Please have the ATS GMM Rev05 with you to take the test. You will have UNLIMITED attempts to pass the test by 100%. Good Luck!
True
False
An action taken to eliminate the cause of a detected nonconformity or other undesirable condition to prevent its reoccurrence.
An immediate action taken to eliminate the cause of a detected nonconformity or other undesirable condition.
An action taken to address nonconformity or other undesirable condition to prevent its reoccurrence.
An action taken to address nonconformity or other undesirable condition to prevent.
Standards, policies and procedures and instructions.
Quality System.
Thales IFE parts management.
Maintenance instructions for performing work on IFEC system on installed board aircraft.
True
False
Refer to CATD.
Pay attention to details.
Check your work after completion.
All of the above.
True
False
Is qualified and authorized, per the GMM, to perform the work.
Used the appropriate maintenance documentations to do the work.
Used the correct and approved parts/materials (where applicable)
None of the above
True
False
CATD
Applicable CAA
Customer procedures
None of the above
True
False
Is qualified and authorized, as defined by the GMM, to perform the work.
Used the appropriate maintenance documentations to do the work.
Has the customer’s authorization to sign logbook or equivalent.
None of the above
Return article to its original condition.
Conduct a thorough back check of the article worked on and around the work area to ensure no items are left behind.
Conduct 100% tool/materials accountability audit to account for each and every tool or piece of equipment/materials listed on his/ her inventory as described above.
Notify immediate supervisor if any tool is missing for the appropriate action.
Part 4
Part 9
Part 8
Part 10
True
False
Scheduled maintenance
Defect rectification
Media content loading
Engine change
True
False
PDK
PDL
LMT
DP
Direct supervisor or manager
Maintenance technician lead
Technician performing the work
Inspection of work is not required