Sia 101 - Week 3

15 Questions | Attempts: 24
Please wait...
Question 1 / 16
🏆 Rank #-- ▾
0 %
0/100
Score 0/100

1. COTS is an acronym for_____

Submit
Please wait...
About This Quiz
Sia 101 - Week 3 - Quiz

System Integration and Architecture 1Week 3

2.

What first name or nickname would you like us to use?

You may optionally provide this to label your report, leaderboard, or certificate.

2. BCP_____

Submit

3. _____ are statements that identify the essential needs of a system in order for it to have value and utility.

Submit

4. In this step there is no transformation of the requirements, but simple classification and categorization. For example, requirements may be grouped into functional vs. nonfunctional requirements.

Submit

5. Requirements determination addresses the gathering and documenting of the true and real requirements for the Information System being developed.

Submit

6. Requirements is the wants and /or needs of the user within a problem domain.

Submit

7. Match the following

Submit

8. Is an open-industry standard for BP modeling and was developed by the BPMI

Submit

9. Fact – Finding Methods

Submit

10. User Requirements are statements in Natural language  plus diagrams of services the system provides, together with its operational constraints.

Submit

11. Business process modeling is the graphical representation of a company's business processes or workflows, as a means of identifying potential improvements.

Submit

12. It is the easiest and most widely used BP modeling techniques. The way this works is pretty self-explanatory – you map your processes step by step.

Submit

13. The starting point of the requirements engineering process is an elicitation process that involves a number of people to ensure consideration of a broad scope of potential ideas and candidate problems

Submit

14. It can be carried out exactly the same way as flowcharts, with the only difference being that you'd be using the elements within the graph as defined by BPMN methodology, not your own preference.

Submit

15. How to do Business Process Modeling?

Submit
×
Saved
Thank you for your feedback!
View My Results
Cancel
  • All
    All (15)
  • Unanswered
    Unanswered ()
  • Answered
    Answered ()
COTS is an acronym for_____
BCP_____
_____ are statements that identify the essential needs of a...
In this step there is no transformation of the requirements, but...
Requirements determination addresses the gathering and documenting of...
Requirements is the wants and /or needs of the user within a problem...
Match the following
Is an open-industry standard for BP modeling and was developed by the...
Fact – Finding Methods
User Requirements are statements in Natural language  plus...
Business process modeling is the graphical representation of a...
It is the easiest and most widely used BP modeling techniques. The way...
The starting point of the requirements engineering process is an...
It can be carried out exactly the same way as flowcharts, with the...
How to do Business Process Modeling?
play-Mute sad happy unanswered_answer up-hover down-hover success oval cancel Check box square blue
Alert!