Manual Testing Questions By Pavan Lalwani

30 Questions | Total Attempts: 864

SettingsSettingsSettings
Please wait...
Manual Testing Questions By Pavan Lalwani

This Question Bank is specially designed for Freshers


Questions and Answers
  • 1. 
    How many Steps are there in SDLC
    • A. 

      3

    • B. 

      4

    • C. 

      5

    • D. 

      6

  • 2. 
    The First Step in SDLC is
    • A. 

      Analysis

    • B. 

      Design

    • C. 

      Problem or Oportunity Identification

    • D. 

      Development and Documentation

  • 3. 
    In the Analysis Phase , the development of the ____________ occurs, which is a clear statement of the goals and objectives of the project
    • A. 

      Documentation

    • B. 

      Flowchart

    • C. 

      Program Specification

    • D. 

      Design

  • 4. 
    Actual programming of the software code is done during the _________ step in SDLC
    • A. 

      Maintanence and Evaluation

    • B. 

      Design

    • C. 

      Analysis

    • D. 

      Development and documentation

  • 5. 
    The __________ determines whether the project should go forward
    • A. 

      Feasibility assessment

    • B. 

      Opportunity identification

    • C. 

      System evaluation

    • D. 

      Program specification

  • 6. 
    ___________ manage the system development , assign staff , manage the budget and reporting , and ensure that deadlines are met
    • A. 

      Project managers

    • B. 

      Netword engineers

    • C. 

      Graphic designers

    • D. 

      System analysts

  • 7. 
    The problem statement should include all of the following except
    • A. 

      Input

    • B. 

      Output

    • C. 

      Processing

    • D. 

      Storage

  • 8. 
     Which of the following statements about component testing is not true?
    • A. 

      Component testing should be performed by development

    • B. 

      Component testing is also know as isolation or module testing

    • C. 

      Component testing should have completion criteria planned

    • D. 

      Component testing does not involve regression testing

  • 9. 
    In a system designed to work out the tax to be paid: An employee has $4000 of salary tax free. The next $1500 is taxed at 10% The next $28000 is taxed at 22% Any further amount is taxed at 40%.  To the nearest $ which of these is a valid Boundary Value Analysis test case?
    • A. 

      $1500

    • B. 

      $32001

    • C. 

      $28000

    • D. 

      $33501

  • 10. 
    Values less than 10 are rejected, values between 10 and 21 are accepted, values greater than or equal to 22 are rejected. Which of the following covers the MOST boundary values?
    • A. 

      A. 9,10,11,22

    • B. 

      B. 9,10,21,22

    • C. 

      C. 10,11,21,22

    • D. 

      D. 10,11,20,21

  • 11. 
    Functional testing is mostly
    • A. 

      A. Validation techniques

    • B. 

      B. Verification techniques

    • C. 

      C. Both of the above

    • D. 

      D. None of the above

  • 12. 
    Reviews and inspections are done over :
    • A. 

      Only Executable software work products

    • B. 

      Only non - Executable software work products

    • C. 

      Both Executable and non-excetable software work products

    • D. 

      Neither executable and nor non-executable software work products

  • 13. 
    When are reviews done?
    • A. 

      Detect and correct defects

    • B. 

      Ensure consistency with customer requirements

    • C. 

      Ensure adherence to standards

    • D. 

      All of the above

  • 14. 
    Which of the following is true about reviews?
    • A. 

      Reviews increase the cost of a project since it requires a lot of extra effort

    • B. 

      A hardworking and sincere team does not require review

    • C. 

      Reviews are one of the best industry practices

    • D. 

      Reviews can only be done by senior staff

  • 15. 
    Which of the following is a type of formal review
    • A. 

      Buddy Review

    • B. 

      Inspection

  • 16. 
    Which of the following is not a type of review?
    • A. 

      Peer review

    • B. 

      Test inspection

    • C. 

      Process Review

    • D. 

      Fagan's inspection

  • 17. 
    Which of the following does not help to decide the type of review required?
    • A. 

      Type of the work product

    • B. 

      Size of the work product

    • C. 

      Business criticallity

    • D. 

      Complexity of work product

  • 18. 
    Which of the following is not a role in facilitation review?
    • A. 

      Producer

    • B. 

      Director

    • C. 

      Reivewer/Leader

    • D. 

      Reader

  • 19. 
    Which of the following is a part of Test Planning
    • A. 

      Selecting best Test

    • B. 

      Low cost

    • C. 

      All above

  • 20. 
    What is the main difference between Boundary Value analysis and Equivalence Partioning
    • A. 

      BVA - We only check the boundary values and +or of that values

    • B. 

      EP- First we divide the boundary values into some range with respect to that range we can check

    • C. 

      Both A & b

    • D. 

      None

  • 21. 
    Define test Procedure?
    • A. 

      The detailed Instructions for the Set-up, execution and evaluation of the results for a given test case

    • B. 

      The results are observed or recorded and an evaluation is made of some aspect of the system or component

    • C. 

      Both A & B

  • 22. 
    What is the AIM of Cause-Effect Graphing?
    • A. 

      A Graphical representation of inputs (causes) with their associated outputs (effects) used in designing test cases

    • B. 

      Brain storm session to find out the related causes and effects untill we reach the goal

    • C. 

      Produces non redundant , high yield tests

    • D. 

      None of the above

  • 23. 
    What are the advantages of Boundary Value Analysis ?
    • A. 

      Very good at exposing potential user interface/ user input problems

    • B. 

      Very Clear guidelines on determining test cases

    • C. 

      Very small set of test cases generated

    • D. 

      None of the above

  • 24. 
    What are the advantages of Equivalence Partioning?
    • A. 

      By identifying and testing one input of each partition , we gain a 'good' coverage with small number of test cases

    • B. 

      Testing one input of a partition should be as testing any inputs for the partition

    • C. 

      Not guaranteed that the system under test treats all sets of an equivalence class in the same way

    • D. 

      None of the above

  • 25. 
    Which is is a not a part of static testing
    • A. 

      Reviews

    • B. 

      Inspections

    • C. 

      Walkthroughs

    • D. 

      None

Back to Top Back to top