Zick Compressor Station Ssop Operator Qualification 2020

Reviewed by Editorial Team
The ProProfs editorial team is comprised of experienced subject matter experts. They've collectively created over 10,000 quizzes and lessons, serving over 100 million users. Our team includes in-house content moderators and subject matter experts, as well as a global network of rigorously trained contributors. All adhere to our comprehensive editorial guidelines, ensuring the delivery of high-quality content.
Learn about Our Editorial Process
| By LB Feduchak
L
LB Feduchak
Community Contributor
Quizzes Created: 1 | Total Attempts: 52
| Attempts: 52 | Questions: 15
Please wait...
Question 1 / 15
0 %
0/100
Score 0/100
1. How many ESD pull buttons are located in Phase 2 compressor building?

Explanation

There are 12 ESD pull buttons located in the Phase 2 compressor building.

Submit
Please wait...
About This Quiz
Zick Compressor Station Ssop Operator Qualification 2020 - Quiz

The Zick Compressor Station SSOP Operator Qualification 2020 quiz assesses knowledge of operational procedures effective from 12-12-2019, including emergency and normal shutdowns, pipeline specifications, and safety protocols. It is crucial for ensuring compliance and operational safety.

Personalize your quiz and earn a certificate with your name on it!
2. Match the following
Submit
3. Section 8.0 refers to Startup After Emergency Shut Down (ESD)

Explanation

Section 8.0 does not refer to Startup After Emergency Shut Down (ESD), so the statement is false.

Submit
4. Section 10.0 Refers to _____

Explanation

Section 10.0 refers to Operating Limits and Deviations. This section likely provides information and guidelines regarding the acceptable operating limits and deviations for a specific system or process. It may outline the parameters within which the system or process can operate safely and effectively, as well as any allowable deviations from those limits. Understanding this section is important for ensuring that the system or process is operated within its designated limits to prevent any potential issues or failures.

Submit
5. Montana Penton has reviewed this SSOP document on which date(s)

Explanation

Montana Penton reviewed the SSOP document on two dates: 6-30-2017 and 4-13-2018.

Submit
6. Appendix A refers to ?

Explanation

Appendix A refers to PSVs, which stands for Public Service Vehicles. This term is commonly used to refer to vehicles that are used for public transportation purposes, such as buses, minibusses, or taxis. Appendix A likely contains information, regulations, or guidelines specific to PSVs, such as licensing requirements, safety standards, or operational procedures.

Submit
7. The effective date of this procedure is ?

Explanation

The effective date of this procedure is 12-12-2019.

Submit
8. Station discharge gas moisture content must remain below 7lbs of water per million standard cubic feet (MMSCF)

Explanation

The statement is stating that the moisture content of the gas discharged from the station must be below 7lbs of water per million standard cubic feet (MMSCF). The answer "True" means that this statement is correct and the moisture content of the discharged gas must indeed remain below the specified limit.

Submit
9. Under normal operation, gas enters the facility through what two size pipelines?

Explanation

The correct answer is 12" and 20". This means that under normal operation, gas enters the facility through pipelines of two different sizes, namely 12" and 20".

Submit
10. Two SSOP best practices are?

Explanation

The two SSOP best practices are to read all appropriate actions carefully prior to beginning the given task and to observe symbols and their associated messages. These practices ensure that the task is performed correctly and safely. Reading the actions carefully helps in understanding the steps involved and any precautions that need to be taken. Observing symbols and their associated messages helps in interpreting visual cues and understanding any warnings or instructions related to the task. These best practices promote efficiency, accuracy, and safety in performing SSOP tasks.

Submit
11. During the normal start up of Compressor Unit 8- what is the permissive fluid set point for Jacket Water?

Explanation

The permissive fluid set point for Jacket Water during the normal start-up of Compressor Unit 8 is 150 degrees F. This means that the Jacket Water temperature needs to reach or exceed 150 degrees F in order for the start-up process to proceed.

Submit
12. This SSOP document is how many pages long?

Explanation

The SSOP document is 167 pages long.

Submit
13. The warning label in Section 3.9.12 refers to observing speed restrictions posted on the CAT panel- True/False?

Explanation

The warning label in Section 3.9.12 refers to observing speed restrictions posted on the CAT panel. This means that there is indeed a warning label in Section 3.9.12 that specifically pertains to the importance of following speed restrictions displayed on the CAT panel. Therefore, the statement "True" is the correct answer.

Submit
14. Section 5.10 refers to ?

Explanation

Section 5.10 refers to the normal shutdown of compressor Unit 3.

Submit
15. Match the following
Submit
View My Results

Quiz Review Timeline (Updated): Mar 21, 2023 +

Our quizzes are rigorously reviewed, monitored and continuously updated by our expert board to maintain accuracy, relevance, and timeliness.

  • Current Version
  • Mar 21, 2023
    Quiz Edited by
    ProProfs Editorial Team
  • Aug 12, 2020
    Quiz Created by
    LB Feduchak
Cancel
  • All
    All (15)
  • Unanswered
    Unanswered ()
  • Answered
    Answered ()
How many ESD pull buttons are located in Phase 2 compressor building?
Match the following
Section 8.0 refers to Startup After Emergency Shut Down (ESD)
Section 10.0 Refers to _____
Montana Penton has reviewed this SSOP document on which date(s)
Appendix A refers to ?
The effective date of this procedure is ?
Station discharge gas moisture content must remain below 7lbs of water...
Under normal operation, gas enters the facility through what two size...
Two SSOP best practices are?
During the normal start up of Compressor Unit 8- what is the...
This SSOP document is how many pages long?
The warning label in Section 3.9.12 refers to observing speed...
Section 5.10 refers to ?
Match the following
Alert!

Advertisement