The 'Operator Assessment Exam' focuses on the operational standards and safety protocols for downhole equipment in the oil and gas industry. It assesses knowledge on SCSSV testing intervals, leakage rates, pressure monitoring, and equipment requirements under specific conditions, aligning with industry compliance.
True
False
Rate this question:
Notify MMS
Perform a diagnostic test
Monitor Monthly
All of the above
Rate this question:
SCSSV or Plug
GLV or SSV
SCSSV or SSCSSV
All of the Above
Rate this question:
True
False
Rate this question:
During routine wireline operations
No flow wells
Both 1 & 2
Rate this question:
Water drive well, water increases.
BHP is unable to overcome the hydrostatic head when heavier fluids enter the well bore.
Good wells will always flow no matter how much water enters well bore.
Bottom hole pressure continues to increase as the well gets older.
Rate this question:
Decrease flowing tubing psi, increase water production, increase gas production.
Decrease flowing tubing psi, lower gas production, lower total fluid production.
Increase flowing tubing psi, increase gas production, lower total fluid production.
Increase flowing tubing psi, increase BHP, increase casing pressure.
Rate this question:
Pack offs are leaking.
More holes have developed in the tubing above the liquid level
There is a problem with one of the gas lift valves.
More than likely, All of the above.
Rate this question:
The SCSSV is leaking and is a tubing retrievable safety valve.
The well has been depleted and will no longer produce oil & gas.
During hurricane season.
Rate this question:
Increased choke size raised pressure in the flowline above the pilot set point.
Methanol injection rate was not increased and hydrates have formed in the line.
Both 1 and 2.
Neither 1 or 2.
Rate this question:
Static pen indicates flow rate and differential pen indicates valve operation.
Differential pen indicates flow rate and static pen indicates valve operation.
Doesn’t matter which pen you use.
Rate this question:
2 min 45 sec
1 min 15 sec
2 min
1 min 45 sec
Rate this question:
Used to lift heavy equipment
Used to increase gas production.
Used to produce an oil well with low bottom hole pressure
Used to produce water on wells with high bottom hole pressures.
Rate this question:
Down hole valve shut in.
Valve downstream of the well has shut in
Choke body has been cut out.
Well is more than likely loaded up.
Rate this question:
10 sec
30 sec
45 sec
90 sec
Rate this question:
True
False
Rate this question:
True
False
Rate this question:
True
False
Rate this question:
A PSH
A Sand Probe
A PSL
A titanium flow line
Rate this question:
True
False
Rate this question:
True
False
Rate this question:
True
False
Rate this question:
A light fixture
A TSE
A Deluge system
A pressure gauge
Rate this question:
Down hole valve shut in.
Valve downstream of the well has shut in.
High gas sales pressure.
Well has probably been gas lifted and no longer can flow.
Rate this question:
45 degree elbow
90 degree elbow
Short radius elbow
Long radius elbow
Rate this question:
True
False
Rate this question:
Protect downstream equipment in case of dump valve failure
Keep backpressure on vessel.
Keep backpressure on wells.
Everyone knows you don’t put chokes on liquid dump lines
Rate this question:
TSH
TSE
ASH
ESD
Rate this question:
True
False
Rate this question:
Level, pressure, temperature.
Voltage, amperage, frequency.
Oil filled, air filled, electronic.
Timing, strapping, heat.
Rate this question:
Horizontal and vertical.
Two phase and three phase.
Atmospheric and pressure
Oil and Gas.
Rate this question:
True
False
Rate this question:
True
False
Rate this question:
Back pressure valves.
Spill over plates and weirs.
Float assemblies.
Both 2 & 3
Rate this question:
True
False
Rate this question:
True
False
Rate this question:
Disconnected and blind flanged from the header.
Valves closed and tagged.
Valves closed and tied shut
Closed, disconnect control line to SCSSV and Lock close master valve to secure well from flow.
True
False
Rate this question:
Bleed off the downstream side of the ice plug and pump chemicals to thaw.
Bleed off the upstream side of the ice plug and try to back flow the plug to break it up.
Isolate both sides of the ice plug, bleed off each side, let thaw and start pumping methanol.
Rate this question:
The designed working pressure of the vessel.
Whatever the operator decides is the best set pressure he wants.
5% under the designed working pressure.
15% under the designed working pressure.
Rate this question:
PSV
LSH
LSL
Recycle Line
Rate this question:
TSE
PSH
Fire Extinguisher
Flood lights
Rate this question:
True
False
Rate this question:
Move large amounts of liquids usually at low pressure.
Pump liquids into high pressure.
Pump only oil.
Rate this question:
Move large amounts of liquid
Pump liquids into high pressure.
Pump only H2O.
Rate this question:
True
False
Rate this question:
True
False
Rate this question:
True
False
Rate this question:
Quiz Review Timeline (Updated): May 6, 2024 +
Our quizzes are rigorously reviewed, monitored and continuously updated by our expert board to maintain accuracy, relevance, and timeliness.
Wait!
Here's an interesting quiz for you.