Crane lifting and rigging test: trivia quiz. If you are applying for a post as a rigger, you need to know how to use different types of cranes to move around different types of loads in a workstation. Do you know how to match cranes with different capacity and the maximum load weight they can carry? The quiz below will See morebe a perfect way to refresh your memory. Check it out!
5 ton
8 ton
10 ton
12 ton
Rate this question:
Open
Clean
Asphalted
Barricaded
Rate this question:
Cleaned
Painted
Greased
Leveled
Rate this question:
Rigger specialist.
Rigger lll
Rigger ll
Rigger l
Rate this question:
Level and in good condition
Made of asphalt or concrete
Made of soft level sand
Inclined towards the pick-up point
Rate this question:
Engine specifications
Range diagram
Load charts
Operator’s log
Rate this question:
Boom
Radius
Crane reach
Centers
Rate this question:
Lift plan
Cold work permit
Personnel platform permit
Inspection checklist
Rate this question:
Supervisor and signal man
Signalman and riggers
Crane operator and rigger directing the lift
Crane operator and superintendent
Rate this question:
Saudi Aramco safety engineer
Saudi Aramco certified rigger
Saudi Aramco superintendent
Saudi Aramco loss prevention representative
Rate this question:
Riggers certified for the load category
Engineer
Rigger supervisors
Any level rigger
Rate this question:
Wearing safety glasses
Visible to the operator
Positioned under the boom
Positioned behind the crane
Rate this question:
Moving
Vertical
Horizontal
Stationary
Rate this question:
Safety belts
Coveralls
Air packs
Safety gloves
Rate this question:
Phone the lift supervisor to conform the lift parameter
Phone loss prevention to conform lift weight
Check the load weight and radius with the foreman
Physically inspect the lift site
Rate this question:
On boom of the crane
On the load chart
In the maintenance checklist
On the chassis of the crane
Rate this question:
To tie off suspended loads to the hook block
To control the boom swing
To control suspended load site
To tie off suspended loads to the crane
Rate this question:
The signalman and the boom
The signalman and the load
The crane operator and the signalman
The crane operator and the load
Rate this question:
25 degrees
30 degrees
35 degrees
45 degrees
Rate this question:
Shackles
Slings
Lifting beams
Come-longs
Rate this question:
Any model or type
Lattice and hydraulic
Truck-mounted and crawler
Equal capacity and same models
Rate this question:
Lift over the front only
Place pads under the outrigger floats
Place outriggers and tires on the ground
Use only a short boom
Rate this question:
10
12
15
18
Rate this question:
20 mph
30 mph
40 mph
60 mph
Rate this question:
Load chart
Riggers handbook
Saudi Aramco G.I.s
Operator’s manual
Rate this question:
Rigger l
Rigger lI
Rigger lII
Crane and rigging specialist
Rate this question:
The service date
The boom length
The identification plan
The inspection date
Rate this question:
Retracted
Extended
Over the rear
Stowed
Rate this question:
Every 1 month
Every 2 months
Every 6 months
Every year
Rate this question:
The crane must be visible
The lift must be at night
Back-up communications must in place
The signalman must be visible
Rate this question:
28,000 lbs
36,000 lbs
42,000 lbs
47,600 lbs
Rate this question:
Raised to the boom tip
Secured to the carrier
Left to swing free
Secured to the boom
Rate this question:
Drag loads
Lift personnel
Hoist material
Perform tandem lifts
Rate this question:
The width of the crane
The depth of the trench
The width of the trench
The length of the crane
Rate this question:
Front of the crane
Back of the crane
Left side of the crane
Right side of the crane
Rate this question:
Periodic inspections
Annual inspections
Frequent inspections
Daily inspections
Rate this question:
Tied to the drivers cab
Tied back to the boom
Allowed to swing
Tied back to the carrier
Rate this question:
17,000 lbs
15,000 lbs
10,000 lbs
8,500 lbs
Rate this question:
8,500 lbs
13,600 lbs
12,000 lbs
15,000 lbs
Rate this question:
Calculate the difference
Use a shorter boom length
Use a longer boom length
Move the crane
Rate this question:
Positioned a signalman to ensure safe distances
Use synthetic slings
Barricade the area below the power lines
Do not work when humidity is high
Rate this question:
Can sign lift plans as both operator and rigger
Perform both functions during a lift
Only perform one function
Can operate the crane and supervise the lift
Rate this question:
5 mph
10 mph
15 mph
20 mph
Rate this question:
Checked the tire pressures
Attached the fly jib
Extended the power pin fly
Removed the counter weight
Rate this question:
30,000 lbs
31,450lbs
35,000 lbs
36,000 lbs
Rate this question:
10 %
15 %
25 %
45 %
Rate this question:
A swing away jib
A main hook
A limit switch
A headache bal
Rate this question:
Because the boom angle is increased
Because the boom angle is decreased
Because the radius is decreased
Because the radius is increased
Rate this question: