Take this test May 2009 prepared for SCDL exam from previous assignments.
MOSS [ Multi Operation Scheduling System ]
PCS [ Project Control System ]
GERT [ Graphical Evaluation Review Techniques ]
FOQS [Fixed Order Quantity System]
Lack of availability of material in time
Lack of availability of supervisor in time
Lack of staff in shift
Load balancing not done properly
Continuous flow of material
High skilled labour
Low skilled labour
Easy supervision
Time study
Work measurement study
Work sampling
Production study
Reduces
Increases
True
False
True
False
Seasonal fluctuation
Analytical estimate
True
False
2691
2692
2693
2695
Standard reorder quantity
Re-order point
Maximum stock
Minimum stock
Less than 25
Less than 35
Less than 40
Less than 55
Marketing forecast
Sales forecast
TV
Car
True
False
PPC
Material department
Industrial engineering
Production department
Low
High
True
False
True
False
True
False
Event time
Mean time
Lead time
Earliest event time
Moving average
Exponential smothering
Curve fitting
Products per hour
Increasing investment/sales ratio
Increasing profit & decreasing inventory
Algorithms
Program code
Database
Operating system
Safety stock is kept to take care of increase in demand during lead time as well as to meet demand when lead time is extended.
Re-order level equals safety stock plus average consumption during lead time
Average inventory equals safety stock plus half of reorder quantity.
Stock of finished goods
Wait!