Concrete
Mortar
Grout
Putty
Make plaster thinner
Add more cement
Less water
Apply more plasticizers
28 days
14 days
7 day
1 day
Mix proportion of sand and cement, then put gravel on top, water it, then mix
Mix cement, sand and gravel, then put water and mix
Mix proportion of sand and gravel, then put cement on top, water it, then mix
None
Gravity wall
Block wall
Shear wall
Mass concrete wall
Coil ties system
Bracing system
Wall system
Metal formwork system
Gravity wall
Block wall
Shear wall
Mass wall
200 bags of cement, 10 cu. m. of sand and 20 cu.m. of gravel
180 bags of cement, 10 cu. m. of sand and 20 cu.m. of gravel
180 bags of cement, 10 cu. m. of sand and 10 cu.m. of gravel
Metal plate
Coign
Peso
Queen block
350mm
400mm
450mm
480mm
Flange and stem
flange and web flange
flange and fillet
None
Cast iron
casting bed
Cushion bed
None
Cement mixture
Water cement ratio
Amount of cement
Water ratio
Stripping
clearing
Deforming work
Screeding
62 cm
100 cm
83 cm
50 cm
Construction joint
Cold joint
Control joint
Contraction joint
Starter bars
Dowel
Diagonal bars
Traversed bars
1:1 1/2 :3
1: 2: 4
1: 2 1/2 : 5
1: 3 : 6
30 x 30 x 30
32 x 32 x 32
32 x 32 x 33
33 x 33 x 32
Concrete finish
Metal cladding
Stucco
Granite cladding
Prevent slipping
Prevent creeping crack
Prevent disoriented accumulation of dirt
Mainly aesthetics
Vitrified tiles
Vinyl tile
Granite tile
Place concrete
Carpenter
Finishing mason
Painter
Foreman
1-bagger
2-bagger
Transit mix
Transit mix with duct
Broom finish
Tyrolean finish
Ducco finish
Stucco finish
Site
Plant
Office
ASTM
Lean concrete
Concrete hollow block
Mass concrete
Mat concrete
Lean concrete
Mat concrete
Foundation concrete
Mass concrete
Fast drying of concrete
Voids in concrete after drying
Retaining of water through hydration
Mixing of water and cement
Put tarpaulin on concrete after pouring
Add admixtures to decrease the time of hardening
Reschedule the pouring of concrete
Any will do
Stick with the schedule, to be covered by tarpaulin if needed
Reschedule
Apply admixture to speed up the curing process
Apply retarders admixture to slow down the hydration of concrete while waiting for the weather to get better
Honeycomb
Slow hardening
The concrete will not achieved its desired design strength
Slows it's hardening process
Use packaging tapes to perimeter frames and to be removed when all are set
Finish all masonry works before installation
Aluminum is not as sensitive as chrome finish, it can be installed before or after base on construction target to finish
Install soft covering and to be removed when concreting is done
Tee and double tee beams
Concrete decking
Waffle slabs
Composite steel decking
Larger beam depths
The beams tend to lose anchorage
Transportation difficulties
Expensive
All mention
1:1:3
1:2:4
1:2.5:5
None
28 hours
4 weeks
1 month
2 months
Construction site
Manufacturing lab test for accurate testing
ASTM
Cylinder test
7 days
14 days
28 days
30 days
650
690
500
750
Cement
Water
Sand
Aggregates
Potable
Mineral water
Sterilized
Distilled
Workability
Cohesiveness
Strength
Elasticity
Plasticity
Moisturizing
Setting
Hardening
Add ample amount of water
Add ample amount water and cement
Add water, cement and gravel
Add moisturizer
Yes
No
Yes, just make it slowly
No, use shovel to spread
Put the poker into the concrete QUICKLY. Take the poker out very SLOWLY
Put the poker into the concrete SLOWLY. Take the poker out very QUICKLY
Put the poker into the concrete SLOWLY. Take the poker out very SLOWLY
Put the poker into the concrete QUICKLY. Take the poker out very QUICKLY
Accelerators
Concrete booster
Retarders
Dispersal agents
Metamorphic
Crushed rock
Igneous
Sedimentary
Gypsum
Ashlar
Clear statuaire
Lime