Week 5 - Nov'16

15 Questions | Attempts: 101
Share
Please wait...
Question 1 / 15
0 %
0/100
Score 0/100
1. A written approval on mail is mandatory for a DC, if the client(Broker) requires the DC to collect property from out of his assigned Area (locality / sub-locality).
Submit
Please wait...
About This Quiz
Week 5 - Nov16 - Quiz

.

Tell us your name to personalize your report, certificate & get on the leaderboard!
2. In case broker has objections on building view we will delete it from the front end, if DC mentions "Remove building view" in the comments box but the collection of every building view is compulsory.
Submit
3. Laser device should be used to collect measurements for ceiling and dimension of a flat
Submit
4. Ceiling height measurement should always be done in (m) unit and the device has to be placed on floor and point the laser light on the roof.
Submit
5. Even though the broker doesn’t want building view, it has to be collected and broker should be informed that it will not be shown on the front end.
Submit
6. Elevated view of the main entrance is collected to show that there is no flat no.
Submit
7. Wings should have only letters or nos.(If there are exceptions bring photos which show the wing name)
Submit
8. Every extra minute taken by DC while collecting photographs ensures,1. Reduced error markdown.2. Higher incentives.
Submit
9. DC should write ‘No Building View’ in comments to state that the broker doesn’t want to show the building view
Submit
10. Floor count should not include ground floor.
Submit
11. Building should have a name and not building/plot nos.
Submit
12. The laser device should always be pointed to
Submit
13. In case of an attached balcony with bedroom / Kitchen / Living room (select all that apply).
Submit
14. If the DC captures the Elevated view of the Main Door Entrance, Then
Submit
15. Plot no. or building no. will not be acceptable
Submit
View My Results

Quiz Review Timeline (Updated): Mar 21, 2022 +

Our quizzes are rigorously reviewed, monitored and continuously updated by our expert board to maintain accuracy, relevance, and timeliness.

  • Current Version
  • Mar 21, 2022
    Quiz Edited by
    ProProfs Editorial Team
  • Nov 26, 2016
    Quiz Created by
    Parag_nigam
Cancel
  • All
    All (15)
  • Unanswered
    Unanswered ()
  • Answered
    Answered ()
A written approval on mail is mandatory for a DC, if the...
In case broker has objections on building view we will delete...
Laser device should be used to collect measurements for ceiling and...
Ceiling height measurement should always be done in (m) unit and the...
Even though the broker doesn’t want building view, it has to be...
Elevated view of the main entrance is collected to show that there is...
Wings should have only letters or nos.(If there are exceptions bring...
Every extra minute taken by DC while collecting photographs ensures,1....
DC should write ‘No Building View’ in comments to state that the...
Floor count should not include ground floor.
Building should have a name and not building/plot nos.
The laser device should always be pointed to
In case of an attached balcony with bedroom / Kitchen / Living room...
If the DC captures the Elevated view of the Main Door Entrance, Then
Plot no. or building no. will not be acceptable
Alert!

Advertisement