system. In the event of an engine system malfunction, such as low oil pressure, the oil pressure switch will detect this and sound the warning horn to alert the operator. This is important as low oil pressure can cause engine damage or failure, and the warning horn ensures that the operator is aware of the issue and can take appropriate action.

Submit
35. Which prevents over pressurization of the steering system on the MJ-1B bomblift

Explanation

A relief valve is designed to prevent over pressurization in a system by opening and releasing excess pressure. In the case of the MJ-1B bomblift's steering system, a relief valve would be installed to ensure that the pressure does not exceed safe levels. This valve would open when the pressure reaches a certain threshold, allowing the excess pressure to escape and preventing damage to the steering system. This helps maintain the proper functioning and safety of the bomblift during operation.

Submit
36. To start the SGNSC the operator places the ignition switch in the start position for no more than how many seconds?

Explanation

The operator must place the ignition switch in the start position for no more than 10 seconds to start the SGNSC.

Submit
37. Which is the proper compressor oil level when checking the sight glass on the MC20 air compressor

Explanation

The correct answer is "Any oil level present in the sight glass." This means that as long as there is some oil visible in the sight glass, the compressor oil level is considered proper. It doesn't matter if the oil level is at the bottom, halfway up, or even close to the top of the sight glass. As long as there is oil present, it indicates that there is enough lubrication for the compressor to function properly.

Submit
38. Which are the two lifting capacities (pounds) of the davit lift pulley on the split deck maintenance platform?

Explanation

The davit lift pulley on the split deck maintenance platform has two lifting capacities: 250 pounds and 500 pounds.

Submit
39. Which valve protects the MJ-2A-1 hydraulic test stand from over pressurization when the unit is not operating?

Explanation

The thermal relief valve protects the MJ-2A-1 hydraulic test stand from over pressurization when the unit is not operating by releasing excess pressure caused by thermal expansion. This valve is designed to open at a specific temperature and relieve the pressure to prevent damage to the system.

Submit
40. The ACE 802S air conditioner compressor switch must be held in the HOLD position when engaging the compressor in order to

Explanation

When engaging the compressor, holding the ACE 802S air conditioner compressor switch in the HOLD position allows the compressor oil and discharge pressures to stabilize. This is important because it ensures that the compressor operates efficiently and effectively. Stabilizing the oil and discharge pressures helps to prevent any sudden surges or fluctuations that could potentially damage the compressor or other components of the air conditioning system. By allowing these pressures to stabilize, the compressor can function properly and provide the desired cooling effect.

Submit
41. While operating the split deck maintenance platform you realize the platform will not lower, the most probable cause could be 

Explanation

The most probable cause for the platform not lowering while operating the split deck maintenance platform is a defective control cable. This could be due to a malfunction or damage in the control cable, preventing it from properly functioning and lowering the platform.

Submit
42. The MC20 air compressor provides which kind of air for pneumatic tools and tire inflation?

Explanation

The MC20 air compressor provides low pressure air for pneumatic tools and tire inflation. Low pressure air is typically used for tasks that require less force or power, such as inflating tires or operating smaller pneumatic tools. High pressure air, on the other hand, is used for tasks that require more force or power, such as operating heavy-duty pneumatic tools or machinery. Therefore, the MC20 air compressor is specifically designed to deliver low pressure air for these specific applications.

Submit
43. The most obvious and easiest way of isolating most hydraulic malfunctions is to look for 

Explanation

Looking for fluid under the unit is the most obvious and easiest way of isolating most hydraulic malfunctions because if there is fluid leaking from the hydraulic system, it indicates a problem with the system. Fluid under the unit could be a sign of a leak in the hydraulic lines, hoses, or seals, which can cause slow or erratic operation of the hydraulic system. Therefore, identifying fluid under the unit can help pinpoint the source of the malfunction and allow for necessary repairs to be made.

Submit
44. Which valve protects the MJ-2A-1 hydraulic test stand from over pressurization when the unit is not operating?

Explanation

The thermal relief valve protects the MJ-2A-1 hydraulic test stand from over pressurization when the unit is not operating. This valve is designed to open and release excess pressure in the system when the temperature exceeds a certain limit, preventing damage to the equipment. It ensures the safety and longevity of the test stand by relieving pressure caused by thermal expansion.

Submit
45. Which MJ-2A-1 hydraulic test stand switch provides an alternate means of energizing the fill pump when either of the micro switches are defective?

Explanation

The LS4 fill switch provides an alternate means of energizing the fill pump when either of the micro switches are defective. This means that if either of the micro switches that are responsible for energizing the fill pump are not working properly, the LS4 fill switch can be used as a backup to still activate the fill pump.

Submit
46. How can a restriction in a refrigerant system be identified?

Explanation

A restriction in a refrigerant system can be identified by observing frosting at the outlet of a component. When there is a restriction in the system, the flow of refrigerant is reduced, causing a decrease in pressure and temperature at the outlet of the component. This leads to the formation of frost on the component. Therefore, the presence of frosting indicates a restriction in the refrigerant system.

Submit
47. Refirgerant leaving the evaporator coil, in the MA-3D air conditioner, is a 

Explanation

The refrigerant leaving the evaporator coil in the MA-3D air conditioner is a low pressure gas. This is because the evaporator coil is where the refrigerant absorbs heat from the surrounding air and evaporates, changing from a liquid to a gas. As a result, the refrigerant exits the evaporator coil as a low pressure gas, ready to be compressed and condensed in the next stage of the cooling process.

Submit
48. If the air intake of the AF/M32T-1 cabin leakage tester was restricted, which effect would it have on operation?

Explanation

If the air intake of the AF/M32T-1 cabin leakage tester was restricted, it would result in a low blower output. This means that the device would not be able to generate a strong airflow, which could affect its ability to accurately test for cabin leaks. The restricted air intake would hinder the blower's performance, leading to a decrease in the amount of air being circulated and ultimately resulting in a low blower output.

Submit
49. Which MA-3D air conditioner control switch allows the operator to control the overall volume of air leaving the unit?

Explanation

The correct answer is "Airflow" because the airflow control switch on the MA-3D air conditioner allows the operator to control the overall volume of air leaving the unit. This switch regulates the speed at which the blower fan operates, determining the amount of air that is being circulated and ultimately controlling the airflow. By adjusting the airflow, the operator can increase or decrease the amount of air being delivered, providing control over the cooling or heating capacity of the air conditioner.

Submit
50. Which MHU-83C/E bomblift component supplies the brake valve and caliperrs with fluid?

Explanation

The system pump is responsible for supplying the brake valve and calipers with fluid in the MHU-83C/E bomblift. This pump is a crucial component of the hydraulic system and is designed to generate the necessary pressure to operate the brakes. Without the system pump, the brake valve and calipers would not receive the fluid needed to effectively stop the bomblift, compromising its safety and functionality.

Submit
51. In troubleshooting, which is the first step that must be completed when a unit comes in with a write-up?

Explanation

The first step that must be completed when a unit comes in with a write-up is to recognize the write-up as a problem. This means acknowledging that there is an issue or complaint that needs to be addressed. By recognizing the write-up as a problem, the technician can then proceed to investigate and diagnose the issue further. It is important to acknowledge the write-up before moving on to other troubleshooting steps to ensure that all concerns are properly addressed.

Submit
52. When a FL-1D floodlight set comes in with a writeup how do you verify a malfunction exists?

Explanation

To verify a malfunction in a FL-1D floodlight set, the best approach would be to operate the unit. By turning on the floodlight set and observing its performance, any malfunction or issue with the unit can be identified. This step allows for a direct assessment of the unit's functionality and helps in determining if there is a malfunction or not. Analyzing the problem, performing a service inspection, and giving several probable causes can be subsequent steps after verifying the malfunction through operating the unit.

Submit
53. The purpose of the MJ2A-1 hydraulic test stand fill and bleed system is to fill the hydraulic system with fluid and 

Explanation

The purpose of the MJ2A-1 hydraulic test stand fill and bleed system is to purge entrapped air before operation. This means that the system is designed to remove any air that may be trapped within the hydraulic system before it is put into operation. This is important because air can cause issues with the performance and operation of the hydraulic system, and it needs to be removed to ensure proper functioning.

Submit
54. On a basic rotary compressor, which prevents air from leaving the discharge port while the intake port is taking air in?

Explanation

A sliding barrier is a component in a basic rotary compressor that prevents air from leaving the discharge port while the intake port is taking air in. It is designed to create a seal and ensure that the compressed air flows in the desired direction, improving the compressor's efficiency and performance.

Submit
55. The purpose of the low pressure pump on the MJ-2A-1 is to ensure a constant flow of fluid to the 

Explanation

The purpose of the low pressure pump on the MJ-2A-1 is to ensure a constant flow of fluid to the high pressure pump. The high pressure pump requires a steady supply of fluid in order to function properly and generate the necessary pressure for the system. The low pressure pump helps maintain this flow by providing a consistent source of fluid, ensuring that the high pressure pump can operate efficiently and effectively.

Submit
56. How do you check the MHU-83C/E bomblift shift lock lever for proper operation?

Explanation

When checking the MHU-83C/E bomblift shift lock lever for proper operation, an audible click will be heard and the locking lever will move upward. This indicates that the shift lock lever is functioning correctly.

Submit
57. Which valve must be opened when setting up the MJ-2A-1 hydraulic test stand controls for operation?

Explanation

The return system bypass valve must be opened when setting up the MJ-2A-1 hydraulic test stand controls for operation. This valve allows the hydraulic fluid to bypass the return system, ensuring that the fluid flows back to the reservoir instead of going through the test stand controls. By opening this valve, the hydraulic system can operate smoothly and efficiently without any restrictions or pressure build-up.

Submit
58. Which is the proper level in the SGNSC hydraulic reservoir?

Explanation

The correct answer is 1/2 inch below the top of the glass. This is the proper level in the SGNSC hydraulic reservoir because it allows for enough space for the hydraulic fluid to expand when heated without overflowing. It also ensures that there is enough fluid in the reservoir to properly lubricate and cool the hydraulic system.

Submit
59. Heat added to a gas is 

Explanation

When heat is added to a gas and it undergoes a phase change, such as changing from a gas to a superheated gas, it is referred to as superheat. Superheated gas is a state where the gas is heated above its boiling point without changing into a liquid. This additional heat energy is known as superheat and is used in various applications such as in power plants or industrial processes.

Submit
60. Which A/M32C-10D airconditioner component extracts energy from bleed air on the air cycle machine?

Explanation

The expansion turbine is the component of the A/M32C-10D air conditioner that extracts energy from bleed air on the air cycle machine. This turbine is responsible for expanding the high-pressure air, which in turn drives the compressor and provides the necessary energy for the air conditioning system to function effectively.

Submit
61. When operating the New Generation Heater (NGH), turn the heat control switch to the desired position after

Explanation

The correct answer is to turn the heat control switch to the desired position after the system voltage indicates 120 volts alternating current (VAC). This means that the NGH should only be operated when the system voltage reaches the specified level to ensure safe and proper functioning.

Submit
62. During an operation check of a SGNSC the engine is running at 3000 revolutions per minute (rpm), but the nitrogen purity does not reach 95.5 percent within 30 minutes. Which is the probable cause?

Explanation

The warming door not being lowered for cold weather operating conditions is the probable cause for the engine not reaching the required nitrogen purity within 30 minutes. This suggests that the engine is not receiving the necessary warm air for proper operation in cold weather, which is affecting the nitrogen purity.

Submit
63. The B-4 adjustable aircraft maintenance platform can attain heights of a minimum of  

Explanation

The correct answer is 3 feet to a maximum of 7 ft. This means that the B-4 adjustable aircraft maintenance platform can be adjusted to a minimum height of 3 feet and a maximum height of 7 feet. This range of height options allows for flexibility in maintenance and repair tasks, as different areas of the aircraft may require different levels of access.

Submit
64. A refrigerant reclaimer is used to 

Explanation

A refrigerant reclaimer is a device that is used to remove refrigerant from a system and store it for future use. Additionally, it is also capable of separating oil and acids from the refrigerant. This is important because oil and acids can contaminate the refrigerant and affect its performance. Therefore, a refrigerant reclaimer serves the purpose of both removing and storing the refrigerant, as well as ensuring its purity by separating any impurities present in it.

Submit
65. An A/M32C-10D air conditioner air cycle machine consists of 

Explanation

The A/M32C-10D air conditioner air cycle machine consists of an expansion turbine and a compressor fan. The expansion turbine is responsible for expanding the compressed air, which cools it down. The compressor fan then compresses the cooled air, increasing its pressure. This cycle of expansion and compression helps to regulate the temperature of the air and provide cooling.

Submit
66. Which type of pump is used on the MJ-1B bomblift truch hydrostatic system?

Explanation

The correct answer is variable displacement. Variable displacement pumps are commonly used in hydraulic systems where the flow rate needs to be adjusted based on the load requirements. In the case of the MJ-1B bomblift truck hydrostatic system, a variable displacement pump would allow for precise control of the hydraulic fluid flow, enabling efficient operation of the system. This type of pump can vary the displacement of the fluid, allowing for flexibility in adjusting the flow rate as needed.

Submit
67. Heat that can be felt and added or subtracted to a substance without changing its state is called 

Explanation

Sensible heat refers to the heat that can be felt and added or subtracted to a substance without changing its state. Unlike latent heat, which is absorbed or released during a change in state (such as melting or vaporization), sensible heat affects the temperature of a substance directly. Specific heat, on the other hand, is the amount of heat required to raise the temperature of a unit mass of a substance by one degree Celsius. Superheat, in the context of thermodynamics, refers to the temperature of a substance above its boiling point at a given pressure.

Submit
68. Which is the purpose of the MHU-83c/e bomblift rear control shutoff valve

Explanation

The purpose of the MHU-83c/e bomblift rear control shutoff valve is to cut off fluid flow through the rear control valves.

Submit
69. Which valve must be opened prior to starting the ACE 802S air conditioner engine?

Explanation

Prior to starting the ACE 802S air conditioner engine, the air shutoff valve must be opened. This valve controls the flow of air into the engine, allowing it to start and operate properly. Opening the air shutoff valve ensures that the engine receives the necessary air supply for combustion, which is essential for the engine to function correctly.

Submit
70. Which must be accomplished to avoid damage prior to operating the ACE 802S air conditioner in the HEATING mode after COOLING mode operation?

Explanation

To avoid damage prior to operating the ACE 802S air conditioner in the HEATING mode after COOLING mode operation, it is necessary to permit refrigerant pressure to equalize. This is important because the refrigerant pressure needs to stabilize and equalize before switching between the two modes. If the pressure is not allowed to equalize, it can cause damage to the system and affect its performance.

Submit
71. Which position must the reservoir selector valve be in when filling and bleeding the MJ-2A-1 hydraulic test stand hydraulic system?

Explanation

The reservoir selector valve must be in the "AIRCRAFT" position when filling and bleeding the MJ-2A-1 hydraulic test stand hydraulic system. This position allows the hydraulic fluid to flow directly from the aircraft's hydraulic system into the test stand, ensuring that the system is properly filled and bled.

Submit
72. The hydraulic test stand high pressure pump is difficult to repair because of its 

Explanation

The hydraulic test stand high pressure pump is difficult to repair because of its precision tolerances. This means that the pump requires very precise measurements and alignments in order to function properly. Any slight deviation or error in these tolerances can lead to malfunctioning or inefficiency of the pump. Therefore, repairing such a pump requires a high level of skill and expertise to ensure that the precision tolerances are maintained.

Submit
73. Which is the reservoir fluid capacity and system pressure of the hydraulic pump on the B-6, 10 ton hydraulic tripod jack?

Explanation

The correct answer is 1.2 gallons at 2235 psi. This means that the reservoir fluid capacity of the hydraulic pump on the B-6, 10 ton hydraulic tripod jack is 1.2 gallons, and the system pressure is 2235 pounds per square inch (psi).

Submit
74. The heater control unit (HCU) on the New Generation Heater (NGH) starts the main air fan for output air when 

Explanation

When the inside temperature reaches 140 degrees Fahrenheit, the heater control unit (HCU) on the New Generation Heater (NGH) starts the main air fan for output air.

Submit
75. Which provides pressurized oil to the rotor blades of the MC-2A rotary slicing vane compressor?

Explanation

The hollow rotor shaft provides pressurized oil to the rotor blades of the MC-2A rotary slicing vane compressor. The hollow design allows oil to flow through the shaft and reach the blades, ensuring proper lubrication and cooling. This helps maintain the efficiency and performance of the compressor by reducing friction and heat buildup.

Submit
76. Which is the setting of the MJ02A-1 hydraulic test stand system relief valve?

Explanation

The setting of the MJ02A-1 hydraulic test stand system relief valve is 300 psi above the required test pressure. This means that the relief valve will open when the pressure in the system exceeds the required test pressure by 300 psi.

Submit
77. Which MJ-1B bomblift component converts hydraulic pressure into mechanical motion?

Explanation

The lift arm cylinders in the MJ-1B bomblift are responsible for converting hydraulic pressure into mechanical motion. These cylinders use the force of the hydraulic fluid to extend and retract, allowing the lift arm to move up and down. This mechanical motion is essential for lifting and lowering bombs efficiently and safely. The engine, piston pump, and cradle control valves are not directly involved in converting hydraulic pressure into mechanical motion in this context.

Submit
78. Refrigerant is always removed through the 

Explanation

The receiver outlet valve is the correct answer because it is the valve through which refrigerant is removed from the receiver. The receiver is a storage tank in a refrigeration system where the refrigerant is stored after it has been condensed. When the refrigerant needs to be removed from the system, it is done so through the receiver outlet valve.

Submit
79. The out put volume (gallons per minute) of the MJ-2A-1 hydraulic test stand high pressure pump is controlled by the 

Explanation

The output volume of the MJ-2A-1 hydraulic test stand high pressure pump is controlled by the volume control. This means that the volume of hydraulic fluid being pumped per minute can be adjusted using this control. The other options listed, such as the flow control valve, compensator control, and flowmeter assembly, do not directly control the output volume of the pump.

Submit
80. Which action occurs in the ACE 802A air conditioner evaporator? 

Explanation

The correct answer is "Boiling refrigerant absorbs heat from the air stream." In an air conditioner evaporator, the refrigerant undergoes a phase change from a liquid to a gas. This phase change is caused by the low pressure and temperature in the evaporator coil. As the refrigerant boils, it absorbs heat from the surrounding air stream, resulting in the cooling effect that is desired in an air conditioner.

Submit
81. Which type of wrench should be used on brass or aluminum fittings?

Explanation

The correct answer is "Tubing". When working with brass or aluminum fittings, it is recommended to use a tubing wrench. This type of wrench is designed specifically for tightening or loosening fittings on tubing, providing a secure grip without damaging the fittings. Using an open-end wrench or any other type of wrench may result in damage to the fittings or improper tightening, which can lead to leaks or other issues.

Submit
82. Which is the overflow tank capacity (gallons) on the PMU-29/E oil cart?

Explanation

The correct answer is 2. The question asks for the overflow tank capacity on the PMU-29/E oil cart, and the correct answer is 2 gallons.

Submit
83. You observe low cabin pressure reading during operation of the AF/M32T-1 cabin leakage tester, a probable cause could be a defective

Explanation

A low cabin pressure reading during operation of the AF/M32T-1 cabin leakage tester could be caused by a defective rate valve. The rate valve is responsible for controlling the flow of air into the cabin, and if it is defective, it may not be allowing enough air into the cabin, resulting in low pressure readings. The other options, such as the blower pressure gauge, cabin pressure gauge, and flowmeter, may not directly impact the flow of air into the cabin and therefore would not likely be the cause of the low pressure reading.

Submit
84. Which medium does the ACE 802S airconditioner heat boost system use to trim output air temperature?

Explanation

The ACE 802S air conditioner heat boost system uses engine coolant to trim the output air temperature. Engine coolant is circulated through the system to absorb heat from the air and then release it outside the vehicle. This allows the air conditioner to effectively cool the interior of the vehicle by reducing the temperature of the air blown into the cabin.

Submit
85. A good refirgerant will 

Explanation

A good refrigerant should operate in low to moderate pressure because high-pressure refrigerants can be dangerous and increase the risk of leaks or explosions. Low to moderate pressure refrigerants are safer to handle and less likely to cause damage to the refrigeration system. Additionally, operating in low to moderate pressure allows for more efficient heat transfer and better performance of the refrigeration system.

Submit
86. The engine safety circuits on the FL-1D floodlight set shut down the engine by 

Explanation

The engine safety circuits on the FL-1D floodlight set shut down the engine by shutting off fuel to the engine. This means that the fuel supply to the engine is cut off, preventing the engine from receiving fuel and causing it to stop running. This is a common safety feature in many engines, as it helps prevent accidents or damage that could occur if the engine were to continue running without control.

Submit
87. On the MA-3D air conditioner, which component shuts off the compressor when suction pressure drops below 5 pounds of pressure?

Explanation

The temperature controller is responsible for shutting off the compressor when the suction pressure drops below 5 pounds of pressure. It senses the temperature and pressure in the system and activates or deactivates the compressor accordingly. This ensures that the compressor does not operate when the pressure is too low, which could potentially damage the system.

Submit
88. Which component in the pneumatic system of the AF/M32T-1 cabin leakage tester limits system pressure to 15 pounds per square inch (psi)?

Explanation

The safety relief valve in the pneumatic system of the AF/M32T-1 cabin leakage tester limits system pressure to 15 pounds per square inch (psi). This valve is designed to automatically open and release excess pressure in the system to prevent damage or failure. By setting the pressure limit to 15 psi, the safety relief valve ensures that the system operates within safe parameters and prevents over pressurization.

Submit
89. On the MC-2A rotary sliding vane compressor, the minimim pressure valve does all of the following except

Explanation

The MC-2A rotary sliding vane compressor's minimum pressure valve is responsible for ensuring minimum pressure within the oil chamber, preventing receiver air from flowing back to the compressor by working as a check valve, and increasing the efficiency of the felt pads by ensuring they receive a constant minimum air pressure. However, it does not have a direct role in ensuring minimum pressure to the condensate drain.

Submit
View My Results

Quiz Review Timeline (Updated): May 21, 2024 +

Our quizzes are rigorously reviewed, monitored and continuously updated by our expert board to maintain accuracy, relevance, and timeliness.

  • Current Version
  • May 21, 2024
    Quiz Edited by
    ProProfs Editorial Team
  • Mar 29, 2018
    Quiz Created by
    D. Crook
Cancel
  • All
    All (89)
  • Unanswered
    Unanswered ()
  • Answered
    Answered ()
When servicing the hydraulic cart, which prevents large particles in...
Repair of ground heater equipment should never be attempted 
If a bomblift starter failed to operate, which step should be taken...
At which storage cylinder pressure, in pounds per square inch gauge...
Which must be done before lowering the ram on the B-6 tripod jack?
Which must be done prior to raising or lowering the mast from the...
Where can you find test procedures for a particular component on a...
During the MJ-1B bomblift operation check, all hydraulic components...
Which type of mechanism does the B-4 adjustable aircraft maintenance...
When trouble shooting the MJ-1B bomblift electrical system, which...
Which section of the MD-1 towbar has a screw actuated fork assembly...
Every how many years is the hydrostatic test due on the receiver tank...
Which position is the valve handle places in to precharge the PMU-29/E...
The chain hoist on the universal jack tester is operated by
Which MJ-1B bomblift valve prevents collapsing of the cantilever...
When should starting aids be used to start the New Generation Heater...
When verifying the proper operation of the MHU-83C/E bomblift...
The volume of oil delivered from the hydraulic pump to the hydrostatic...
Which position should the vent valve be in when liquid oxygen (LOX)...
Which component provides manual speed adjustment on the AF/M32T-1...
The purpose of the lift mechanism on the MD-1 tow bar is to 
Which type of refrigeration system leak occurs when the pressure...
Check the MHU-83C/E bomblift backup hydraulic system by 
Which valve is used to slowly raise or lower the MJ-1B bomblift arms?
As soon as the MJ-1B engine starts, check for sufficient
Oil in a rotary vane compressor
How is the air compressor in the self generating nitrogen servicing...
Which component on the B-1 adjustable aircraft maintenance platform...
When starting the MA-3D air conditioner, hold the safety override...
Which is important to keep in mind when performing maintenance on the...
In which position is the engine switch placed to energize the electric...
Continuous movement of pressurized hydraulic fluid in the MJ-1B...
Which is the compressor displacement when the ACE 802S air conditioner...
Which MJ-2A-1 hydraulic test stand engine system safety device sounds...
Which prevents over pressurization of the steering system on the MJ-1B...
To start the SGNSC the operator places the ignition switch in the...
Which is the proper compressor oil level when checking the sight glass...
Which are the two lifting capacities (pounds) of the davit lift pulley...
Which valve protects the MJ-2A-1 hydraulic test stand from over...
The ACE 802S air conditioner compressor switch must be held in the...
While operating the split deck maintenance platform you realize the...
The MC20 air compressor provides which kind of air for pneumatic tools...
The most obvious and easiest way of isolating most hydraulic...
Which valve protects the MJ-2A-1 hydraulic test stand from over...
Which MJ-2A-1 hydraulic test stand switch provides an alternate means...
How can a restriction in a refrigerant system be identified?
Refirgerant leaving the evaporator coil, in the MA-3D air conditioner,...
If the air intake of the AF/M32T-1 cabin leakage tester was...
Which MA-3D air conditioner control switch allows the operator to...
Which MHU-83C/E bomblift component supplies the brake valve and...
In troubleshooting, which is the first step that must be completed...
When a FL-1D floodlight set comes in with a writeup how do you verify...
The purpose of the MJ2A-1 hydraulic test stand fill and bleed system...
On a basic rotary compressor, which prevents air from leaving the...
The purpose of the low pressure pump on the MJ-2A-1 is to ensure a...
How do you check the MHU-83C/E bomblift shift lock lever for proper...
Which valve must be opened when setting up the MJ-2A-1 hydraulic test...
Which is the proper level in the SGNSC hydraulic reservoir?
Heat added to a gas is 
Which A/M32C-10D airconditioner component extracts energy from bleed...
When operating the New Generation Heater (NGH), turn the heat control...
During an operation check of a SGNSC the engine is running at 3000...
The B-4 adjustable aircraft maintenance platform can attain heights of...
A refrigerant reclaimer is used to 
An A/M32C-10D air conditioner air cycle machine consists of 
Which type of pump is used on the MJ-1B bomblift truch hydrostatic...
Heat that can be felt and added or subtracted to a substance without...
Which is the purpose of the MHU-83c/e bomblift rear control shutoff...
Which valve must be opened prior to starting the ACE 802S air...
Which must be accomplished to avoid damage prior to operating the ACE...
Which position must the reservoir selector valve be in when filling...
The hydraulic test stand high pressure pump is difficult to repair...
Which is the reservoir fluid capacity and system pressure of the...
The heater control unit (HCU) on the New Generation Heater (NGH)...
Which provides pressurized oil to the rotor blades of the MC-2A rotary...
Which is the setting of the MJ02A-1 hydraulic test stand system relief...
Which MJ-1B bomblift component converts hydraulic pressure into...
Refrigerant is always removed through the 
The out put volume (gallons per minute) of the MJ-2A-1 hydraulic test...
Which action occurs in the ACE 802A air conditioner evaporator? 
Which type of wrench should be used on brass or aluminum fittings?
Which is the overflow tank capacity (gallons) on the PMU-29/E oil...
You observe low cabin pressure reading during operation of the...
Which medium does the ACE 802S airconditioner heat boost system use to...
A good refirgerant will 
The engine safety circuits on the FL-1D floodlight set shut down the...
On the MA-3D air conditioner, which component shuts off the compressor...
Which component in the pneumatic system of the AF/M32T-1 cabin leakage...
On the MC-2A rotary sliding vane compressor, the minimim pressure...
Alert!

Advertisement