Materials Engineer Review

100 Questions | Attempts: 1068
Please wait...
Question 1 / 101
🏆 Rank #-- ▾
0 %
0/100
Score 0/100

1. A Department order tells that no acceptance and final payment shall be made on completed concrete and Asphalt pavement unless core test for thickness determination and density is conducted.

Submit
Please wait...
About This Quiz
Material Engineer Quizzes & Trivia

Materials engineers are responsible for the research, specification, design, and development of materials to advance technologies and products of many kinds. Their expertise lies in understanding the properties and behaviors of different substances, from raw materials to finished products. Take the quiz review to gauge your understanding so far. All... see morethe best! see less

2.

What first name or nickname would you like us to use?

You may optionally provide this to label your report, leaderboard, or certificate.

2. The trial section for compaction for each type of fill materials and type of equipment to be used in the work should have an area of__________.                                                                                       

Submit

3. This is a new method of soil stabilization being introduced to improved the properties of soil which is effective and at the same time cheaper

Submit

4. When concrete must be placed in a sloping surface, placing should start at the __________.                    

Submit

5. All asphalt are _______, they became harder as temperature decreases and  softer as their temperature increases

Submit

6. A type of cement that sets and hardens by chemical interaction with water and is capable of doing so underwater

Submit

7.
  1. What test determined the crushing of strength of aggregates to ensure that course aggregates will not degrade to smaller ones.

Submit

8. The component of bituminous mixes which range from 92 to 96% is called __________.                    

Submit

9. Oversanded and undersanded concrete mixtures require more water in order to be workable but will only result to ______________.                                                                                                             

Submit

10. Problems regarding quality of construction materials shall be reported directly by the Contractor's Materials Engineer to the ____________.                                                                                  

Submit

11. For major interchanges and busy intersection, PCCP will be allowed to open on the ________ to minimize occurrence of road congestion.                                                                                                  

Submit

12. How is the consistency of liquid asphalt determined?                                                                                

Submit

13. The design of concrete mix specified by the blue book is based on ________________.                    

Submit

14. A department order hereby directed that the only test report issued by the regional/district laboratories of department and other testing laboratories accredited by DPWH shall be allowed to be used in acceptance or rejection of construction materials

Submit

15. In direct shear test, the soil is sheared to failure by moving one part of the soil sample relatively to the other part along a pre-determined plane. When several test are made on a soil under different normal loads and the results are plotted in arithmetic scales, the resulting line is made in the form of ____________.                                                                                                         

Submit

16. Shringkage factor test is _______________.                                                                                       

Submit

17. The minimum testing requirement for every project is indicated in a duly approved________.       

Submit

18. The wearing away of the pavement surface caused by the dislodging of aggregate particle is called ______________.                                                                                                                          

Submit

19.  ____________ is a property of bituminous mixes in pavement adjust itself to settlement                      

Submit

20. ___________ is a reflector which shall be the short base type having a maximum base area of 180 mm x 140 mm.                                                                                                                               

Submit

21. What is the minimum number of representative cores that shall be taken from each member area of concrete in place that is considered deficient?                                                                             

Submit

22. In conducting soil exploration survey, what equipment you will use in obtaining undisturbed samples

Submit

23. It is a period wherein the asphalt begins to melt.                                                                                        

Submit

24. For small contract project of the DPWH located in remote areas where the quality of cement to be used is too small and where there are no accessible testing laboratory to check the quality of materials, exception in the requirements for performance of laboratory test in cement prior to use may be allowed provided that the trial mixes be done for every ___________.                                

Submit

25. No contractor shall start any concreting without a pouring permit duly approved and issued by Proj. Engr

Submit

26. As per guidelines on submission of samples, laboratory trial mixes should be made on aggregates which are proposed tube used for the first time, in this case what is the weight of fine aggregates to be submitted for testing?                                                                                             

Submit

27. Where to determine the amount of mixing water to use when compacting the soil in the field to attain maximum density

Submit

28. This is the characteristic generally used for calculation of the volume occupied by the aggregate in various mixture containing aggregates including Portland Cement concrete, bituminous concrete, and other mixtures that are proportioned or analyzed on an absolute volume basis: 

Submit

29. ____________ is a property of bituminous mixes in pavement to resist disintegration or deterioration due to the action of water, traffic and changing climate                                                    

Submit

30.  The higher the ________, the lower the penetration.                                                                           

Submit

31. Correcting projects with noted defects/deficients prior to partial full payment

Submit

32. A process of volatilization test  which measures the relative proportion of asphalt to oil

Submit

33. Retempering of concrete or mortar, which has partially hardened, will be permitted with the addition of cement, aggregate or water

Submit

34. The phosphorous content of reinforcing steel bars bigger than 9.0 mm shall not exceed 

Submit

35. Control slip shall have an area of approximately ____________.                                                           

Submit

36.  What control during the mixing and compaction of the bituminous pavement is of great significance in the resulting pavement

Submit

37. Amendment to DO 184, series of 1999, re-Guidelines on the Accreditation of Contractoors & Consultant's Materials Engineer.

Submit

38. The __________ material shall be of such quality that it will not darken or become yellow when a thin section is exposed to sunlight.                                                                                        

Submit

39. Reactivation of the quality assurance unit regional office

Submit

40. The apparatus used to determine the initial and final setting of cement in the laboratory is _________.

Submit

41. This is the empirical indicator of the clay fraction of a binder material in a stabilized soil mixture.                                                                                                                                                       

Submit

42.  As Materials Engineer, what would you recommend in order to check the suitability and efficiency of the equipment to used prior to subbase construction for item 310, Bituminous Concrete Surface Course?                                                                                                                        

Submit

43. The quality of paving concrete is usually measured by its _____________.                                          

Submit

44. _________ is a type of cement which shall be transferred to an elevated, air tight and weather proof bins storage

Submit

45. A departmnet order memorandum circular, a revised method for FDT.

Submit

46. Generally speaking, batching of concrete aggregates by volume is preferable than weight.                      

Submit

47. Standard Specification for Chemical Admixtures for Concrete?

Submit

48. In a bituminous mix, there are 3 kinds of aggregate. What kind of passes the no. 200 sieve

Submit

49. Job-mix formula submitted for approval shall propose definite single values for, except _____.               

Submit

50. Quality of factor – produced reinforced concrete pipes may be best established through what?     

Submit

51. The apparatus used in determining the consistency of asphalt cement is ___________.                        

Submit

52. A deprtment order series of 1997 give supplement guidelines on the conduct of project assestment by the quality assurance unit regional office.

Submit

53. Adoption of DPWH Standard Specifications for Public Works and Highways 1995 edition Vol II in the Implementation of all Infrastructure Project

Submit

54. Portland cement stabilization roadmix base course is an intimate mixture of pulverized soil, Portland cement and water which is thoroughly compacted while in a moist condition to form a structural road material when the cement hydrates and crystallizes. What is the mass percent  wear of soil aggregate used  in this stabilization?                                                                                   

Submit

55. A departmnet order series of 1997, revised DPWH Standard Specification for Elastrometric bearing pads for bridge super structures.

Submit

56. Guidelines for re-coring of Concrete pavement and concrete structures for strength determination.

Submit

57. A department order which uses a fly ash in concrete.

Submit

58. This is the most fluidest and lightest of all the grade of Medium Curing Cut-back Asphalt

Submit

59. Use of High- Early Strength Concrete in the construction of national Roads and Major Exchanges.

Submit

60. When water is added to the mixture to bring the slump within required limit, it shall be injected into the mixer under such pressure and direction of flow that the requirement for uniformity and desired slump of concrete are met. The drum shall be turned on additional _______ revolution or more.                                                                                                                                  

Submit

61. ____________ is a property of bituminous mixes in pavement to resist deformation or displacement due to impose load or repeated loading

Submit

62. A department order for sampling and testing of materials

Submit

63. A Department order for testing and acceptance of concrete.

Submit

64. The strength level of concrete will be considered satisfactory if the average of all sets of three consecutive strength test result equal or exceed the specified strength and no individual strength test result is deficient by more than how many percent?                                                                

Submit

65. The bottom bearing block shall be at least _______ thick after any resurfacing operations.

Submit

66. The composition of yellow paint shall be _______ pigment and ______ vehicle.                                      

Submit

67. The required thickness of the thermoplastic paint in PCCP is ____0.33L/sq.m______.                                        

Submit

68. Utilizing first the services of the Bereau of Research and Standards,Regional & District Laboratories in testing of samples of construction materials

Submit

69. How many days shall the Engineer be notified in advance of the date that the treating process will be performed in order that the untreated lumber, the treatment process and the finished treatment timber may all be inspected?                                                                                                     

Submit

70. For a rich mixture of cement in concrete, what determines the flexural strength of the concrete

Submit

71. What primarily influence the grade of asphalt to be selected?                                                                    

Submit

72. Mass percent loose for fine aggregates when tested in Clay lumps is _____.                                     

Submit

73. An apparatus used to determine the specific gravity of asphalt is called 

Submit

74. A Memorandum Circular Order states that all Materilas men in-charge in a said project shall keep a logbook on materials quality control.

Submit

75. The mass percent of wear of coarse aggregates for item 311 when tested by AASHTO 96 is not greater than ____________.                                                                                                                        

Submit

76. A memorandum circular for where the contractor Is required to provide quality control personnel and fully equipped laboratory building.

Submit

77. Bituminous stabilization in the process of mixing intimately pulverized soil and bituminous material. What is the minimum bearing capacity (soaked CBR ) of the mixture?                               

Submit

78. The viscosity of the asphalt during mixing and lay down is ____________.                                         

Submit

79. The bottom bearing block shall be at least _____ thick when new                                                          

Submit

80. The bearing blocks of the compression machine should be at least _____ greater than the diameter of the specimen.                                                                                                          

Submit

81. Use of Different brands or same brand of ce`ment in concrete constructon.

Submit

82. The final setting time of Portland cement Type I is _____________.                                                          

Submit

83. The only kind of asphalt that can be used in all bituminous item of work.                                                    

Submit

84. Proper edging on forms and joints of concrete pavement.

Submit

85. Testing of Construction materials intended for regular maintenance projects.

Submit

86. Penetration and ductility test of asphalt are done in __________ temperature.                                 

Submit

87. For pavement markings, the composition of white paint shall be _______ pigment and ______% of vehicle                                                                                                                                

Submit

88. Rate of application for curing compound is _______________.                                                           

Submit

89. It pertains to the relative density of the soil material making up the constituents particle not including the pore space within the particles that is accessible to water.

Submit

90. If the fine aggregates are subjected to five cycles of sodium sulfate soundness test, the weighted loss shall not exceed ___________                                                                                             

Submit

91. Traffic paint shall be applied to the pavement at the rate of 0.33 li/sq. m. and shall dry sufficiently to be free it from cracking from ___________.                                                                

Submit

92. The pour point of concrete joint sealer shall be at least­­________________ lower than the safe heating temperature, which is the maximum temperature to which the material may be heated without exceeding the permitted flow.

Submit

93. Expansion joint filler having a nominal thickness of less than ________ mm. shall not be subject to a requirement for water absorption.                                                                                           

Submit

94. The maximum percent abrasion loss allowed for concrete coarse aggregate is __________.                 

Submit

95.  The initial setting time of Portland cement is not less than _________________.                                    

Submit

96. For soil classification purposes as in AASHTO M45, what is not required

Submit

97. The surface of riprap shall not vary from the theoretical surface by more than ______ mm at any point.                                                                                                                                              

Submit

98. Proper construction and sealing of joints of concrete in concrete contruction.

Submit

99. The penetration of concrete joint sealer, Hot Poured Elastic Type shall not exceed_­­­_____

Submit

100. A memorandum circular for guidelines and submission of samples.

Submit
×
Saved
Thank you for your feedback!
View My Results
Cancel
  • All
    All (100)
  • Unanswered
    Unanswered ()
  • Answered
    Answered ()
A Department order tells that no acceptance and final payment shall be...
The trial section for compaction for each type of fill materials and...
This is a new method of soil stabilization being introduced to...
When concrete must be placed in a sloping surface, placing should...
All asphalt are _______, they became harder as temperature decreases...
A type of cement that sets and hardens by chemical interaction with...
What test determined the crushing of strength of aggregates to ensure...
The component of bituminous mixes which range from 92 to 96% is called...
Oversanded and undersanded concrete mixtures require more water in...
Problems regarding quality of construction materials shall be reported...
For major interchanges and busy intersection, PCCP will be allowed to...
How is the consistency of liquid asphalt determined?   ...
The design of concrete mix specified by the blue book is based on...
A department order hereby directed that the only test report issued by...
In direct shear test, the soil is sheared to failure by moving one...
Shringkage factor test is...
The minimum testing requirement for every project is indicated in a...
The wearing away of the pavement surface caused by the dislodging of...
 ____________ is a property of bituminous mixes in pavement...
___________ is a reflector which shall be the short base type having a...
What is the minimum number of representative cores that shall be taken...
In conducting soil exploration survey, what equipment you will use in...
It is a period wherein the asphalt begins to melt.     ...
For small contract project of the DPWH located in remote areas where...
No contractor shall start any concreting without a pouring permit duly...
As per guidelines on submission of samples, laboratory trial mixes...
Where to determine the amount of mixing water to use when compacting...
This is the characteristic generally used for calculation of the...
____________ is a property of bituminous mixes in pavement to resist...
 The higher the ________, the lower the...
Correcting projects with noted defects/deficients prior to partial...
A process of volatilization test  which measures the relative...
Retempering of concrete or mortar, which has partially hardened, will...
The phosphorous content of reinforcing steel bars bigger than 9.0 mm...
Control slip shall have an area of approximately...
 What control during the mixing and compaction of the bituminous...
Amendment to DO 184, series of 1999, re-Guidelines on the...
The __________ material shall be of such quality that it will not...
Reactivation of the quality assurance unit regional office
The apparatus used to determine the initial and final setting of...
This is the empirical indicator of the clay fraction of a binder...
 As Materials Engineer, what would you recommend in order to...
The quality of paving concrete is usually measured by its...
_________ is a type of cement which shall be transferred to an...
A departmnet order memorandum circular, a revised method for FDT.
Generally speaking, batching of concrete aggregates by volume is...
Standard Specification for Chemical Admixtures for Concrete?
In a bituminous mix, there are 3 kinds of aggregate. What kind of...
Job-mix formula submitted for approval shall propose definite single...
Quality of factor – produced reinforced concrete pipes may be...
The apparatus used in determining the consistency of asphalt cement is...
A deprtment order series of 1997 give supplement guidelines on the...
Adoption of DPWH Standard Specifications for Public Works and Highways...
Portland cement stabilization roadmix base course is an intimate...
A departmnet order series of 1997, revised DPWH Standard Specification...
Guidelines for re-coring of Concrete pavement and concrete structures...
A department order which uses a fly ash in concrete.
This is the most fluidest and lightest of all the grade of Medium...
Use of High- Early Strength Concrete in the construction of national...
When water is added to the mixture to bring the slump within required...
____________ is a property of bituminous mixes in pavement to resist...
A department order for sampling and testing of materials
A Department order for testing and acceptance of concrete.
The strength level of concrete will be considered satisfactory if the...
The bottom bearing block shall be at least _______ thick after any...
The composition of yellow paint shall be _______ pigment and ______...
The required thickness of the thermoplastic paint in PCCP is...
Utilizing first the services of the Bereau of Research and...
How many days shall the Engineer be notified in advance of the date...
For a rich mixture of cement in concrete, what determines the flexural...
What primarily influence the grade of asphalt to be selected? ...
Mass percent loose for fine aggregates when tested in Clay lumps is...
An apparatus used to determine the specific gravity of asphalt is...
A Memorandum Circular Order states that all Materilas men in-charge in...
The mass percent of wear of coarse aggregates for item 311 when tested...
A memorandum circular for where the contractor Is required to provide...
Bituminous stabilization in the process of mixing intimately...
The viscosity of the asphalt during mixing and lay down is...
The bottom bearing block shall be at least _____ thick when new ...
The bearing blocks of the compression machine should be at least _____...
Use of Different brands or same brand of ce`ment in concrete...
The final setting time of Portland cement Type I is...
The only kind of asphalt that can be used in all bituminous item of...
Proper edging on forms and joints of concrete pavement.
Testing of Construction materials intended for regular maintenance...
Penetration and ductility test of asphalt are done in __________...
For pavement markings, the composition of white paint shall be _______...
Rate of application for curing compound is _______________. ...
It pertains to the relative density of the soil material making up the...
If the fine aggregates are subjected to five cycles of sodium sulfate...
Traffic paint shall be applied to the pavement at the rate of 0.33...
The pour point of concrete joint sealer shall be at...
Expansion joint filler having a nominal thickness of less than...
The maximum percent abrasion loss allowed for concrete coarse...
 The initial setting time of Portland cement is not less than...
For soil classification purposes as in AASHTO M45, what is not...
The surface of riprap shall not vary from the theoretical surface by...
Proper construction and sealing of joints of concrete in concrete...
The penetration of concrete joint sealer, Hot Poured Elastic Type...
A memorandum circular for guidelines and submission of samples.
play-Mute sad happy unanswered_answer up-hover down-hover success oval cancel Check box square blue
Alert!