Organización Y Administración De Proyectos

Reviewed by Editorial Team
The ProProfs editorial team is comprised of experienced subject matter experts. They've collectively created over 10,000 quizzes and lessons, serving over 100 million users. Our team includes in-house content moderators and subject matter experts, as well as a global network of rigorously trained contributors. All adhere to our comprehensive editorial guidelines, ensuring the delivery of high-quality content.
Learn about Our Editorial Process
| By Elericmarin
E
Elericmarin
Community Contributor
Quizzes Created: 1 | Total Attempts: 545
| Attempts: 545 | preguntas: 200 | Updated: Mar 20, 2023
Please wait...

.

Question 1 / 201
🏆 Rank #--
0 %
0/100
Score 0/100

1. Cuando se busca que el software ahorre uso de la memoria y el procesador, se está buscando: 

Explanation

La respuesta correcta es "Eficiencia, porque involucra los tiempos de respuesta". Cuando se busca que el software ahorre uso de la memoria y el procesador, se está buscando optimizar el rendimiento del software para que pueda ejecutarse de manera más rápida y eficiente. Al minimizar el uso de recursos como la memoria y el procesador, se logra un mejor tiempo de respuesta y una mayor eficiencia en la ejecución del software.

Submit
Please wait...
About This Quiz
Organización Y Administración De Proyectos - Quiz

.

2.

What first name or nickname would you like us to use?

You may optionally provide this to label your report, leaderboard, or certificate.

2. Se está desarrollando una aplicación web, para publicidad de una empresa

Explanation

In this scenario, the correct answer is to document the web application like any other software project. This is because even though the problem may be simple, it is still important to document the application properly. Documenting the project will help in understanding the code, making it easier for future maintenance and updates. Additionally, it will also aid in collaboration among team members and provide a reference for any potential issues or improvements in the future.

Submit

3. Si buscas que tu sistema sea mantenible, te enfocas en:

Explanation

If you want your system to be maintainable, you should focus on both the code and the documentation. This means that in order to ensure the system can be easily maintained and understood by others, it is important to have well-written and organized code that is easy to read and modify. Additionally, having thorough documentation that explains the system's architecture, functionality, and any potential issues or considerations can greatly assist in the maintenance process. Therefore, both the code and the documentation are crucial for achieving maintainability.

Submit

4. Vigila las desviaciones del plan, emprende acciones correctivas, recibe y evalúa cambios en los proyectos solicitados.

Explanation

The given statement suggests that the task involves monitoring and addressing any deviations from the plan, implementing corrective actions, and evaluating changes in requested projects. This aligns with the concept of "Control," which refers to the process of ensuring that the project is progressing according to the plan and taking necessary actions to keep it on track.

Submit

5. Determinación de gastos e ingresos durante la vida del proyecto

Explanation

The given answer "Costos" is correct because the phrase "Determinación de gastos e ingresos durante la vida del proyecto" translates to "Determination of costs and income during the life of the project." This indicates that the focus is on the costs involved in the project, rather than the time or resources.

Submit

6. En la valoración de riesgos, aquellos riesgos que necesitan ser monitorizados o rquieren la implementación de planes de actuación detectivos, son aquellos que tienen:

Explanation

In risk assessment, risks that need to be monitored or require the implementation of detective action plans are those with a lower probability of occurrence or impact. These risks may not occur frequently, but they have the potential to cause significant harm or damage if they do occur. Therefore, it is important to closely monitor these risks and have plans in place to detect and mitigate them effectively.

Submit

7. La planificación orientada a objetivos es un enfoque metodológico del tipo

Explanation

La planificación orientada a objetivos es un enfoque metodológico que se basa en establecer los objetivos principales de una organización o proyecto y luego desglosarlos en objetivos más específicos y detallados. Este enfoque se conoce como "top down" porque parte de la dirección o liderazgo superior hacia los niveles inferiores de la organización. En este caso, la respuesta correcta es "Top down" porque implica comenzar desde arriba y descender hacia los niveles inferiores para establecer los objetivos.

Submit

8. Es una causa frecuente de fracaso en los proyectos. 

Explanation

The correct answer is "Literales a y b". This means that both options a and b are correct explanations for the given statement. Option a states that unrealistic execution deadlines can be a frequent cause of failure in projects. Option b suggests that lack of dedication from the project manager can also contribute to project failure. Both of these factors can lead to unsuccessful project outcomes.

Submit

9. Un factor crítico de éxito de un proyecto es:

Explanation

La tecnología estable es un factor crítico de éxito en un proyecto porque garantiza que los sistemas y herramientas utilizados en el proyecto funcionen de manera confiable y sin problemas. Una tecnología estable permite que el equipo de proyecto se enfoque en las tareas y metas principales, sin tener que lidiar con interrupciones o fallas tecnológicas. Además, una tecnología estable también puede aumentar la eficiencia y la productividad del equipo, ya que no se pierde tiempo en solucionar problemas técnicos. En resumen, contar con una tecnología estable es esencial para garantizar el éxito de un proyecto.

Submit

10. Las siguientes son características de un proyecto planificado

Explanation

The correct answer is "Definido, orientado a resultados y controlado." This answer is chosen because it describes the characteristics of a planned project. A planned project is one that has clear definitions and goals, is focused on achieving specific results, and is under control and monitoring throughout its execution. This answer aligns with these characteristics and distinguishes it from the other options, which either describe uncontrolled or disorganized projects or projects that are uncertain and structured.

Submit

11. Fase del proyecto en la cuál se realiza la definición y redefinición de los objetivos del proyecto y se selecciona el mejor curso e acción para alcanzar esos objetivos

Explanation

La fase del proyecto en la que se realiza la definición y redefinición de los objetivos del proyecto y se selecciona el mejor curso de acción para alcanzar esos objetivos es la planificación. Durante esta etapa, se establecen los objetivos específicos del proyecto, se identifican los recursos necesarios, se elabora un cronograma y se determinan las estrategias y tácticas para lograr los objetivos establecidos. La planificación es fundamental para asegurar que el proyecto se lleve a cabo de manera eficiente y efectiva.

Submit

12. Las operaciones difieren del proyecto en que son:

Explanation

The correct answer is "En curso y repetitivo". This answer is correct because operations are ongoing and repetitive in nature. They involve the regular execution of tasks or processes that are necessary for the day-to-day functioning of an organization. On the other hand, projects are unique and temporary endeavors with specific goals and timelines.

Submit

13. Los hitos para considerarse efectivos deben reflejar el qué y no el cómo y deben:

Explanation

The answer "Ser puntos de decisión" means that milestones should be points of decision. This means that milestones should represent significant moments or events where important decisions need to be made. It implies that milestones should not focus on the specific steps or actions taken to achieve a goal, but rather on the key decision points along the way. This ensures that milestones are meaningful and help track progress towards the desired outcome.

Submit

14. En los productos de software genéricos. ¿Quiénes controlan las especificaciones?

Explanation

En los productos de software genéricos, las especificaciones son controladas por la organización que compra el software. Esto significa que la organización que adquiere el software tiene el control sobre las características y requisitos del producto, y puede personalizarlo según sus necesidades y preferencias. Por lo tanto, es responsabilidad de la organización compradora asegurarse de que las especificaciones del software se ajusten a sus requerimientos y expectativas.

Submit

15. Uno de los dilemas éticos en cuanto a la sociedad de la Información, se refiere a la privacidad y seguridad de los datos. Uno de los nuevos elementos por medio de los cuales la intimidad de las personas estará en peligro será motivado por el aumento de las técnicas de búsquedas o escarbo en la red o en las base de datos, que va mucho más allá de las tradicionales búsquedas de información. Sin embargo, hoy en día se ha introducido un nuevo término informático, el llamado "Hacking ético". ¿Cómo puede considerarse esta práctica?

Explanation

The explanation for the given correct answer is that the statement is stating that any hacking practice cannot be considered ethical from any perspective. It implies that hacking, by its nature, involves unauthorized access and manipulation of systems or data, which is generally considered unethical. While the term "ethical hacking" has been introduced to describe proactive practices that help protect systems and design defenses against threats, the statement argues that even these practices cannot be fully ethical due to the inherent nature of hacking.

Submit

16. Un establecimiento educativo desea contratar una empresa desarrolladora de software para que se diseñe una aplicación que permita el registro de los estudiantes a su centro de cómputo. Como antecedentes se tiene que es una aplicación pequeña, y que el tiempo de plazo para su desarrollo puede ser largo. Además, se debe aclarar que el presupuesto con el que cuenta la institución es modesto. Se recomendaría trabajar con:

Explanation

La metodología en espiral o cascada sería recomendable en este caso debido a que se trata de una aplicación pequeña y el tiempo de plazo para su desarrollo puede ser largo. Estas metodologías son más adecuadas para proyectos con requisitos bien definidos y estables, lo que permite una planificación y ejecución secuencial del desarrollo del software. Además, teniendo en cuenta que el presupuesto de la institución es modesto, estas metodologías tradicionales suelen ser más económicas en comparación con metodologías ágiles como SCRUM o XP, que requieren de una mayor inversión en recursos y personal.

Submit

17. Una empresa requiere se cree un software para una necesidad específica de la misma. Sin embargo, el gerente de la misma, continuamente se moviliza y no está en su presupuesto delegar una persona para que se encargue de evaluar los avances que va teniendo el software. ¿Sería recomendable aplicar la metodología SCRUM en este caso?

Explanation

In this case, it would be recommended to apply the SCRUM methodology. SCRUM is an agile project management framework that allows for flexibility and adaptability in software development. Since the manager is constantly on the move and cannot dedicate someone to evaluate the software progress, SCRUM can help in managing the project effectively. SCRUM divides the work into small iterations called sprints, where progress is evaluated at the end of each sprint. This allows for regular updates and feedback, ensuring that the software development stays on track even without constant supervision.

Submit

18. ¿Cuáles de las siguientes actividades recomienda el enfoque del RUP?

Explanation

The RUP (Rational Unified Process) recommends activities such as specification, design, implementation, validation, and evolution of software. This means that the RUP approach emphasizes the importance of clearly defining the requirements, designing the system and software, implementing the solution, validating that it meets the requirements, and continuously evolving the software to adapt to changing needs. This approach ensures a systematic and iterative development process that focuses on delivering high-quality software.

Submit

19. Durante el desarrollo de una aplicación, en la etapa de diseño de prototipos se determinó que existieron errores y omisiones dentro de la etapa de definición de necesidades y requerimientos. Dichos errores deberían:

Explanation

Durante el desarrollo de una aplicación, es común encontrar errores y omisiones en la etapa de definición de necesidades y requerimientos. Estos errores deben ser tomados en cuenta y utilizados para corregir el documento de requerimientos y definirlos de manera correcta. Ignorar estos errores y simplemente atenderlos en el resto del proceso de desarrollo podría llevar a problemas más adelante, ya que los requerimientos mal definidos pueden afectar la calidad y funcionalidad del software. Por lo tanto, es importante corregir y definir correctamente los requerimientos para asegurar el éxito del proyecto.

Submit

20. En el diseño de un sistema telefónico celular, ¿Cuál de los siguientes corresponde a un requerimiento funcional?

Explanation

The correct answer is "La definición del número de caracteres de un mensaje." This option corresponds to a functional requirement because it specifies a specific functionality that the system should have, which is the ability to define the number of characters allowed in a message. This requirement is necessary for the system to properly handle and process messages, ensuring that they do not exceed the specified character limit. Sending emoticons in a SMS and receiving calls are also functionalities, but they are not explicitly mentioned as requirements in the given options.

Submit

21. En un sistema de reservación de vuelos, ¿Cuál de los siguientes requerimientos es funcional?

Explanation

The requirement that the user should be able to search by flight date, flight type, seat availability, and flight cost is a functional requirement because it specifies a specific functionality that the flight reservation system should have. This requirement defines the capability that the system should provide to the user in order to search for flights based on different criteria.

Submit

22. Which one do you like?

Explanation

The given question asks for the preferred choice among the options provided. The correct answer is Option 1, indicating that the person likes the first option the most.

Submit

23. Para el juego de ajedrez ¿Cuál de los siguientes ejemplos es un caso de uso?

Explanation

In the context of a chess game, "Movimiento de una ficha" (Movement of a piece) is a valid example of a use case. It represents a specific action that a user can perform within the game, which is to move a chess piece on the board. This use case involves the interaction between the user and the game system, where the user selects a piece and specifies a valid move for that piece. It is a common and essential action in the game of chess.

Submit

24. Para un juego de motocicletas, ¿Cuáles de los siguientes literales pueden ser considerados como clases?

Explanation

The literal "El Jugador solicita reiniciar el nivel" cannot be considered as a class because it describes an action or behavior rather than a specific object or entity. In object-oriented programming, classes are used to define objects or entities with properties and behaviors. "Motocicleta", "Jugador", "Carrera", and "Pistas" can be considered as classes because they represent specific objects or entities in the context of a motorcycle game.

Submit

25. Which one do you like?

Explanation

not-available-via-ai

Submit

26. Which one do you like?

Explanation

not-available-via-ai

Submit

27. En el siguiente requerimiento: "A cada pedido se le deberá asignar un identificador único (ID_PEDIDO)" Corresponde a un requerimiento:

Explanation

The statement "A cada pedido se le deberá asignar un identificador único (ID_PEDIDO)" indicates a specific functionality that needs to be implemented, which is assigning a unique identifier to each order. This requirement defines a specific action that the system should perform, making it a functional requirement.

Submit

28. Si se desarrollara un software profesional basado en la Web, una de las ventajas sería:

Explanation

One of the advantages of developing professional web-based software is the reusability of various software components such as code and interfaces. However, a potential disadvantage is that the system can be vulnerable to attacks from third parties. This means that unauthorized individuals or hackers may attempt to exploit vulnerabilities in the software to gain unauthorized access, steal sensitive information, or disrupt the system's functionality. It is important to implement robust security measures to protect against these potential attacks.

Submit

29. El objetivo del plan de gestión de alcance es

Explanation

The objective of the scope management plan is to explain the process by which scope changes will be proposed, reviewed, and documented. This plan outlines the specific procedures and guidelines that will be followed to ensure that any changes to the project scope are properly evaluated, reviewed by the appropriate stakeholders, and documented for future reference. By having a clear process in place, the project team can effectively manage scope changes and ensure that they align with the project objectives and requirements.

Submit

30. ¿Por qué los entregables deben ser desglosados en paquetes de trabajo durante el desarrollo de la estructura de desglose del trabajo?

Explanation

Los entregables deben ser desglosados en paquetes de trabajo durante el desarrollo de la estructura de desglose del trabajo para hacer las actividades más fáciles de gestionar, ya que al dividir los entregables en paquetes de trabajo más pequeños, se pueden asignar recursos y establecer plazos más precisos. Además, esto también facilita el seguimiento de las actividades, ya que se pueden monitorear y controlar de manera más efectiva. Por último, desglosar los entregables en paquetes de trabajo también permite asignar actividades específicas a unidades de organización individuales, lo que mejora la eficiencia y la responsabilidad en el proceso de desarrollo del proyecto.

Submit

31. En la reducción de la duración del proyecto, la primera acción a tomar es:

Explanation

The correct answer is option d) Ninguna de las anteriores. This means that none of the options mentioned (changing the scope of the project, eliminating activities, or fast execution of activities on the critical path) is the first action to take in reducing the duration of the project. Therefore, there must be another action or approach that should be considered before these options.

Submit

32. Las lecciones aprendidas durante el proyecto:

Explanation

The correct answer is c) Deben ser documentadas a lo largo del proyecto. Las lecciones aprendidas durante el proyecto deben ser documentadas a lo largo del proyecto, no solo en el informe de cierre. Esto es importante para capturar y registrar cualquier conocimiento o experiencia adquirida durante el desarrollo del proyecto. Al documentar las lecciones aprendidas a lo largo del proyecto, se pueden identificar y abordar problemas o desafíos a medida que surgen, lo que puede ayudar a mejorar la eficiencia y el éxito general del proyecto.

Submit

33. La línea base de costos debería incluir:

Explanation

The correct answer is d) Todas las anteriores son correctas.

The baseline of costs should include an estimate of the most probable project cost, the cost of contingency, and assumptions of the estimates. Including all of these factors in the baseline of costs ensures that the project budget is comprehensive and accounts for potential risks and uncertainties. By considering the most probable cost, the project team can have a realistic estimate to work with. Including the cost of contingency allows for unexpected expenses that may arise during the project. Finally, including assumptions of the estimates helps to provide transparency and clarity regarding the basis of the cost estimates.

Submit

34. El plan del proyecto es usado para gerenciar:

Explanation

The project plan is used to manage the processes of execution and control during the project. This includes activities such as monitoring progress, tracking milestones, managing resources, and making adjustments as needed. The plan serves as a roadmap for the project team, providing guidance on how to execute the project and ensuring that it stays on track. By following the plan, the project manager can effectively manage the project and ensure that it meets its objectives.

Submit

35. Una descripción del trabajo autorizado a ser realizado por el proveedor se encuentra en el:

Explanation

The correct answer is b) Enunciado del trabajo (SOW). The SOW, or Statement of Work, provides a detailed description of the work that is authorized to be performed by the provider. It outlines the objectives, scope, deliverables, and timeline of the project, providing clear guidance on what needs to be accomplished. The SOW is an essential document in project management as it helps to ensure that both the client and the provider have a shared understanding of the work to be done.

Submit

36.  La profesión de "Arquitecto de Software": ¿Debería ser independiente del personal de una empresa desarrolladora de Software?

Explanation

The correct answer is No, because the role of a software architect goes beyond just designing the system. They actively collaborate in the entire development process.

Submit

37. Existen cuatro actividades del proceso de Ingeniería de Requerimientos, cuyo objetivo principal sería:

Explanation

The correct answer is "Identificar las necesidades del cliente para luego transformarlas en requerimientos." This is because one of the main objectives of the Requirements Engineering process is to understand and identify the needs of the client or stakeholders. Once these needs are identified, they can be transformed into specific requirements that can guide the development of the system or solution.

Submit

38. Respecto a los atributos de calidad del software

Explanation

The correct answer explains that external quality attributes, which are visible to users, only become evident through the behavior of the product when it is actually built. This means that users can only assess the quality of a software product once it is fully developed and functioning. Internal quality attributes, such as response time in the target production environment, can be evaluated by developers throughout the development process before the final product is built. The answer highlights the distinction between internal and external quality attributes and when they become visible.

Submit

39. Which one do you like?

Explanation

not-available-via-ai

Submit

40. Which one do you like?

Explanation

not-available-via-ai

Submit

41. Select the ones you like

Explanation

not-available-via-ai

Submit

42. Las limitaciones de las LOCs son que: 

Explanation

The correct answer is "no son de utilidad para comparar tamaños de productos implementados en lenguajes distintos". This is because LOCs (Lines of Code) are a metric used to measure the size of a software product by counting the number of lines of code. However, this metric is not useful for comparing the sizes of products implemented in different programming languages, as the same functionality can be achieved with different amounts of code in different languages. Therefore, LOCs cannot be used as a reliable measure for comparing sizes of products implemented in different languages.

Submit

43. Un riesgo es:   

Explanation

A risk is an uncertain event or condition that, if it occurs, can have a positive or negative impact on the project.

Submit

44. La relación entre calidad de proceso y calidad del producto:

Explanation

The relationship between process quality and product quality is difficult to predict in software. Unlike manufactured products, software development involves complex and dynamic processes that are not easily standardized and controlled. The outcome of the software development process can be influenced by various factors such as the skills and experience of the development team, the requirements and specifications, and the tools and technologies used. Therefore, it is challenging to accurately determine how the quality of the process will translate into the quality of the final software product.

Submit

45. La entrevista individual, como técnica de relevamiento de requisitos, se usa para: 

Explanation

La entrevista individual como técnica de relevamiento de requisitos se utiliza para mejorar las relaciones con el cliente, entender el problema del negocio y entender el ambiente operativo. Esto significa que se utiliza para lograr una comprensión completa de las necesidades y circunstancias del cliente, lo que a su vez ayuda a establecer una base sólida para el desarrollo de soluciones efectivas.

Submit

46. Los casos de uso:  

Explanation

Los casos de uso no son adecuados para sistemas con pocas interfaces porque los casos de uso son una técnica de análisis que se utiliza para describir cómo los usuarios interactúan con un sistema a través de sus interfaces. Si un sistema tiene pocas interfaces, es probable que no haya muchas interacciones de los usuarios con el sistema, por lo que los casos de uso no serían necesarios o relevantes en este contexto.

Submit

47. ¿Cuál de los siguientes es una división del software de aplicación? 

Explanation

La división de software de aplicaciones "De productividad" se refiere a programas diseñados para ayudar a los usuarios a realizar tareas específicas en su trabajo o vida diaria, como procesadores de texto, hojas de cálculo, programas de presentación, herramientas de gestión de proyectos, etc. Esta categoría de software se centra en mejorar la eficiencia y la productividad de los usuarios al proporcionarles herramientas y funciones específicas para realizar tareas relacionadas con su trabajo o actividades personales.

Submit

48. ¿Cuál de los siguientes es el Sistema Operativo que no maneja Interfaz Gráfica? 

Explanation

Unix is the operating system that does not have a graphical user interface (GUI). It is a command-line based operating system that primarily focuses on providing a stable and efficient environment for running servers and other networked systems. Unlike Windows 2000, Mac OS, and Windows XP, Unix does not have a built-in graphical interface for interacting with the system. Instead, it relies on command-line commands and text-based interfaces for performing tasks and managing the system.

Submit

49. ¿Cuál de las siguientes es una función del Sistema Operativo? 

Explanation

Todas las opciones mencionadas son funciones del sistema operativo. El sistema operativo se encarga de administrar los recursos de la computadora, como la memoria y el procesador, para garantizar un uso eficiente de los mismos. También organiza la información que se almacena en la computadora, gestionando los archivos y directorios. Además, actúa como una interfaz entre la computadora y el usuario, permitiendo la interacción y el manejo de las aplicaciones y programas. Por lo tanto, todas las respuestas son correctas.

Submit

50. Al borrar un archivo se puede recuperar este solo si no se ha grabado algo encima de él. 

Explanation

Cuando se borra un archivo, este puede ser recuperado siempre y cuando no se haya grabado algo encima de él. Esto se debe a que al borrar un archivo, el sistema operativo simplemente marca el espacio ocupado por el archivo como disponible para su reutilización, pero los datos del archivo en sí todavía pueden estar presentes en el disco hasta que sean sobrescritos por otros datos. Por lo tanto, si no se ha grabado nada encima del archivo borrado, es posible recuperarlo utilizando software de recuperación de datos.

Submit

51. Sirve para reorganizar la información en disco y que se puede acceder más rápidamente a la información. 

Explanation

A desfragmentador es una herramienta que se utiliza para reorganizar la información en el disco duro de una computadora. A medida que se utilizan y eliminan archivos, el disco duro puede volverse fragmentado, lo que significa que los datos se almacenan en diferentes ubicaciones físicas en el disco. Esto puede ralentizar el acceso a la información y hacer que el sistema operativo tarde más en encontrar y abrir archivos. El desfragmentador reorganiza estos fragmentos de datos dispersos en el disco, colocándolos en ubicaciones contiguas, lo que permite un acceso más rápido a la información y una mejora en el rendimiento del sistema.

Submit

52. ¿Cuál de las siguientes es una manera de evitar virus en nuestras computadoras? 

Explanation

not-available-via-ai

Submit

53. Una red de telecomunicaciones internacional que consiste en documentos con hipervínculos recibe el nombre de: 

Explanation

The correct answer is World Wide Web. The World Wide Web is a network of interconnected documents that are accessed through hyperlinks. It is a global system of information sharing and communication that revolutionized the way we access and interact with information on the internet. NSFNET, Netscape Navigator, and Internet Explorer are all related to the internet, but they do not specifically refer to a network of interconnected documents with hyperlinks like the World Wide Web does.

Submit

54. Para colocar texto en el pisapapeles siempre es necesario primero: 

Explanation

To put text on the clipboard, it is always necessary to first select the text. This is because selecting the text highlights it and allows it to be copied or cut. Once the text is selected, it can then be copied or cut using the appropriate buttons or keyboard shortcuts. Only after the text is copied or cut can it be pasted onto the clipboard. Therefore, the correct answer is "Seleccionar el texto" (Select the text).

Submit

55. ¿Cuándo solo deseamos copiar el formato de algún texto debo hacer? 

Explanation

not-available-via-ai

Submit

56. ¿Cómo cambias el tamaño de un objeto en un paquete de presentaciones? 

Explanation

To change the size of an object in a presentation package, you can do so by clicking on the resize button.

Submit

57. ¿Qué usarías para colocar objetos en un sitio específico de una diapositiva? 

Explanation

La cuadrícula se utiliza para colocar objetos en un sitio específico de una diapositiva.

Submit

58. La fórmula = IF( A1 < B1 , MIN (A1:A5), MIN(B1:B5)) corresponde a 

Explanation

The correct answer is "Dejar el valor menor de los elementos B1 a B5, si lo que está en A1 es mayor a lo que está en B1." This is because the formula is using the IF function to check if the value in cell A1 is greater than the value in cell B1. If it is, then it will return the minimum value from cells B1 to B5.

Submit

59. Cada una de las afirmaciones siguientes es verdadera para un filtro excepto 

Explanation

The given statement "La hoja de datos resultante incluye todos los campos en la base de datos" is incorrect because a filter is used to select specific records that meet certain criteria, so the resulting datasheet will only include the records that satisfy those criteria, not all the fields in the database.

Submit

60. En una base de datos, que almacena información de los socios de un video club. ¿Cuál es el identificador con que se hace referencia a todos los datos de un socio en específico? 

Explanation

The correct answer is "Query" because a query is a request for data or information from a database. It is used to retrieve specific data from a database and can be used to access all the data related to a specific member in this case. A query is a powerful tool in a database that allows users to search, filter, and retrieve the desired information.

Submit

61. ¿Cómo debe ser la estructura de un mapa conceptual? 

Explanation

La estructura de un mapa conceptual debe ser desordenada. Un mapa conceptual es una representación gráfica que organiza y relaciona conceptos e ideas de manera no lineal. No sigue una estructura rígida y jerárquica, sino que permite la libre asociación de ideas y la conexión entre diferentes conceptos. Esto facilita la comprensión y el análisis de la información, ya que no limita la creatividad y permite explorar diferentes perspectivas y relaciones entre los conceptos.

Submit

62. ¿Qué es una lista de cotejo? 

Explanation

Una lista de cotejo es un instrumento utilizado para evaluar de manera detallada el cumplimiento de ciertos criterios o elementos específicos. Esta lista proporciona un conjunto de ítems o aspectos a evaluar, y se utiliza para marcar o verificar si cada uno de ellos se cumple o no. Es una herramienta muy útil en la evaluación de habilidades, conocimientos o competencias, ya que permite llevar un registro detallado de los aspectos que se están evaluando y facilita la comparación entre diferentes evaluados.

Submit

63. ¿Cuál de estos es un tipo de Tabla de verdad? 

Explanation

A tabla de verdad es una representación de todas las posibles combinaciones de valores de entrada y sus correspondientes resultados de salida en una función lógica. El formato digital es un tipo de tabla de verdad que se utiliza para representar las operaciones lógicas en sistemas electrónicos, donde los valores de entrada y salida se representan en forma de bits (0 y 1).

Submit

64. En un proyecto de software que busca el desarrollo de un sistema financiero, ¿Cuál piensas que deberían ser los puntos tomados en cuenta para tener un buen resultado?

Explanation

Para obtener un buen resultado en el desarrollo de un sistema financiero, es importante tener en cuenta la programación para garantizar que el software funcione correctamente y cumpla con los requisitos establecidos. La documentación es esencial para proporcionar instrucciones claras sobre cómo utilizar el sistema y para facilitar su mantenimiento y actualización en el futuro. La configuración también es crucial para garantizar que el sistema esté correctamente adaptado a las necesidades específicas del cliente y que funcione de manera eficiente. Por lo tanto, es necesario considerar la programación, la documentación y la configuración para lograr un buen resultado en el proyecto de software.

Submit

65. Se recaba, analiza y procesa toda la información que tendrá incidencia en el proyecto.

Explanation

The given statement suggests that at the beginning of a project, all the information that will have an impact on the project is collected, analyzed, and processed. This is the initial phase where the project team gathers all the necessary data and information to understand the project requirements, objectives, and constraints. It is a crucial step to ensure that the project starts on the right track and all relevant information is considered before proceeding with the execution phase.

Submit

66. Los gestores, generalmente, seleccionan a las personas que trabajarán en su proyecto, o establecen un equipo ideal mínimo para el proyecto.

Explanation

The correct answer is "Selección y evaluación del personal." The passage states that managers typically select the people who will work on their project or establish a minimum ideal team for the project. This aligns with the concept of "Selección y evaluación del personal," which refers to the process of selecting and evaluating the personnel for a project.

Submit

67. Planificar las actividades de un proyecto y construir su plan agregando actividades hasta llegar a entregable se conoce como: 

Explanation

Planificación top down se refiere a un enfoque en el que se establece primero el objetivo general del proyecto y luego se desglosa en actividades más específicas. En este caso, se menciona que se planifican las actividades del proyecto y se construye el plan agregando actividades hasta llegar al entregable final, lo que indica que se sigue un enfoque de planificación top down. Este enfoque permite una visión general del proyecto desde el principio y facilita la identificación de las actividades necesarias para alcanzar el objetivo final.

Submit

68. De la etapas de la fase de planificación de un proyecto, ¿Cuál es estratégica?

Explanation

The strategic phase of project planning involves reviewing project objectives, milestones, and responsible parties. This step is crucial in determining the overall direction and goals of the project. By reviewing objectives, milestones, and responsible parties, the project team can ensure that they are aligned with the organization's strategic goals and that the project is on track to achieve its intended outcomes. This phase helps in setting a clear vision and roadmap for the project, guiding the subsequent activities and tasks.

Submit

69. Muchas organizaciones han fortalecido sus equipos de gestión de riesgos, buscando que éstos sean identificados a priori, sin embargo, lo que generalmente ocurre es que: 

Explanation

The most common situation is that organizations tend to identify risks related to execution rather than other types of risks. This means that they focus on identifying potential issues or challenges that may arise during the implementation or execution of a project or plan. They may overlook or not give enough attention to other types of risks such as strategic, financial, or operational risks. This can lead to a lack of preparedness and an inability to address these other risks in a timely manner.

Submit

70. El plan del proyecto

Explanation

not-available-via-ai

Submit

71. Los requerimientos de un sistema pueden ser:

Explanation

The correct answer is "Todas las anteriores" because the question states that the requirements of a system can be functional or non-functional. Since "Todas las anteriores" means "All of the above" in Spanish, it implies that both functional and non-functional requirements are included in the options given. Therefore, the correct answer is that the requirements of a system can be both functional and non-functional.

Submit

72. Cumple con la tarea de integrar los esfuerzos dirigidos hacia la ejecución exitosa de un proyecto específico.

Explanation

The correct answer is "Administrador de proyectos" because this role is responsible for integrating efforts towards the successful execution of a specific project. They coordinate and oversee all aspects of the project, including planning, organizing, and controlling resources to achieve project objectives. The project manager ensures that all team members are aligned and working towards a common goal, making them essential in the successful completion of a project.

Submit

73. Una vez que el proyecto ha finalizado, es buena idea que el contratista se asegure de haber cumplido con las especificaciones

Explanation

After the project has been completed, it is a good idea for the contractor to validate that they have met the specifications. This means confirming that all the requirements and expectations outlined in the project specifications have been successfully fulfilled. Validating the work ensures that it aligns with the agreed-upon standards and meets the client's needs. It helps to ensure quality and customer satisfaction, as well as avoid any potential issues or disputes that may arise later on.

Submit

74. Se refiere a la identificación de actividades, hitos y entregas del proyecto

Explanation

The given answer, "Planificación y calendarización del proyecto" (Planning and scheduling of the project), is the correct answer because it aligns with the given statement which refers to the identification of activities, milestones, and deliverables of the project. Planning and scheduling involve creating a roadmap for the project, determining what needs to be done, when it needs to be done, and how it will be done. This helps in organizing and managing the project effectively, ensuring that all tasks are completed on time and within budget.

Submit

75. Surgen en el interior de un proyecto debido a problemas en su ejecución o a los recursos disponibles

Explanation

The correct answer is "Endógenas". Endógenas refers to conflicts that arise within a project due to issues in its execution or the available resources. These conflicts are internal to the project and are not influenced by external factors.

Submit

76. La _______ administra los procesos internos del mismo, donde realmente se efectúa el trabajo

Explanation

The given statement suggests that the "Función del proyecto" is the correct answer. This is because the sentence mentions that this function administers the internal processes of the project, where the actual work is carried out. This implies that the "Función del proyecto" is responsible for managing and overseeing the execution of the project's tasks and activities.

Submit

77. Durante el proceso de contratación, una vez realizada la evaluación técnica y propuesto un adjudicatario, es importante:

Explanation

During the hiring process, once the technical evaluation has been conducted and a contractor has been proposed, it is important to negotiate the economic and contractual terms before proceeding with the contract. This step ensures that both parties are in agreement regarding the financial aspects and other contractual obligations before officially signing the contract. The negotiation allows for any necessary adjustments or clarifications to be made, ensuring a smoother execution of the contract.

Submit

78. Durante el proceso de evaluación de riesgos de los proyectos de una compañía, se identifica que los especialistas en lenguaje de programación JAVA son muy escasos y, por tanto es probable que no se tenga el equipo necesario. Por tanto, se decide capacitar un equipo de personas adicionales en el lenguaje de programación citado. Esta acción dentro la gestión de riesgos se conoce como:

Explanation

La acción de capacitar un equipo de personas adicionales en el lenguaje de programación JAVA se conoce como "aceptar el riesgo" dentro de la gestión de riesgos de los proyectos de una compañía. Al identificar que los especialistas en este lenguaje son escasos y que no se tiene el equipo necesario, la compañía toma la decisión de aceptar el riesgo y capacitar a un equipo adicional para mitigar esta falta de recursos.

Submit

79. Una de las características de las empresas orientadas por proyectos, es que son:

Explanation

An explanation for the correct answer "Process oriented" is that in project-oriented companies, the primary focus is on the processes involved in completing projects. These companies prioritize efficient and effective project management, with a strong emphasis on planning, organizing, and controlling project activities. They tend to have well-defined processes and procedures in place to ensure projects are executed smoothly and successfully. This focus on processes helps to streamline project execution, improve productivity, and achieve desired outcomes.

Submit

80. La preparación de la propuesta o memoria puede ser realizada por:

Explanation

La preparación de la propuesta o memoria puede ser realizada tanto por el equipo interno de tecnología como por un proveedor, dependiendo de la estrategia de la organización. Esto significa que la organización puede optar por utilizar sus propios recursos internos de tecnología para preparar la propuesta o memoria, o puede contratar a un proveedor externo especializado en este tipo de tareas. La elección entre ambas opciones dependerá de la estrategia específica de la organización y de los recursos y capacidades disponibles.

Submit

81. Método cuantitativo para la selección de un proyecto:

Explanation

The correct answer is "Periodo de Retorno de Inversión" (Return on Investment Period). This refers to a quantitative method used to select a project based on the time it takes to recover the initial investment. It calculates the time it will take for the project's cash inflows to equal the initial investment, indicating the profitability and risk of the project. By comparing the return periods of different projects, decision-makers can determine which project offers the best return on investment.

Submit

82. Como camino o ruta crítica se conoce a la:

Explanation

The correct answer is "Cadena de actividades que determinan la duración global mínima de un proyecto." This is because the critical path is the sequence of activities that must be completed in order to finish the project in the shortest possible time. Any delay in any activity on the critical path will cause a delay in the project's overall duration. Therefore, the critical path determines the minimum duration of the project.

Submit

83. ¿Cuál NO es un proyecto?

Explanation

El mantenimiento semanal de la red LAN no se considera un proyecto, ya que se trata de una tarea recurrente y continua que forma parte de las labores de mantenimiento y gestión de una red de área local. En cambio, la integración de sistemas y la construcción de una base de datos son proyectos específicos y definidos que implican la planificación, ejecución y finalización de un conjunto de tareas para lograr un objetivo determinado.

Submit

84. La fase de proyecto más adecuada para la identificación y cuantificación de los riesgos es: 

Explanation

The correct answer is "Definición". In the definition phase of a project, the focus is on understanding the project requirements, objectives, and scope. During this phase, risks can be identified and quantified by analyzing potential issues and uncertainties that may arise throughout the project. This allows the project team to develop strategies and plans to mitigate these risks effectively. The execution phase is more focused on implementing the project plan, while the planning phase is concerned with creating a detailed roadmap for the project.

Submit

85. Como tarea predecesora se conoce a:

Explanation

A predecessor task is a task that needs to be completed before a new task can start. It is a dependency that determines the sequence of tasks in a project. In other words, the completion of the predecessor task is a prerequisite for starting the successor task. This helps in ensuring that tasks are carried out in a logical order and that the project progresses smoothly.

Submit

86. ¿Hasta qué momento, durante la ejecución de un proyecto, la contingencia debe ser considerada?

Explanation

During the execution of a project, contingency should be considered until the time and progress of the project demonstrate that the risk has been reduced.

Submit

87. Consiste en dividir los paquetes de trabajo en unidades más pequeñas, las cuales representan el esfuerzo que deberá realizarse para cumplir el trabajo asignado:

Explanation

La descomposición consiste en dividir los paquetes de trabajo en unidades más pequeñas, lo cual permite una mejor comprensión y gestión del trabajo asignado. Al descomponer los paquetes de trabajo, se puede identificar de manera más clara las tareas y los esfuerzos necesarios para completar cada una de ellas. Esto facilita la asignación de recursos, la planificación y el seguimiento del progreso del proyecto.

Submit

88. La planificación de proyectos es considerado

Explanation

The correct answer is "Un ciclo en constante revisión". This means that project planning is a process that is constantly being reviewed and adjusted throughout the project. It suggests that project planning is not a static process that is set in stone, but rather a dynamic process that requires regular evaluation and adaptation to ensure its effectiveness.

Submit

89. Durante la ejecución del proyecto, el costo y dotación de recursos es, 

Explanation

Durante la ejecución del proyecto, el costo y dotación de recursos es alto. Esto significa que se requerirá una cantidad significativa de recursos financieros y humanos para llevar a cabo el proyecto. Además, es probable que se necesite invertir en tecnología, equipos y materiales costosos. También implica que el proyecto puede tener un alto nivel de complejidad y riesgo, lo que requerirá una gestión cuidadosa y una supervisión constante para garantizar su éxito.

Submit

90. El documento que formaliza el inicio de un PROYECTO se conoce como:

Explanation

The correct answer is "Project Charter". A project charter is a document that formalizes the start of a project. It outlines the project's objectives, scope, stakeholders, deliverables, and other important details. It serves as a reference for project team members and stakeholders to understand the project's purpose and goals. The project charter is typically created by the project manager or project sponsor and is an essential document in project management.

Submit

91. El propósito de un proyecto es:

Explanation

The purpose of a project is to achieve a specific goal or objective and complete it. Projects are temporary endeavors with defined start and end dates, and their ultimate aim is to deliver a desired outcome or result. The other options, maintaining trained personnel and sustaining the organization, may be important factors within a project, but they are not the primary purpose. The primary focus of a project is to accomplish a specific objective and bring it to a conclusion.

Submit

92. Método cuantitativo para la selección de un proyecto:

Explanation

The correct answer is "Periodo de Retorno de Inversión (TIR)". The TIR, or Period of Return on Investment, is a quantitative method used for project selection. It calculates the time it takes for a project to recoup its initial investment. This method is commonly used to evaluate the profitability of a project and determine if it is worth pursuing. By comparing the TIR of different projects, decision-makers can prioritize and select the projects that offer the highest return on investment in the shortest period of time.

Submit

93. La definición de hitos en el proyecto debe estar acompañada de la definición de:

Explanation

La definición de hitos en un proyecto debe estar acompañada de la definición del material necesario para lograr el hito. Esto implica identificar los recursos, herramientas y equipos necesarios para alcanzar el hito específico. Al definir el material necesario, se asegura que se cuenta con los recursos adecuados para llevar a cabo las tareas y alcanzar los objetivos establecidos. Esto ayuda a garantizar que el proyecto se lleve a cabo de manera eficiente y efectiva.

Submit

94. Cuando el gerente del proyecto es quien controla el presupuesto del mismo, se trata de una estructura:

Explanation

Cuando el gerente del proyecto es quien controla el presupuesto del mismo, se trata de una estructura proyectizada. En este tipo de estructura organizativa, los proyectos se consideran como unidades independientes y autónomas, con su propio presupuesto y recursos asignados. El gerente del proyecto tiene autoridad total sobre el presupuesto y toma decisiones relacionadas con el mismo. Esto permite una mayor flexibilidad y agilidad en la gestión de los recursos financieros del proyecto.

Submit

95. El proyecto ha completado su ejecución, y ahora es tiempo para que el producto del proyecto sea aceptado. ¿Quién acepta formalmente el producto

Explanation

The correct answer is c) El sponsor, los interesados claves y el cliente. In this context, after the project has completed its execution, it is time for the product of the project to be formally accepted. The sponsor, key stakeholders, and the client are the ones responsible for formally accepting the product. They have the authority and knowledge to evaluate whether the product meets the agreed-upon requirements and objectives of the project. The team of the project and the quality assurance team may be involved in the acceptance process, but the ultimate responsibility lies with the sponsor, key stakeholders, and the client.

Submit

96. La información de la estimación de costo puede ser extraída de:

Explanation

The correct answer is d) Todas las anteriores son correctas. This means that all of the options mentioned in the question are correct sources from which the cost estimation information can be extracted. This includes information from commercial organizations, project team members, as well as vendors and suppliers.

Submit

97. Insistir en que todos los miembros del equipo y proveedores usen procedimientos organizacionales y terminologías estándar

Explanation

Explicación: Insistir en que todos los miembros del equipo y proveedores usen procedimientos organizacionales y terminología estándar es una buena práctica de gestión porque brinda los resultados más predecibles. Al utilizar procedimientos y terminología estándar, se establece un marco común de trabajo que ayuda a evitar confusiones y malentendidos. Esto permite que todos los miembros del equipo estén alineados y trabajen de manera más eficiente y efectiva, lo que a su vez aumenta la probabilidad de obtener resultados predecibles y de alta calidad.

Submit

98. En la especificación de requisitos, las descripciones estáticas: 

Explanation

Las descripciones estáticas en la especificación de requisitos son representaciones gráficas. Esto implica que utilizan elementos visuales como diagramas, gráficos o modelos para representar la información de manera visual y comprensible. Estas representaciones gráficas ayudan a visualizar la estructura y las relaciones entre las entidades, lo que facilita la comprensión y comunicación de los requisitos. Ejemplos comunes de descripciones estáticas son los modelos de dominio y los diagramas de estados.

Submit

99.  Un EBP (Elementary Business Process / Proceso de Negocio Elemental) es:

Explanation

An EBP (Elementary Business Process) is a task performed by a person in response to a business event. This task can occur at different locations and times, adds measurable business value, and ensures data consistency.

Submit

100. Nos sirve para disminuir el tamaño que ocupa físicamente un archivo. 

Explanation

An antivirus is a software program that is designed to detect, prevent, and remove malicious software (such as viruses, worms, and Trojans) from a computer system. It helps to protect the computer and its files from being infected or damaged by malware. While it does not directly reduce the physical size of a file, it helps in keeping the files and the entire system safe and secure, thereby indirectly preventing any potential increase in file size due to malware or viruses.

Submit

101. ¿Cuál es el operador para construir una referencia absoluta? 

Explanation

The correct answer is "abs( )". This function is used to construct an absolute reference in programming. An absolute reference refers to a fixed location or value in a program, regardless of any changes or movements in other parts of the program. The "abs( )" function ensures that the reference remains constant and does not change.

Submit

102. Is [your statement here] true or false?

Explanation

The given answer implies that the statement is true.

Submit

103. ¿Cuál será el valor desplegado con el siguiente diagrama de flujo, si tenemos que a = 10, y b=2? 

Explanation

The correct answer is "segundo" because according to the given information, the values of a and b are 10 and 2 respectively. However, since the question does not provide any further context or instructions, it is not possible to determine the exact reason why "segundo" is the correct answer.

Submit

104. ¿Qué es un analogía?

Explanation

An analogía es una semejanza que indica relación entre dos cosas. En este contexto, se refiere a la comparación de dos elementos o conceptos para resaltar sus similitudes y establecer una conexión entre ellos. Esta respuesta es correcta porque describe de manera precisa y concisa el significado de una analogía.

Submit

105. Si usted fuera un gerente de proyecto de software, ¿Qué procesos tomaría en cuanta para el desarrollo de un sistema?

Explanation

The correct answer is "Especificación de Software, Desarrollo, Validación, Evolución de Software." As a software project manager, it is important to consider these processes for the development of a system. The specification of software involves defining the requirements and goals of the system. Development refers to the actual coding and implementation of the software. Validation ensures that the system meets the specified requirements and is functioning correctly. Lastly, the evolution of software involves maintaining and updating the system over time to adapt to changing needs and technologies.

Submit

106. Dirigir, reunirse con el equipo, resolver problemas y asegurar recursos

Explanation

The given answer "Ejecución" is correct because it refers to the act of carrying out or implementing a plan or strategy. In the context of the question, the activities mentioned (dirigir, reunirse con el equipo, resolver problemas y asegurar recursos) are all part of the execution phase of a project or task. This phase involves actively managing and supervising the team, addressing any issues that arise, and ensuring that the necessary resources are available for the successful completion of the project.

Submit

107. Es uno de los aspectos esenciales de un proyecto ya que constituye el punto de referencia del trabajo una vez ejecutado.

Explanation

La documentación es uno de los aspectos esenciales de un proyecto porque proporciona un registro detallado y completo de todas las actividades, decisiones y resultados del proyecto. Esta documentación sirve como punto de referencia para el trabajo una vez que se ha ejecutado, lo que permite a los miembros del equipo y a otras partes interesadas comprender y evaluar el proyecto en su conjunto. Además, la documentación también facilita la comunicación y colaboración entre los miembros del equipo, ya que todos tienen acceso a la misma información y pueden hacer referencia a ella en cualquier momento.

Submit

108. Al completar el alcance total de un proyecto con calidad, a tiempo y dentro del presupuesto, proporciona una gran satisfacción

Explanation

La respuesta "Beneficios de administración" es correcta porque al completar el alcance total de un proyecto con calidad, a tiempo y dentro del presupuesto, se logran los objetivos de la gestión y se obtienen beneficios para la organización. Esto incluye la satisfacción de los clientes, el logro de los resultados esperados, el cumplimiento de los plazos y el control de los costos. Estos beneficios contribuyen a mejorar la eficiencia y eficacia de la administración de proyectos y a garantizar el éxito del proyecto en general.

Submit

109. Luego de un proceso de valoración de los riesgos, para aquellos riesgos que requieren una monitorización, deben implementarse planes de actuación:

Explanation

After evaluating the risks, it is necessary to implement detective action plans for those risks that require monitoring. Detective action plans are designed to identify and detect any potential issues or problems that may arise. These plans focus on proactive measures to identify risks before they become major problems. By implementing detective action plans, organizations can effectively monitor and address potential risks, ensuring the smooth operation of their processes and minimizing any negative impact on their operations.

Submit

110. Es la disciplina de organizar y administrar recursos de manera tal que se pueda culminar todo el trabajo requerido en el proyecto dentro del alcance, tiempo y coste definidos

Explanation

The given statement describes the discipline of organizing and managing resources in a way that allows for the completion of all the required work in a project within the defined scope, time, and cost. This discipline is commonly known as "Gestión de proyectos" in Spanish, which translates to "Project Management" in English. Project management involves planning, coordinating, and controlling various aspects of a project to ensure its successful completion.

Submit

111. Es la planeación, organización, dirección y control de los recursos para lograr un objetivo a corto plazo

Explanation

The given answer "Administración de proyectos" is the correct answer because it accurately describes the process of planning, organizing, directing, and controlling resources to achieve a short-term objective. This term is commonly used in the field of project management to refer to the overall management and coordination of a specific project.

Submit

112. Los proyectos son, en su mayoría, mixtos, que involucran cambios en la organización actitudes y habilidades de las personas, y:

Explanation

The correct answer is "Cambios en los procesos". This is because the question states that projects mostly involve changes in the organization, attitudes and skills of people, and then lists three options. Out of these options, "Cambios en los procesos" (changes in the processes) aligns with the context of the question and is the most logical choice. It is also common for projects to involve process improvements or changes to optimize efficiency and effectiveness.

Submit

113. El documento que proporciona información de un proyecto y facilita la toma de decisiones se conoce como;

Explanation

A case of business, or "caso de negocio" in Spanish, refers to a document that provides information about a project and helps in making decisions. This document outlines the reasons for undertaking the project, the expected benefits, and the estimated costs. It helps stakeholders understand the project's purpose, scope, and potential outcomes, enabling them to make informed decisions. A project charter, on the other hand, is a separate document that formally authorizes the project and defines its objectives, scope, and stakeholders. Val IT is a framework for governance of IT investments and does not directly relate to providing information for project decision-making.

Submit

114. La triple restricción consiste en:

Explanation

The triple constraint refers to the three factors that are interrelated and affect the success of a project: cost, scope, and time. These three elements are crucial in project management as they determine the project's feasibility and its ability to meet the desired objectives. Cost represents the financial resources required for the project, scope defines the goals and deliverables, and time refers to the project's duration and deadlines. By managing these three constraints effectively, project managers can ensure that the project is completed within budget, meets the desired objectives, and is delivered on time.

Submit

115. La capacidad de incluir en las características finales del producto sin afectar el costo a alta en la fase de:

Explanation

La capacidad de incluir en las características finales del producto sin afectar el costo es alta en la fase de inicio. Durante esta etapa, se establecen los objetivos y requisitos del proyecto, se identifican los recursos necesarios y se realiza una planificación preliminar. Al tener claridad desde el principio sobre las características que se desean incluir, se pueden tomar decisiones más efectivas para evitar afectar el costo del proyecto.

Submit

116. Define el alcance, recursos y tiempo requerido. Permite mantenerlos en balance a través de todo el proyecto

Explanation

The given answer, "Planeación" (Planning), is the correct answer because it aligns with the statement that is provided. The statement mentions that planning helps define the scope, resources, and time required for a project and allows for maintaining a balance throughout the project. Planning is an essential phase in project management where all the necessary details and strategies are determined to ensure successful project execution. Therefore, the answer "Planeación" accurately reflects the role of planning in managing project scope, resources, and time.

Submit

117. Las actividades que cumple todo proceso de desarrollo de software son:

Explanation

The correct answer is "Todas las anteriores" (All of the above). This is because all the activities mentioned in the options are indeed part of the software development process. Validating the software ensures that it meets the specified requirements and functions correctly. Designing and implementing the software involves creating the architecture and coding the program. Specifying the software involves defining the requirements and features. Lastly, evolving the software refers to making updates and improvements over time. Therefore, all of these activities are essential components of the software development process.

Submit

118. La principal ventaja de este modelo es que los servidores se pueden distribui a través de una red

Explanation

The given statement states that the main advantage of this model is that servers can be distributed across a network. The correct answer, "Arquitectura de repositorio" (Repository architecture), aligns with this statement as it refers to a distributed architecture where data is stored in a central repository and can be accessed by multiple servers across a network. This architecture allows for efficient sharing and management of data among different servers, making it the most suitable option based on the given statement.

Submit

119. Una empresa "X" desarrolla una aplicación de PC para el control de personal. ¿En que clasificación entra esa aplicación?

Explanation

The application developed by company "X" for PC control of personnel falls into the classification of "Personalizado" (Personalized). This means that the application is specifically tailored or customized to meet the specific needs and requirements of the company. It is not a generic or off-the-shelf solution, but rather a unique and personalized application designed to suit the specific needs of the company for personnel control.

Submit

120. Antes de comenzar la ejecución de un proyecto, es necesario tomarse el tiempo para desglosar el proyecto en tareas de manera que se pueda programar la ejecución de estas tareas y determinar los recursos que deben movilizarse.

Explanation

Before starting the execution of a project, it is necessary to take the time to break down the project into tasks so that the execution of these tasks can be scheduled and the resources that need to be mobilized can be determined. This process is called "Preparación" or preparation. It involves identifying and organizing the tasks required for the project and determining the necessary resources and timelines for each task. This step is crucial in ensuring that the project is well-planned and resources are effectively utilized.

Submit

121. Es un factor importante cuando se establece el plan de un proyecto y cuando ya está encaminado

Explanation

La comprensión de restricciones es un factor importante tanto al establecer el plan de un proyecto como cuando ya está en marcha. Las restricciones pueden incluir limitaciones de tiempo, recursos, presupuesto y cualquier otro factor que pueda afectar la ejecución del proyecto. Comprender estas restricciones es esencial para garantizar que el proyecto se desarrolle de manera eficiente y se cumplan los objetivos establecidos.

Submit

122. Es la selección y asignación de prioridades del proyecto, ya que depende del balance apropiado del tiempo y recurso para satisfacer objetivos específicos.

Explanation

The correct answer is "Identificación del proyecto". This is because the given statement mentions that it is about the selection and assignment of project priorities, which is dependent on identifying the project itself. The other options mentioned, "Alcance de las metas" (Scope of goals) and "Comprensión de riesgos" (Understanding risks), do not directly relate to the concept of selecting and assigning project priorities.

Submit

123. Implica algo que se prevé que puede funcionar mal, por lo que la planeación debe anticiparse a todos aquellos que puedan interferir en su adecuado desarrollo

Explanation

This answer is correct because it accurately identifies the concept of "comprensión de riesgos" which translates to "understanding of risks" in English. The given explanation states that it implies something that is expected to go wrong, so planning should anticipate any factors that may interfere with its proper development. This aligns with the understanding of risks, as it involves identifying potential risks and developing strategies to mitigate them in order to ensure the successful completion of a project or goal.

Submit

124. En esta actividad se incluyen estimaciones de costo y tiempo, y justifica por qué el contrato del proyecto se debe dar a una organización/equipo en particular.

Explanation

The correct answer is "Redacción de la propuesta". In this activity, the project proposal is written and presented, which includes cost and time estimates. This is important because it justifies why the project contract should be given to a particular organization or team. The proposal outlines the details of the project, including its objectives, deliverables, and budget, and persuades the decision-makers to choose the organization or team based on their capabilities and expertise in fulfilling the project requirements.

Submit

125. Es una actividad relacionada con la estimación de los recursos requeridos para llevar a cabo el plan del proyecto

Explanation

The given correct answer, "Estimación de costos del proyecto," refers to the activity of estimating the resources required to carry out the project plan. This involves determining the costs associated with the project, including materials, labor, and other expenses. Estimating project costs is crucial for effective budgeting and financial planning, ensuring that the project is financially viable and that resources are allocated appropriately.

Submit

126. El gestor debe conocer el progreso del proyecto con los costos anuales y los planificados

Explanation

Supervisión y revisión son necesarios para que el gestor pueda conocer el progreso del proyecto con los costos anuales y los planificados. A través de la supervisión, el gestor puede monitorear el avance del proyecto y asegurarse de que se esté cumpliendo con los objetivos establecidos. La revisión permite al gestor analizar los costos anuales y los costos planificados, identificar desviaciones y tomar las medidas necesarias para corregirlas. Estas actividades son fundamentales para garantizar el éxito del proyecto y la eficiencia en el uso de los recursos.

Submit

127. Deben redactar documentos concisos y coherentes que resuman la información crítica de los informes detallados del proyecto.

Explanation

The given answer, "Redacción y presentación de informes" (Writing and presenting reports), is the correct answer because it directly relates to the requirement of writing concise and coherent documents that summarize critical information from detailed project reports. This task involves the skill of effectively communicating project information through written reports, ensuring clarity and coherence in the presentation of information.

Submit

128. Durante la ejecución del proyecto, el costo y dotación de recursos es:

Explanation

Durante la ejecución del proyecto, el costo y dotación de recursos es alto. Esto significa que se requerirá una gran cantidad de recursos financieros y materiales para llevar a cabo el proyecto, lo cual puede implicar un mayor gasto y esfuerzo por parte del equipo. Este nivel de costo y dotación de recursos alto puede estar relacionado con la complejidad del proyecto, la magnitud de las tareas a realizar o la necesidad de contar con personal altamente especializado.

Submit

129. Algunos elementos a tomar en cuenta cuando se determinan las especificaciones del proyectos son:

Explanation

The given answer states that one of the elements to consider when determining project specifications is that each activity should be observable and evaluable in terms of its complexity. This means that it should be possible to measure and assess the complexity of each activity in order to effectively plan and manage the project. This helps in understanding the level of effort required for each activity and ensures that they can be properly executed and monitored.

Submit

130. Son problemas típicos de la gestión de proyectos, excepto

Explanation

The given options are common problems in project management, except for "Counting with an updated resource database". This means that having an updated resource database is not a typical problem in project management.

Submit

131. Las empresas orientadas por proyectos tienen como una de sus características ser: 

Explanation

Las empresas orientadas por proyectos se caracterizan por estar enfocadas en la ejecución eficiente y efectiva de los proyectos. Esto implica que su enfoque principal es en los procesos necesarios para llevar a cabo cada proyecto de manera exitosa. En lugar de estar orientadas a funciones o departamentos específicos, estas empresas se organizan en torno a los procesos necesarios para completar los proyectos, lo que les permite adaptarse y asignar recursos de manera más flexible y eficiente.

Submit

132. Persona(s) que proporciona(n) los recursos financieros para el proyecto.

Explanation

The correct answer is Sponsor/Patrocinador. In a project, the sponsor is the person or entity that provides the financial resources for the project. They are responsible for funding the project and ensuring that it has the necessary resources to be successful. The sponsor may also have a vested interest in the project's outcome and may provide guidance and support throughout its execution. The client, on the other hand, is the person or entity for whom the project is being carried out, and the interested parties may include stakeholders or individuals who have a stake in the project's success.

Submit

133. Una vez detalladas las tareas del proyecto a nivel de paquetes de trabajo, el siguiente paso es:

Explanation

The correct answer is "Asignación de cada tarea a los diferentes perfiles y dedicación estimada" which means "Assignment of each task to different profiles and estimated dedication". This step is the next logical step after detailing the project tasks at the level of work packages. It involves assigning each task to the appropriate individuals or roles and estimating the amount of time and effort required for each task. This helps in organizing and planning the project resources effectively. Identifying task risks and calculating task costs are also important steps in project management, but they are not mentioned as the next step in this context.

Submit

134. El portafolio de proyectos es:

Explanation

The correct answer is "Conjunto de programas y proyectos". A portfolio of projects refers to a collection or combination of both programs and projects. This means that it includes a range of initiatives and activities that are grouped together for management and strategic purposes. By having a portfolio that encompasses both programs and projects, organizations can effectively prioritize and allocate resources, monitor progress, and achieve their overall objectives.

Submit

135. La descomposición de objetivos generales en objetivos más pequeños se conoce como:

Explanation

La descomposición de objetivos generales en objetivos más pequeños se conoce como desglose de objetivos.

Submit

136. El inicio de un proyecto incluye las fases de:

Explanation

The correct answer is "Aprobación y Definición". In the beginning of a project, it is important to obtain approval from relevant stakeholders before moving forward. This includes gaining approval for the project's objectives, scope, and resources. Once approval is obtained, the project can proceed to the next phase, which is defining the project's requirements, goals, and deliverables. This phase involves identifying the project's scope, stakeholders, and potential risks. Therefore, the correct answer is "Aprobación y Definición".

Submit

137. Método cualitativo de análisis de proyectos en el cuál se adjudican pesos a una serie de criterios y se valora la medida en que cada proyecto cumple dichos criterios:

Explanation

Scoring is a qualitative method of project analysis in which weights are assigned to a series of criteria and the extent to which each project meets those criteria is evaluated. This method involves assigning scores or points to different aspects of a project based on their importance and then calculating a total score for each project. The higher the score, the better the project is considered to be. This approach allows for a systematic and standardized evaluation of projects based on predetermined criteria.

Submit

138. Fase de un proyecto en la cual se interpreta el proyecto y se analiza su viabilidad técnica y económica.

Explanation

The correct answer is "Aprobación". In this phase of a project, the project is reviewed and its technical and economic feasibility is analyzed. This implies that the project is being evaluated for its viability and potential success. Once the project has been thoroughly assessed and deemed feasible, it can proceed to the approval stage where it is given the green light to move forward.

Submit

139. El modelo de estimación de costos, en el cuál, los costos se estiman en base a las condiciones del mercado y la competencia se llama:

Explanation

The correct answer is "Precio ganador". This term refers to a cost estimation model where costs are estimated based on market conditions and competition. In this model, the goal is to determine the price that will allow a company to win the bid or competition while still making a profit. This approach takes into account factors such as market demand, competitor prices, and the company's own costs to determine the optimal price that will give them a competitive advantage.

Submit

140. Cualquier producto para ejecutar un servicio, o requerido para completar un proceso se conoce como:

Explanation

El término "entregable" se refiere a cualquier producto o elemento que se entrega como resultado de un servicio o proceso. En este contexto, se utiliza para describir cualquier producto necesario para ejecutar un servicio o completar un proceso. Por lo tanto, "entregable" es la respuesta correcta para esta pregunta, ya que describe de manera precisa y concisa los productos necesarios para ejecutar un servicio o completar un proceso.

Submit

141. ¿Cuál de los siguientes elementos son factores influenciadores de la cultura de proyectos?

Explanation

La base corporativa de conocimiento es un factor influenciador de la cultura de proyectos porque representa el conjunto de experiencias y conocimientos acumulados en una organización a lo largo del tiempo. Esta base de conocimiento puede incluir lecciones aprendidas de proyectos anteriores, mejores prácticas, metodologías y herramientas utilizadas. Al tener acceso a esta base de conocimiento, los equipos de proyectos pueden aprender de las experiencias pasadas y aplicar ese conocimiento en la planificación y ejecución de nuevos proyectos, lo que contribuye a la cultura de proyectos de la organización.

Submit

142. Una empresa dedicada al comercio necesita que se desarrolle una aplicación que le permita gestionar la entrega y el envío de sus productos en las diferentes matrices con las que cuenta a nivel nacional. Sin embargo, la aplicación estaría sujeta a cambios si se presentasen modificaciones en la nueva ley agraria. El usuario se encuentra preocupado por las posibles implicaciones que tendría en la solución informática, por las posibles transformaciones que se tuviera que realizar. El analista debería en ese caso actuar de la siguiente manera:

Explanation

The correct answer is that the analyst should create an application that is flexible enough to accommodate future modifications without being too complicated to implement the changes. This is because the user is concerned about the possible implications of the new agrarian law on the software solution, and having a flexible application would allow for easier adaptation to any changes that may arise.

Submit

143. ¿Cuál de los siguientes productos de software son personalizados? 

Explanation

PostgreSQL is the correct answer because it is a database management system that can be customized according to specific needs and requirements. Unlike Microsoft Office, which is a suite of pre-packaged software applications, and the Sistema de control de citas médicas (Medical appointment scheduling system), which is likely to be a standardized software solution for managing medical appointments, PostgreSQL offers the flexibility to tailor the database to individual preferences and specifications.

Submit

144. Una de las principales metas del trabajo en parejas dentro de las metodologías de desarrollo, es que se podrá realizar aplicaciones en menor tiempo, compartiendo conocimientos de los integrantes del equipo. En caso de que no exista  consenso  entre los integrantes del grupo se debería:

Explanation

If there are disagreements within the team, it is preferable for the team to dissolve or to hire new members who share the same criteria. This is because effective teamwork requires a harmonious working environment where members can collaborate and make decisions together. If there are constant conflicts and disagreements, it can hinder the progress and productivity of the team. Therefore, it is better to either dissolve the team or bring in new members who can work well together.

Submit

145. Los sistemas de procesamiento en lotes permiten:

Explanation

Los sistemas de procesamiento en lotes permiten procesar grandes cantidades de datos de manera eficiente y en lotes, lo que es especialmente útil para tareas como el procesamiento de pagos de salario. Sin embargo, no están diseñados específicamente para controlar el software de un teléfono celular móvil. Por otro lado, los sistemas de entretenimiento personal como los juegos son un ejemplo de aplicación que se beneficia del procesamiento en lotes, ya que pueden manejar grandes cantidades de datos y realizar cálculos complejos en segundo plano mientras el usuario disfruta del juego.

Submit

146. El rector de la Universidad Nacional de Loja, solicita que se cree un sistema íntegro que gestione todas las funciones para la entidad universitaria. Como el proyecto se compone de algunos sistemas independientes que luego se relacionarán entre sí, y como el rector necesita que se muestren avances periódicos del mismo para tomar respectivas correcciones si las hubiera, la metodología óptima para el proyecto debería ser:

Explanation

The most suitable methodology for the project would be the waterfall methodology. This is because the project consists of independent systems that will be related to each other later on, and the rector needs periodic updates to make any necessary corrections. The waterfall methodology is a linear and sequential approach that allows for clear planning, defined stages, and regular progress reports, making it ideal for this situation.

Submit

147. En el proceso de diseño e implementación del software:     

Explanation

The correct answer is "Valida y comprueba que el software cumpla los requerimientos." This option states that in the process of designing and implementing software, it is important to validate and verify that the software meets the requirements. This involves testing and checking the software to ensure that it functions correctly and meets the intended objectives and specifications.

Submit

148. Para el famoso juego del buscaminas, indique cuáles son los posibles casos de uso:

Explanation

The possible use cases for the famous game of Minesweeper are to start a game, play the game, and count the number of mines. These actions are necessary for the game to function properly and for the player to progress and win the game. The other options mentioned, such as discovering a cell or marking a cell, are specific actions within the gameplay and not overall use cases for the game itself.

Submit

149. Si luego de la presentación de una aplicación, el usuario y cliente de la empresa desarrolladora de software, decide no devengar el valor de la misma, argumentando que la versión final del programa no está acorde a la planificación inicial, el programador debería:

Explanation

The answer suggests that if the programmer followed good practices, they should not have any problem in this situation. They can refer to the vision and requirement specification documents, which should have been authorized before the development of the application, to address any discrepancies or misunderstandings with the client. This implies that proper documentation and communication with the client can help resolve the issue and potentially offer the application to a new interested party.

Submit

150. Los administradores del proyecto de software se encargan de:

Explanation

Los administradores del proyecto de software se encargan de programar el software con todos sus componentes, diseñar, programar e implementar el software. Esto implica que tienen la responsabilidad de crear el código del software y asegurarse de que todas las partes del software estén programadas correctamente. También son responsables de diseñar el software y luego programarlo e implementarlo según los requisitos del proyecto. En resumen, los administradores del proyecto de software tienen un papel integral en el desarrollo y la implementación exitosa del software.

Submit

151. En un procesador de textos, ¿cuáles de los siguientes serían requerimientos funcionales?

Explanation

Los requerimientos funcionales en un procesador de textos son las capacidades y funcionalidades que el software debe tener para cumplir con su propósito. En este caso, los requerimientos funcionales serían: copiar, pegar, generar informes de caracteres, página y párrafos, y guardar los documentos.

Submit

152. La programación extrema consisten en: ____________

Explanation

La programación extrema se basa en invertir más tiempo en diseñar el sistema. Esto se debe a que la programación extrema se centra en la entrega rápida de software funcional y de alta calidad. Al invertir más tiempo en la etapa de diseño, se pueden identificar y resolver posibles problemas y mejorar la estructura del sistema antes de comenzar a escribir el código. Esto ayuda a reducir los errores y mejorar la eficiencia del desarrollo, lo que a su vez conduce a un producto final de mejor calidad.

Submit

153. Se desea realizar un sistema de atención al cliente online para una operadora de telefonía móvil. Se ha determinado como requerimiento que el sistema funcione de acuerdo al horario laboral de los empleados, es decir de 08h00 a 19h00. El presente requerimiento no funcional puede ser clasificado como:

Explanation

The requirement for the online customer service system to operate according to the employees' working hours is classified as a requirement of the organization. This means that it is a specific need or expectation set by the organization itself in order to align the system's functionality with the operational hours of its employees. It is not a requirement of the product itself or an external requirement imposed by a third party.

Submit

154. La UTPL crea un sistema para albergar los datos de las pruebas de admisiones de los nuevos aspirantes. Como política de la Universidad, el sistema implementara provisiones para la privacidad de los datos de los aspirantes. Este requerimiento no funcional, puede ser clasificado como: 

Explanation

The correct answer is "Requerimiento externo" because it refers to a requirement that comes from outside the organization or product. In this case, the requirement for privacy provisions for the data of new applicants is a demand that is imposed by external factors, such as legal or regulatory requirements.

Submit

155. Se necesita modelar las interacciones entre los actores y los objetos de un sistema. El diagrama recomendado para dicho fin sería:

Explanation

El diagrama de secuencia es el más adecuado para modelar las interacciones entre los actores y los objetos de un sistema. Este diagrama muestra la secuencia de mensajes que se envían entre los diferentes objetos del sistema, lo que permite visualizar cómo se intercambian información y cómo se lleva a cabo el flujo de control en el sistema. Esto hace que sea una herramienta útil para comprender y analizar las interacciones entre los diferentes componentes de un sistema.

Submit

156. Los diagramas  de caso de uso son:

Explanation

Los diagramas de caso de uso son una herramienta de modelado que se utiliza en el análisis y diseño de sistemas de software. Estos diagramas representan la interacción entre los actores (usuarios o sistemas externos) y el sistema en estudio. Su principal objetivo es mostrar cómo los actores interactúan con el sistema para lograr ciertos objetivos. En este caso, la respuesta correcta indica que los diagramas de caso de uso muestran la forma en que los objetos se comunican entre sí a lo largo del tiempo, lo cual es una descripción precisa de su función.

Submit

157. Una aplicación necesita almacenar información sobre empresas, sus empleados y sus clientes. De estos dos últimos se necesita su nombre y su edad. Los empleados tienen un sueldo bruto, los directivos tienen una tabla salarial, así como un conjunto de empleados subordinados. De los clientes además se necesita conocer su teléfono de contacto. Para dicha aplicación se necesita crear un diagrama de clases. Las clases de aquel diagrama serían:

Explanation

The correct answer is "Persona: (Cliente y empleado: directivo), Empresa." This answer correctly identifies that there should be a class called "Persona" which includes both "Cliente" and "Empleado" as subclasses. Additionally, there should be a separate class called "Empresa" to represent the companies. This design allows for the storage of information about companies, their employees, and their clients, including their names, ages, salaries, contact information, and hierarchical relationships.

Submit

158. En el conocido juego de dados del 7: El jugador tira ambos dados y suma las caras superiores. Previamente, se hace una apuesta sobre lo que será la suma de los dados. En caso de que haya apostado a que la suma sería abajo del siete y acertó, gana la suma apostada. Lo mismo sucede cuando apuesta arriba del 7. En caso de que haya elegido el 7 y acierta, gana el triple de la apuesta. En caso de no acertar, pierde la cantidad apostada. Uno de los requerimientos funcionales pudiera ser:

Explanation

The system should not keep track of the player's initial capital because it is not relevant to the gameplay. The game is based on the player's bets and the outcome of the dice roll, not on their starting amount of money.

Submit

159. Para un caso de estudio en donde se busque simular el comportamiento de un cajero automático, cuáles de los siguientes serían casos de uso:

Explanation

The correct answer is "Revisar saldo. Realizar depósito. Realizar retiro." These are the appropriate use cases for simulating the behavior of an ATM. "Revisar saldo" refers to checking the account balance, "Realizar depósito" refers to making a deposit, and "Realizar retiro" refers to making a withdrawal. These actions are commonly performed by users at an ATM and are essential functionalities to simulate in a case study of an ATM system.

Submit

160. La metodología que se basa en el desarrollo de un sistema como una serie de versiones, y cada versión añade una funcionalidad a la versión anterior es:

Explanation

The correct answer is "Modelo en cascada." The explanation for this is that the question is asking for the methodology that is based on developing a system as a series of versions, with each version adding functionality to the previous version. The waterfall model is a sequential design process in which progress is seen as flowing steadily downwards through the phases of conception, initiation, analysis, design, construction, testing, production/implementation, and maintenance. This model is characterized by its linear and sequential approach, where each phase must be completed before moving on to the next one.

Submit

161. Al estudiar Ingeniería de Software, uno de los objetivos principales de la misma es:

Explanation

The correct answer is "Obtener las mayores ganancias a partir de los sistemas desarrollados" (Obtain the highest profits from the developed systems). This answer aligns with the main objective of studying Software Engineering, which is to create systems that generate significant financial gains. By developing efficient and high-quality software systems, companies can maximize their profits and achieve success in the market.

Submit

162. Un ingeniero en desarrollo de software no debe preocuparse por temas técnicos sino también de

Explanation

An engineer in software development should not only focus on technical issues but also on learning how to improve systems. This implies that in addition to having technical knowledge, the engineer should also be concerned with enhancing the efficiency and effectiveness of software systems. This may involve studying and implementing best practices, staying updated with the latest technologies, and constantly seeking ways to optimize and enhance the software development process. By continuously striving to improve systems, the engineer can contribute to the overall success and quality of software projects.

Submit

163. El objetivo básico de un estudio de viabilidad es:

Explanation

The basic objective of a feasibility study is to determine if the organization has the necessary resources and capabilities to undertake the project. This involves assessing factors such as financial resources, human resources, technical capabilities, and any other requirements needed to successfully complete the project. By evaluating these aspects, the organization can make an informed decision about whether to proceed with the project or not.

Submit

164. Un estudio formal de viabilidad probablemente contenga:

Explanation

not-available-via-ai

Submit

165. ¿Por qué es importante que el acta de constitución del proyecto sea firmada por una persona altamente ubicada en la organización?

Explanation

It is important for the project charter to be signed by a high-ranking person in the organization because it signifies the relative importance and priority of the project within the organization. This helps in securing resources and support for the project. Additionally, the signature provides authority to the project manager to cross functional boundaries and make decisions related to project planning and activities. Furthermore, the signature adds credibility to the project in the eyes of external stakeholders, making it easier to request contributions or gather support. Therefore, all of the given options are correct reasons for the importance of the project charter being signed by a high-ranking person.

Submit

166. En general, las habilidades técnicas de un gerente de proyecto:

Explanation

The correct answer is a) Tienen que ser suficientemente altas para entender cuestiones técnicas y explicar decisiones técnicas a otros. This means that a project manager should have a good understanding of technical issues and be able to communicate and explain technical decisions to others. While it is important for a project manager to have technical skills, it does not necessarily mean that their skills need to be equal or higher than other team members. Additionally, technical skills should be considered when selecting a project manager, but they are not the sole criterion for selection.

Submit

167. El acta de constitución del proyecto es un documento expedido por:

Explanation

The correct answer is b) El director del proyecto. The project charter is a document that formally authorizes the existence of a project and provides the project manager with the authority to apply organizational resources to project activities. The project charter is typically issued by the project sponsor or the individual who has the authority to initiate the project. In this case, the director of the project is the one who issues the project charter, giving the project manager the authority to proceed with the project.

Submit

168. En una estructura matricial:

Explanation

In a matrix structure, employees belong to the functional manager but report to both the functional manager and the project manager. This means that while the employees are under the authority of the functional manager, they also have reporting responsibilities to the project manager. This allows for a dual reporting relationship, ensuring that employees are accountable to both the functional goals and the project goals.

Submit

169. El acta de constitución del proyecto debe contener:

Explanation

The correct answer is b) Una lista de los miembros del equipo del proyecto. The project charter or acta de constitución del proyecto is a document that formally authorizes the existence of a project. It outlines the project's objectives, scope, deliverables, and stakeholders. One of the key components of the project charter is a list of the project team members. This helps identify who will be responsible for executing the project and ensures that all necessary roles and responsibilities are assigned.

Submit

170. Usted es el director de proyectos para la construcción de un edificio de oficinas comerciales que tiene características muy similares a un proyecto de construcción realizado por su compañía dos años antes. Para comenzar con su definición de actividades. ¿Cuál es el mejor enfoque?

Explanation

The best approach is to use the previous list of activities as a tool to help construct the new list. This is because the new project has similar characteristics to the previous one, so it is likely that many of the activities will be the same or similar. By using the previous list as a starting point, the project manager can save time and effort in defining the activities for the new project. However, it is important to review and update the list to account for any differences or changes in the new project.

Submit

171. La planificación de la estimación de los recursos de actividades es:

Explanation

The correct answer is c) La identificación y distribución de todos los recursos requeridos para completar las actividades del cronograma. This option explains that the planning of activity resource estimation involves identifying and distributing all the resources needed to complete the activities in the schedule. It emphasizes the importance of determining the necessary resources and allocating them properly to ensure the successful completion of the project activities according to the established timeline.

Submit

172. La planificación de calidad es el proceso de

Explanation

Quality planning involves identifying the quality requirements and standards for the project and the product, and documenting how these requirements will be met. It is the process of determining what needs to be done to ensure that the project and product meet the desired level of quality. This includes identifying the quality standards, documenting the processes and procedures to be followed, and ensuring that the necessary resources and activities are in place to achieve the desired quality.

Submit

173. Benchmarking puede ayudar a determinar:

Explanation

Benchmarking es un proceso en el que una empresa compara sus productos, servicios o procesos con los de otras organizaciones líderes en la industria. Al realizar esta comparación, la empresa puede identificar las mejores prácticas y características que otras organizaciones están utilizando para lograr la satisfacción del cliente. Por lo tanto, el benchmarking puede ayudar a determinar qué productos o servicios ofrecer y qué características incluir, lo cual hace que la respuesta a) sea correcta.

Submit

174. Los diagramas de Hitos:

Explanation

Los diagramas de hitos muestran el cronograma general del proyecto y la fecha de ejecución. Estos diagramas proporcionan una visión general de las actividades y eventos clave del proyecto, lo que permite al equipo del proyecto planificar y programar las tareas de manera eficiente. Los hitos son puntos de referencia importantes en el proyecto y representan eventos o logros significativos que deben alcanzarse en fechas específicas. Por lo tanto, la opción b) es la respuesta correcta, ya que describe adecuadamente la función principal de los diagramas de hitos.

Submit

175. Un programa se considera que es:

Explanation

A program is considered to be a strategy for managing project risks. This means that a program is not just a collection of related projects or one or more phases of a project, but rather a comprehensive plan or approach specifically designed to address and mitigate the risks associated with the project.

Submit

176. El Plan de Gestión de las Comunicaciones es una entrada importante para la gestión de los interesados porque:

Explanation

The correct answer is "a) Mantiene a los interesados involucrados con la gestión día a día del proyecto." The Communications Management Plan is an important input for stakeholder management because it helps to keep stakeholders engaged and involved in the project on a daily basis. By outlining the communication channels, frequency, and methods, the plan ensures that stakeholders are kept informed and can provide feedback and input throughout the project lifecycle. This helps to maintain their involvement and ensures that their needs and expectations are being addressed.

Submit

177. Todas las herramientas y técnicas manuales o automatizadas usadas para recolectar,archivar y distribuir información del proyecto en un proyecto es conocida como el:

Explanation

The correct answer is c) Software empresarial de la gestión de proyectos. This answer is correct because it states that todas las herramientas y técnicas manuales o automatizadas usadas para recolectar, archivar y distribuir información del proyecto en un proyecto es conocida como el software empresarial de la gestión de proyectos. This means that the software used for collecting, archiving, and distributing project information is referred to as enterprise project management software.

Submit

178. La Oficina del Proyecto es

Explanation

The correct answer is c) Otro término para nombrar al centro de mando. This means that "La Oficina del Proyecto" is another term used to refer to the center of command. It suggests that the office is responsible for overseeing and coordinating the project activities, making important decisions, and ensuring that the project goals are achieved. It implies that the office is the central hub where project management and control take place.

Submit

179. El plan de gestión de comunicaciones es un documento que brinda

Explanation

The correct answer is b) Una descripción de la información a ser distribuida, incluyendo formato, contenido y convenciones / definiciones a ser usadas. This answer is correct because the plan de gestión de comunicaciones, or communications management plan, is a document that outlines how communication will be managed and distributed throughout a project. It includes details on the information that will be shared, such as the format, content, and conventions or definitions to be used. This plan helps ensure effective communication and coordination among project stakeholders.

Submit

180. ¿Cuál de las siguientes opciones involucra determinar las cantidades que serán usadas para realizar las actividades del proyecto?

Explanation

La opción a) Planificación de recursos implica determinar las cantidades de recursos necesarios para llevar a cabo las actividades del proyecto. Esto incluye identificar y asignar los recursos humanos, materiales y financieros necesarios, así como establecer un plan detallado de cómo se utilizarán estos recursos durante el proyecto. La planificación de recursos es esencial para asegurar que se cuenten con los recursos adecuados en el momento adecuado, lo que contribuye a la ejecución exitosa del proyecto.

Submit

181. Se diseña una aplicación destina a la venta y reproducción de música por internet. ¿Cuál de los siguientes patrones arquitectónicos se debería implementar para dicha aplicación?

Explanation

The correct answer is "Pipeline" because a pipeline architecture is suitable for an application that involves the sequential processing of multiple stages or steps. In the context of a music selling and playback application, a pipeline architecture can be used to handle the flow of data and operations, such as fetching music files, processing payments, and streaming music to users. This architecture allows for efficient and parallel processing of tasks, enhancing the overall performance and scalability of the application.

Submit

182. En el momento de diseñar sistemas grandes, además de los patrones arquitectónicos: ¿Qué otros aspectos debería tener en cuenta?

Explanation

One aspect to consider when designing large systems is not spending too much time gathering information as it can lead to a waste of time in coding, development, and implementation. Another important aspect is the choice of programming language. Additionally, the system should provide different inputs, outputs, operations, controls, and procedural techniques.

Submit

183.  Una de las estrategias de la Programación Extrema es la programación en pares que consiste en trabajar en parejas en una misma estación de trabajo. De esto se puede decir que:

Explanation

La respuesta correcta es incorrecta porque la programación en pares de la Programación Extrema sí ayuda a socializar con todos los miembros del equipo y a abordar los inconvenientes del proceso de desarrollo. Al trabajar en parejas en una misma estación de trabajo, se fomenta la comunicación constante entre los miembros del equipo, lo que permite discutir y resolver problemas de manera colaborativa. Además, el intercambio de ideas y la corrección de errores en conjunto también contribuyen a mejorar la calidad del software desarrollado. Por lo tanto, la afirmación de que el trabajo en equipo no ayuda a socializar y abordar los inconvenientes del proceso de desarrollo es incorrecta.

Submit

184. En Ingeniería de Requerimientos, al momento de identificar los requerimientos se debe tener claro:

Explanation

The correct answer is "De conocer muy bien las necesidades que tiene el cliente." In requirements engineering, it is crucial to have a clear understanding of the client's needs. This involves actively listening to the client, conducting thorough interviews, and gathering all relevant information to ensure that the requirements accurately reflect the client's goals and expectations. By knowing the client's needs well, the engineering team can develop effective and tailored solutions that meet the client's requirements.

Submit

185. La ingeniería de software: 

Explanation

La ingeniería de software está relacionada con la Programación de Computadores, las Ciencias de la Computación, la Administración General y la Ingeniería de Sistemas. Esto significa que la ingeniería de software se basa en los principios y conocimientos de estas disciplinas para desarrollar software de manera eficiente y efectiva. La programación de computadoras y las ciencias de la computación proporcionan los fundamentos teóricos y prácticos necesarios para diseñar y desarrollar software, mientras que la administración general y la ingeniería de sistemas ayudan a organizar y gestionar el proceso de desarrollo de software de manera efectiva. En resumen, la ingeniería de software se beneficia de la interacción y el conocimiento de estas disciplinas relacionadas para crear software de calidad.

Submit

186. Entre las cualidades más relevantes para un producto de software que provee funcionalidad a un teléfono celular están:  

Explanation

The given answer includes qualities that are relevant for a software product that provides functionality to a cellphone. These qualities include user interface friendliness, efficiency in resource consumption, response times, and suitability for use. These qualities are important for ensuring a positive user experience, optimizing performance, and meeting the specific needs and requirements of the users.

Submit

187. El modelo de proceso en cascada: 

Explanation

El modelo de proceso en cascada presenta como mayores ventajas su simplicidad y el poner orden en las tareas a desarrollar. Sin embargo, una de sus principales desventajas es que no brinda mecanismos para evaluar de forma temprana los atributos de calidad externos del producto. A medida que crece la envergadura de un proyecto, aumentan los riesgos asociados y el modelo en cascada no proporciona ningún mecanismo para manejarlos. Por otro lado, el agregado de la construcción de prototipos permite evaluar diversos riesgos relacionados con el costo, esfuerzo o atributos de calidad del producto final.

Submit

188. El modelo de proceso V 

Explanation

The correct answer (c) states that early detection of defects is important because the cost of fixing defects increases significantly as the project progresses. This means that identifying and addressing any issues or flaws in the requirements, general design, and detailed design early on can help prevent costly and time-consuming rework later in the project. By emphasizing the importance of early defect detection, the V model of process highlights the need for thorough verification planning and execution throughout the development lifecycle.

Submit

189. En clase se presentaron dos variantes de modelos de proceso en fases  

Explanation

The correct answer states that neither of the two variants of the process model limits the characteristics of the process model applied in each phase. This means that it is possible to combine both modalities by conducting partial releases in exploitation in each phase and carrying out each of these phases through internal partial releases for evaluation. In other words, the two variants can be integrated to allow for both early evaluation of external quality attributes and reduced time to market.

Submit

190. Un director de proyecto debe tener: 

Explanation

A project manager needs to have knowledge of project management, knowledge of the specific field or industry the project is in, and an understanding of the cultural and social environment in which the project will be carried out. Additionally, having knowledge of the labor market can also be beneficial for a project manager in terms of understanding the availability of resources and potential challenges related to hiring and managing a project team.

Submit

191. ¿Por qué interesa determinar el camino crítico?

Explanation

Determinar el camino crítico es importante para identificar las actividades que, si se retrasan, afectarán la duración total del proyecto. Esto permite a los gestores del proyecto priorizar y asignar recursos adecuadamente, asegurando que las actividades críticas se realicen a tiempo para evitar retrasos en la finalización del proyecto. Además, al identificar el camino crítico, se puede realizar un control mayor de calidad en las actividades que tienen un impacto directo en la duración total, garantizando así la entrega exitosa del proyecto.

Submit

192. La productividad es  _______

Explanation

La productividad es la relación entre el tamaño de la producción y el esfuerzo invertido. En otras palabras, se refiere a la eficiencia con la que se utiliza el esfuerzo para generar un determinado tamaño de producción. Cuanto mayor sea el tamaño de la producción en relación con el esfuerzo invertido, mayor será la productividad. Por lo tanto, la productividad se puede calcular dividiendo el tamaño de la producción entre el esfuerzo empleado.

Submit

193. Para estimar el personal requerido, lo mejor es: 

Explanation

The best way to estimate the required personnel is to consider the phase of development. Different phases of a project may require different levels of manpower. For example, the initial stages may require a smaller team for planning and design, while the later stages may require a larger team for implementation and testing. By considering the phase of development, the project manager can allocate the appropriate number of people to ensure efficient and timely completion of the project.

Submit

194. En las técnicas de medición del avance para productos tangibles, 

Explanation

In the measurement techniques for tangible products, fixed formula techniques allocate a percentage once the task has started, and the remaining percentage is allocated at the end. This method reflects the actual progress and is suitable for short tasks. However, the measured progress may be biased by intermediate estimates.

Submit

195. Los prototipos tempranos son recomendados en una situación donde: 

Explanation

Early prototypes are recommended in a situation where the requirements are unclear, the success of the system depends largely on the usability and friendliness of the interface, and the technology to be used is unknown.

Submit

196. Las redes de Petri:  

Explanation

Las redes de Petri permiten describir concurrencia. Esto se debe a que las redes de Petri son un modelo matemático utilizado para representar sistemas concurrentes, donde múltiples eventos pueden ocurrir simultáneamente. Estas redes constan de lugares, transiciones y arcos, que representan estados, eventos y relaciones entre ellos respectivamente. Al describir un sistema concurrente con una red de Petri, se puede visualizar y analizar la concurrencia de eventos y cómo interactúan entre sí. Por lo tanto, la afirmación de que las redes de Petri permiten describir concurrencia es correcta.

Submit

197. Con respecto a los requisitos 

Explanation

The correct answer is "Entre las técnicas de obtención de requisitos se tienen: Casos de Uso, Tormenta de ideas, Prototipado y Encuestas." The explanation is that this statement correctly identifies the techniques for gathering requirements, which include Use Cases, Brainstorming, Prototyping, and Surveys. These techniques are commonly used in the software development process to gather and document the requirements of a system.

Submit

198. Respecto a la arquitectura de software  

Explanation

The explanation for the given correct answer is that in the Shared-Data architecture style, there is a central storage of data and components that operate on it. This means that all the components in the system use the same data model. This architecture style allows for consistency and synchronization of data across different components, ensuring that they all have access to the most up-to-date information. It simplifies the development process as changes to the data model only need to be made in one place, reducing the chances of inconsistencies or conflicts in the system.

Submit

199. Los estilos de Arquitectura de Software implican la definición de componentes, interacciones y exigencias al combinarlos, por ejemplo 

Explanation

The correct answer is "en pizarrón las fuentes de conocimiento interactúan entre sí únicamente a través del pizarrón, respondiendo a cambios en el mismo." This answer is correct because it accurately describes the interaction between knowledge sources in a whiteboard architecture style. In this style, the knowledge sources only interact with each other through the whiteboard, and they respond to changes made on the whiteboard. This style allows for collaboration and communication between the knowledge sources in a centralized manner.

Submit

200. ¿Es la memoria que se utiliza para acelerar el proceso, es de alta velocidad, permite que el procesador tenga más rápido acceso a los datos? 

Explanation

Cache memory is a type of memory that is used to speed up the processing of data by providing high-speed access to frequently used data. It allows the processor to quickly retrieve and store data, reducing the need to access slower main memory. Cache memory acts as a buffer between the processor and main memory, improving overall system performance.

Submit
×
Saved
Thank you for your feedback!
View My Results
Cancel
  • All
    All (200)
  • Unanswered
    Unanswered ()
  • Answered
    Answered ()
Cuando se busca que el software ahorre uso de la memoria y el...
Se está desarrollando una aplicación web, para...
Si buscas que tu sistema sea mantenible, te enfocas en:
Vigila las desviaciones del plan, emprende acciones correctivas,...
Determinación de gastos e ingresos durante la vida del proyecto
En la valoración de riesgos, aquellos riesgos que necesitan ser...
La planificación orientada a objetivos es un enfoque...
Es una causa frecuente de fracaso en los proyectos. 
Un factor crítico de éxito de un proyecto es:
Las siguientes son características de un proyecto planificado
Fase del proyecto en la cuál se realiza la definición y...
Las operaciones difieren del proyecto en que son:
Los hitos para considerarse efectivos deben reflejar el qué y...
En los productos de software genéricos. ¿Quiénes...
Uno de los dilemas éticos en cuanto a la sociedad de la...
Un establecimiento educativo desea contratar una empresa...
Una empresa requiere se cree un software para una necesidad...
¿Cuáles de las siguientes actividades recomienda el...
Durante el desarrollo de una aplicación, en la etapa de...
En el diseño de un sistema telefónico celular,...
En un sistema de reservación de vuelos, ¿Cuál de...
Which one do you like?
Para el juego de ajedrez ¿Cuál de los siguientes ejemplos...
Para un juego de motocicletas, ¿Cuáles de los siguientes...
Which one do you like?
Which one do you like?
En el siguiente requerimiento: "A cada pedido se le deberá...
Si se desarrollara un software profesional basado en la Web, una de...
El objetivo del plan de gestión de alcance es
¿Por qué los entregables deben ser desglosados en paquetes...
En la reducción de la duración del proyecto, la primera...
Las lecciones aprendidas durante el proyecto:
La línea base de costos debería incluir:
El plan del proyecto es usado para gerenciar:
Una descripción del trabajo autorizado a ser realizado por el...
 La profesión de "Arquitecto de Software":...
Existen cuatro actividades del proceso de Ingeniería de...
Respecto a los atributos de calidad del software
Which one do you like?
Which one do you like?
Select the ones you like
Las limitaciones de las LOCs son que: 
Un riesgo es:   
La relación entre calidad de proceso y calidad del producto:
La entrevista individual, como técnica de relevamiento de...
Los casos de uso:  
¿Cuál de los siguientes es una división del...
¿Cuál de los siguientes es el Sistema Operativo que no...
¿Cuál de las siguientes es una función del Sistema...
Al borrar un archivo se puede recuperar este solo si no se ha grabado...
Sirve para reorganizar la información en disco y que se puede...
¿Cuál de las siguientes es una manera de evitar virus en...
Una red de telecomunicaciones internacional que consiste en documentos...
Para colocar texto en el pisapapeles siempre es necesario...
¿Cuándo solo deseamos copiar el formato de algún...
¿Cómo cambias el tamaño de un objeto en un paquete...
¿Qué usarías para colocar objetos en un sitio...
La fórmula = IF( A1 < B1 , MIN (A1:A5), MIN(B1:B5))...
Cada una de las afirmaciones siguientes es verdadera para un filtro...
En una base de datos, que almacena información de los socios de...
¿Cómo debe ser la estructura de un mapa conceptual? 
¿Qué es una lista de cotejo? 
¿Cuál de estos es un tipo de Tabla de verdad? 
En un proyecto de software que busca el desarrollo de un sistema...
Se recaba, analiza y procesa toda la información que...
Los gestores, generalmente, seleccionan a las personas que...
Planificar las actividades de un proyecto y construir su plan...
De la etapas de la fase de planificación de un proyecto,...
Muchas organizaciones han fortalecido sus equipos de gestión de...
El plan del proyecto
Los requerimientos de un sistema pueden ser:
Cumple con la tarea de integrar los esfuerzos dirigidos hacia la...
Una vez que el proyecto ha finalizado, es buena idea que el...
Se refiere a la identificación de actividades, hitos y entregas...
Surgen en el interior de un proyecto debido a problemas en su...
La _______ administra los procesos internos del mismo, donde realmente...
Durante el proceso de contratación, una vez realizada la...
Durante el proceso de evaluación de riesgos de los proyectos de...
Una de las características de las empresas orientadas por...
La preparación de la propuesta o memoria puede ser realizada...
Método cuantitativo para la selección de un proyecto:
Como camino o ruta crítica se conoce a la:
¿Cuál NO es un proyecto?
La fase de proyecto más adecuada para la identificación...
Como tarea predecesora se conoce a:
¿Hasta qué momento, durante la ejecución de un...
Consiste en dividir los paquetes de trabajo en unidades más...
La planificación de proyectos es considerado
Durante la ejecución del proyecto, el costo y dotación...
El documento que formaliza el inicio de un PROYECTO se conoce como:
El propósito de un proyecto es:
Método cuantitativo para la selección de un proyecto:
La definición de hitos en el proyecto debe estar...
Cuando el gerente del proyecto es quien controla el presupuesto del...
El proyecto ha completado su ejecución, y ahora es tiempo para...
La información de la estimación de costo puede ser...
Insistir en que todos los miembros del equipo y proveedores usen...
En la especificación de requisitos, las descripciones...
 Un EBP (Elementary Business Process / Proceso de Negocio...
Nos sirve para disminuir el tamaño que ocupa físicamente...
¿Cuál es el operador para construir una referencia...
Is [your statement here] true or false?
¿Cuál será el valor desplegado con el siguiente...
¿Qué es un analogía?
Si usted fuera un gerente de proyecto de software, ¿Qué...
Dirigir, reunirse con el equipo, resolver problemas y asegurar...
Es uno de los aspectos esenciales de un proyecto ya que constituye el...
Al completar el alcance total de un proyecto con calidad, a tiempo y...
Luego de un proceso de valoración de los riesgos, para aquellos...
Es la disciplina de organizar y administrar recursos de manera tal que...
Es la planeación, organización, dirección y...
Los proyectos son, en su mayoría, mixtos, que involucran...
El documento que proporciona información de un proyecto y...
La triple restricción consiste en:
La capacidad de incluir en las características finales del...
Define el alcance, recursos y tiempo requerido. Permite mantenerlos en...
Las actividades que cumple todo proceso de desarrollo de software son:
La principal ventaja de este modelo es que los servidores se pueden...
Una empresa "X" desarrolla una aplicación de PC para...
Antes de comenzar la ejecución de un proyecto, es necesario...
Es un factor importante cuando se establece el plan de un proyecto y...
Es la selección y asignación de prioridades del...
Implica algo que se prevé que puede funcionar mal, por lo que...
En esta actividad se incluyen estimaciones de costo y tiempo, y...
Es una actividad relacionada con la estimación de los recursos...
El gestor debe conocer el progreso del proyecto con los costos anuales...
Deben redactar documentos concisos y coherentes que resuman la...
Durante la ejecución del proyecto, el costo y dotación...
Algunos elementos a tomar en cuenta cuando se determinan las...
Son problemas típicos de la gestión de proyectos,...
Las empresas orientadas por proyectos tienen como una de sus...
Persona(s) que proporciona(n) los recursos financieros para el...
Una vez detalladas las tareas del proyecto a nivel de paquetes de...
El portafolio de proyectos es:
La descomposición de objetivos generales en objetivos...
El inicio de un proyecto incluye las fases de:
Método cualitativo de análisis de proyectos en el...
Fase de un proyecto en la cual se interpreta el proyecto y se analiza...
El modelo de estimación de costos, en el cuál, los...
Cualquier producto para ejecutar un servicio, o requerido para...
¿Cuál de los siguientes elementos son factores...
Una empresa dedicada al comercio necesita que se desarrolle una...
¿Cuál de los siguientes productos de software son...
Una de las principales metas del trabajo en parejas dentro de las...
Los sistemas de procesamiento en lotes permiten:
El rector de la Universidad Nacional de Loja, solicita que se cree un...
En el proceso de diseño e implementación del software:...
Para el famoso juego del buscaminas, indique cuáles son los...
Si luego de la presentación de una aplicación, el...
Los administradores del proyecto de software se encargan de:
En un procesador de textos, ¿cuáles de los siguientes...
La programación extrema consisten en: ____________
Se desea realizar un sistema de atención al cliente online para...
La UTPL crea un sistema para albergar los datos de las pruebas de...
Se necesita modelar las interacciones entre los actores y los objetos...
Los diagramas  de caso de uso son:
Una aplicación necesita almacenar información sobre...
En el conocido juego de dados del 7: El jugador tira ambos dados y...
Para un caso de estudio en donde se busque simular el comportamiento...
La metodología que se basa en el desarrollo de un sistema como...
Al estudiar Ingeniería de Software, uno de los objetivos...
Un ingeniero en desarrollo de software no debe preocuparse por temas...
El objetivo básico de un estudio de viabilidad es:
Un estudio formal de viabilidad probablemente contenga:
¿Por qué es importante que el acta de constitución...
En general, las habilidades técnicas de un gerente de proyecto:
El acta de constitución del proyecto es un documento expedido...
En una estructura matricial:
El acta de constitución del proyecto debe contener:
Usted es el director de proyectos para la construcción de un...
La planificación de la estimación de los recursos de...
La planificación de calidad es el proceso de
Benchmarking puede ayudar a determinar:
Los diagramas de Hitos:
Un programa se considera que es:
El Plan de Gestión de las Comunicaciones es una entrada...
Todas las herramientas y técnicas manuales o automatizadas...
La Oficina del Proyecto es
El plan de gestión de comunicaciones es un documento que brinda
¿Cuál de las siguientes opciones involucra determinar las...
Se diseña una aplicación destina a la venta y...
En el momento de diseñar sistemas grandes, además de los...
 Una de las estrategias de la Programación Extrema es la...
En Ingeniería de Requerimientos, al momento de identificar los...
La ingeniería de software: 
Entre las cualidades más relevantes para un producto de...
El modelo de proceso en cascada: 
El modelo de proceso V 
En clase se presentaron dos variantes de modelos de proceso en fases...
Un director de proyecto debe tener: 
¿Por qué interesa determinar el camino crítico?
La productividad es  _______
Para estimar el personal requerido, lo mejor es: 
En las técnicas de medición del avance para productos...
Los prototipos tempranos son recomendados en una situación...
Las redes de Petri:  
Con respecto a los requisitos 
Respecto a la arquitectura de software  
Los estilos de Arquitectura de Software implican la definición...
¿Es la memoria que se utiliza para acelerar el proceso, es de...
play-Mute sad happy unanswered_answer up-hover down-hover success oval cancel Check box square blue
Alert!