Quality Center

60 Questions | Attempts: 1091
Share

SettingsSettingsSettings
Process Management Quizzes & Trivia

Questions and Answers
  • 1. 
     By default, records appear in Quality Center in the  
    • A. 

      Increasing Order

    • B. 

      Decreasing Order

    • C. 

      Order in which they were added

    • D. 

      None of these

  • 2. 
    You can save filter and sort information as a favorite view and then load it as needed.
    • A. 

      True

    • B. 

      False

  • 3. 
    You can copy and paste the filter, sort, and group by settings to another project.
    • A. 

      True

    • B. 

      False

  • 4. 
    You can also share the settings (filter, sort, and group by settings) with another user by pasting them to an e-mail or a text file
    • A. 

      True

    • B. 

      False

  • 5. 
    When you use text search, the search ignores  
    • A. 

      Articles (a, an, the)

    • B. 

      Coordinate conjunctions (and, but, for, nor, or);

    • C. 

      Boolean operators (and, or, not, if, or, then).

    • D. 

      All of above

  • 6. 
    You can export the data in a grid as a   
    • A. 

      Text file

    • B. 

      Microsoft Excel worksheet

    • C. 

      HTML document

    • D. 

      All of above

  • 7. 
      …….. alerting functions available in Quality Center  
    • A. 

      Three

    • B. 

      Four

    • C. 

      Two

    • D. 

      Five

  • 8. 
    The alerting functions in Quality Center are: 
    • A. 

      Automatic notification alerts, Follow up alerts

    • B. 

      Email alerts, Automatic notification alerts, Follow up alerts

    • C. 

      Defect alerts, Email alerts, Automatic notification alerts, Follow up alerts

    • D. 

      Final alerts, Email alerts, Automatic notification alerts, Follow up alerts

  • 9. 
    You can create traceability links between ……….. in the Requirements module
    • A. 

      Requirements

    • B. 

      Test Cases

    • C. 

      Tests

    • D. 

      Defects

  • 10. 
    You can associate a test instance with a defect. This is performed by creating ………..in the Test Plan module, or by adding a defect during a manual test run. 
    • A. 

      Linked Tests

    • B. 

      Linked Defects

    • C. 

      Linked Errors

    • D. 

      Linked Data

  • 11. 
    QA Manager changes a requirement from a ……….. status to a Reviewed status once it is approved.
    • A. 

      Released

    • B. 

      Tested

    • C. 

      Not reviewed

    • D. 

      None of these

  • 12. 
    You can also import requirements to your Quality Center project from Microsoft Word, Excel, or other third-party requirement management tools. To import requirements, you must first install the appropriate………  
    • A. 

      HP Third Party add-in.

    • B. 

      HP Quality Center add-in.

    • C. 

      HP Quality Center

    • D. 

      HP Quality Center License

  • 13. 
    The Requirements Grid view enables you to display requirements in a …………….view.  
    • A. 

      Flat

    • B. 

      Hierarchical

    • C. 

      Flat-hierarchical

    • D. 

      Flat non-hierarchical

  • 14. 
    The …………view enables you to analyze the breakdown of child requirements according to test coverage status..
    • A. 

      Coverage Analysis

    • B. 

      Coverage Requirements

    • C. 

      Coverage

    • D. 

      Coverage Tests

  • 15. 
    You can access the Requirements menu bar from the Requirements module by pressing the shortcut key …….  
    • A. 

      F1

    • B. 

      F1

    • C. 

      Ctrl + R

    • D. 

      Alt + R

  • 16. 
    You can use the ………to restrict and dynamically change the fields and values in the Requirements module
    • A. 

      Script Edit

    • B. 

      Scriptor Editor

    • C. 

      Script Editor

  • 17. 
    The Requirements module enables you to define and manage your……...  
    • A. 

      Requirements

    • B. 

      All requirements

    • C. 

      Some requirements

    • D. 

      Tedious requirements

  • 18. 
    You can rename or delete Requirements root folder.  
    • A. 

      True

    • B. 

      False

  • 19. 
    You can search for a particular requirement in the requirements tree or in the requirements grid using the …….command. 
    • A. 

      Search

    • B. 

      Find

    • C. 

      Search All

    • D. 

      Find All

  • 20. 
    You can replace field values in the requirements tree or in the requirements grid using the …….command.  
    • A. 

      Replace

    • B. 

      Replace All

    • C. 

      Find & Replace

    • D. 

      Replace & Find

  • 21. 
    Each requirement type with risk-based quality management enabled supports either. 
    • A. 

      risk analysis or risk assessment

    • B. 

      Risk breakdown or risk assessment

    • C. 

      Risk breakdown or risk review

    • D. 

      Risk analysis or risk evaluation

  • 22. 
    Performing a risk-based quality management analysis for an analysis requirement involves the following steps  
    • A. 

      Determine Risk groups, Define Testing Policy Settings, Finalize Testing Policy, Analyze Testing Strategy

    • B. 

      Determine Risk Categories, Define Testing guidelines Settings, Finalize Testing Policy, Analyze Testing Strategy

    • C. 

      Determine Risk Categories, Define Testing Policy Settings, Finalize Testing guidelines, Analyze Testing Strategy

    • D. 

      Determine Risk Categories, Define Testing Policy Settings, Finalize Testing Policy, Analyze Testing Strategy

  • 23. 
    An ...... requirement is a requirement belonging to a type that represents higher levels in the requirements tree hierarchy, such as the Folder type.  
    • A. 

      Analysis

    • B. 

      Assessment

    • C. 

      Policy

    • D. 

      Test

  • 24. 
    An ....... requirement is a requirement belonging to a type that represents requirements that are children of analysis requirements and at a lower level in the requirements tree hierarchy.  
    • A. 

      Analysis

    • B. 

      Assessment

    • C. 

      Policy

    • D. 

      Test

  • 25. 
     For each assessment requirement under the analysis requirement, you determine the Risk Category. The Risk Category is composed of two factors.
    • A. 

      Business Probability and Failure Criticality

    • B. 

      Business Vitality and Failure Probability

    • C. 

      Business Criticality and Failure Probability

    • D. 

      Business Criticality and Failure Possibility

Back to Top Back to top
×

Wait!
Here's an interesting quiz for you.

We have other quizzes matching your interest.