Week 5 - Nov'16

15 Questions | Attempts: 101
Please wait...
Question 1 / 16
🏆 Rank #--
Score 0/100

1. A written approval on mail is mandatory for a DC, if the client(Broker) requires the DC to collect property from out of his assigned Area (locality / sub-locality).

Submit
Please wait...
About This Quiz
Week 5 - Nov16 - Quiz

.

2.

What first name or nickname would you like us to use?

You may optionally provide this to label your report, leaderboard, or certificate.

2. In case broker has objections on building view we will delete it from the front end, if DC mentions "Remove building view" in the comments box but the collection of every building view is compulsory.

Submit

3. Laser device should be used to collect measurements for ceiling and dimension of a flat

Submit

4. Ceiling height measurement should always be done in (m) unit and the device has to be placed on floor and point the laser light on the roof.

Submit

5. Even though the broker doesn’t want building view, it has to be collected and broker should be informed that it will not be shown on the front end.

Submit

6. Elevated view of the main entrance is collected to show that there is no flat no.

Submit

7. Wings should have only letters or nos.(If there are exceptions bring photos which show the wing name)

Submit

8. Every extra minute taken by DC while collecting photographs ensures,1. Reduced error markdown.2. Higher incentives.

Submit

9. DC should write ‘No Building View’ in comments to state that the broker doesn’t want to show the building view

Submit

10. Floor count should not include ground floor.

Submit

11. Building should have a name and not building/plot nos.

Submit

12. The laser device should always be pointed to

Submit

13. In case of an attached balcony with bedroom / Kitchen / Living room (select all that apply).

Submit

14. If the DC captures the Elevated view of the Main Door Entrance, Then

Submit

15. Plot no. or building no. will not be acceptable

Submit
×
Saved
Thank you for your feedback!
View My Results
Cancel
  • All
    All (15)
  • Unanswered
    Unanswered ()
  • Answered
    Answered ()
A written approval on mail is mandatory for a DC, if the...
In case broker has objections on building view we will delete...
Laser device should be used to collect measurements for ceiling and...
Ceiling height measurement should always be done in (m) unit and the...
Even though the broker doesn’t want building view, it has to be...
Elevated view of the main entrance is collected to show that there is...
Wings should have only letters or nos.(If there are exceptions bring...
Every extra minute taken by DC while collecting photographs ensures,1....
DC should write ‘No Building View’ in comments to state that the...
Floor count should not include ground floor.
Building should have a name and not building/plot nos.
The laser device should always be pointed to
In case of an attached balcony with bedroom / Kitchen / Living room...
If the DC captures the Elevated view of the Main Door Entrance, Then
Plot no. or building no. will not be acceptable
play-Mute sad happy unanswered_answer up-hover down-hover success oval cancel Check box square blue
Alert!