Principles Of Soil Erosion and Sedimentation Control! Trivia Questions Quiz

13 Questions | Attempts: 56
Please wait...
Question 1 / 14
🏆 Rank #--
Score 0/100

1. The federal government published rules in 1990 that required storm water discharge _____________ for various industrial activities, including construction.

Submit
Please wait...
About This Quiz
Principles Of Soil Erosion and Sedimentation Control! Trivia Questions Quiz - Quiz

This trivia questions quiz is on Principles of Soil Erosion and Sedimentation Control! The earth’s upper surface faces a lot of threats thanks to deforestation where people cut of trees and do not plant others in their place, therefore leaving no blanket to prevent the soil from being carried away... see moreby water. Take the quiz and see if you know how to control these effects. see less

2.

What first name or nickname would you like us to use?

You may optionally provide this to label your report, leaderboard, or certificate.

2. When conducting inspections the ____________ site should be inspected, not just the SESC measures.

Submit

3. The job of a Certified Operator at a construction site is to ___________ and __________ back to the construction permittee (landowner) the SESC measures needing maintenance or repair.

Submit

4. The ________________ of the SESC measures in need of maintenance must be recorded in the Certified Operator's site log at a construction site.

Submit

5. The construction activity should be inspected once per week and within ________ hours after a rain event that causes a discharge from the site.

Submit

6. The written inspection logs must be kept on-site during construction, made available for _________ inspection, and retained on file by the construction permittee for a minimum of __________ years.

Submit

7. A good understanding of storm water runoff is essential to consider when selecting ____________ measures.

Submit

8. State law requires that permitted discharges be under the supervision of a _____________________.

Submit

9. To receive coverage under Permit-By-Rule, the construction permittee must obtain coverage under ____________ and send in the Notice of Coverage form.

Submit

10. If a construction site will have an earth disturbance of ______________ or more acres and a __________________ source discharge, the owner must apply for coverage under the Permit-By-Rule.  (Sites one to five acres receive automatic coverage upon obtaining a Part 91 permit.)

Submit

11. Under Part 31 of Act 451 the maximum penalty per day per violation of the storm water Permit-By-Rule is ________________.

Submit

12. Under Permit-By-Rule, the construction permittee must be the ________________ or the recorded easement holder.

Submit

13. The Certified Operator must keep an inspection _______ of all inspections performed on-site.

Submit
×
Saved
Thank you for your feedback!
View My Results
Cancel
  • All
    All (13)
  • Unanswered
    Unanswered ()
  • Answered
    Answered ()
The federal government published rules in 1990 that required storm...
When conducting inspections the ____________ site should be inspected,...
The job of a Certified Operator at a construction site is to...
The ________________ of the SESC measures in need of maintenance must...
The construction activity should be inspected once per week and within...
The written inspection logs must be kept on-site during construction,...
A good understanding of storm water runoff is essential to consider...
State law requires that permitted discharges be under the supervision...
To receive coverage under Permit-By-Rule, the construction permittee...
If a construction site will have an earth disturbance of...
Under Part 31 of Act 451 the maximum penalty per day per violation of...
Under Permit-By-Rule, the construction permittee must be the...
The Certified Operator must keep an inspection _______ of all...
play-Mute sad happy unanswered_answer up-hover down-hover success oval cancel Check box square blue
Alert!